ML17207A694

From kanterella
Jump to navigation Jump to search

SER Opposing Proposed Tech Spec Changes That Remove Requirement for 8-h Ac Power Source Surveillance When Limiting Conditions for Operation Are Not Met.Changes Do Not Conform to Reg Guide 1.93 or Tech Specs
ML17207A694
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/30/1979
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17207A693 List:
References
TAC-6726, NUDOCS 7912310152
Download: ML17207A694 (3)


Text

SAFETY EVAUATION REPORT ST.

LUCIE 1

PROPOSED TECHNICAL SPECIFICATION CHANGE TAC 6726 SEPTEMBER 1979 PREPARED BY PLANT SYSTEMS BRANCH DIVISION OF OPERATING REACTORS

SAFETY EVALUATION REPORT PROPOSED TECHNICAL SPECIFICATION CHANGES ST.

LUCIE 1

1.0 INTRODUCTION

By letter dated September 8, 1978, the Florida Power and Light Company submitted proposed Technical Specifications changes to surveillance requirements for AC power sources when LCO power conditions are not met.

2,0 EVALUATION'he enclosed Technical Eva'luation Report was prepared for us by EG&G Idaho, Inc.,

as part of our DOR technical assistance program.

3.0 PROPOSED TECHNICAL SPECIFICATION CHANGES The licensee proposed'hanges that would remove the requirement for an eight-hour verification of the offsite AC power source(s) integrity and the availability of the remaining diesel-generator(s) if operation is allowed when "Limiting Conditions for Operation" AC power requirements are not met.

We find these proposed changes unacceptable.

4.0 CONCLUSION

S The Florida Power and Light Company proposed Technical Specification changes in their letter dated September 8,

1978 are unacceptable on the basis that the removal of the eight-hour surveillance of AC power sources during operation when LCO requirements are not met is not in agreement with Regulatory Guide 1.93 and the PWR Standard Technical Specifications.

Consequently, we recommend that the proposed changes not be incorporated into the existing St. Lucie 1 Technical Specifications.

1