ML17207A692
| ML17207A692 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 12/07/1979 |
| From: | Lainas G Office of Nuclear Reactor Regulation |
| To: | Reid R Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17207A693 | List: |
| References | |
| NUDOCS 7912310148 | |
| Download: ML17207A692 (4) | |
Text
DISTRIBUTION:
NRC PDR Central Filets PSB.Reading r
QEC 7 1979 NEttORANDUt1 FOR:
R. Reid, Chief, gperating Reactors Branch 04, DOR FROll::
G. Lainas, Chief, Plant Systems
- Branch, DOR
SUBJECT:
ST.
L C
CHANGE (TAC 6 l
IE 1:
EVALUATION OF PRBPOSED TECHNICAL SPECIFICATION OF 'LIt1ITING"CONDITIONS FOR OPERATION FOR AC POWER'6)
In accordance with your requ'est'-per TAC 6726, enclosed is. the Plant Systems" Branch Safety Evaluation pep'.t'pertaining to the St. Lucie 1 proposed Technical Specification chanteys on surveillance, requirements for AC power sources.
Me find the licensee's proposed Technical Specification changes unacceptable on the basis that they do not conform to Regulatory Guide 1.93 and the PHR Standard Technical Specifications.
As such, the licensee should be notified that the proposed Technical Specification changes dated September 8,
1978 are not acceptable. for incorporation into the existing St. Lucie 1
Technical Specifications.
Contact:
=
P. Shemanski, X-28077
Enclosure:
Safety Evaluation Report
'I G. Lainas, Chief Plant Systems Branch Division of Operating Reactors FI<gipy
~Q)ggy gg((p
-, cc w/enclosure:
D. Eisenhut B.. Grimes W; Gammill P. Eri ckson H. Conner G. Lainas.
r D. Tondi P.
Shemanski PSB Section A
'""~ol<S~ 0 ornca~
OcllMAMC~
OATCW DOR:PSB PShemansks LL j)jj)/?9,......,.
DOR: SL/PSB DTondi ~
/2'/
b /79 D
~
GL nas.
/2/
/-79
~ ~
SEC POR5f 318 (976) NECK OWO
- U~ OOVSANMSNf PIIINTIH4 OPPICCI I ~)I a ~ A
) ~ 0
k r
g H
N h
~
'gt 4
gp,S AE0y 1p
+
0
~)
I 0
l*W+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 QEC 7
1 i"";
0 MEMORANDUM FOR:
R. Reid, Chief, Operating
- Reactors, Branch ¹4, DOR FROM:
SUBJECT:
G. Lainas, Chief, Plant Systems
- Branch, DOR ST.
LUCIE 1:
EVALUATION OF PROPOSED TECHNICAL SPECIFICATION CHANGES OF 'LIMITING CONDITIONS FOR OPERATION FOR AC POWER'TAC 6726)
In accordance with your request per TAC 6726, enclosed is the Plant Systems Branch Safety Evaluation Report pertaining to the St. Lucie 1 proposed Technical Specification changes on surveillance requirements for AC power sources.
We find the licensee's proposed Technical Specification changes unacceptable on the basis that they do not conform to Regulatory Guide 1.93 and the PWR Standard Technical Specifications.
As such, the licensee should be notified that the proposed Technical Specification changes dated September 8,
1978 are not acceptable for incorporation into the existing St. Lucie 1
Techni ca 1 Speci fi ca tions.
(I,
(.pi.
I G. Lainas, Chief I
Plant Systems Branch Division of Operating Reactors
Contact:
P. Shemanski, X-28077
Enclosure:
Safety Evaluation Report cc w/enclosure:
D. Eisenhut B. Grimes W.
Gammil1 P. Erickson M. Conner G. Lainas D. Tondi P.
Shemanski PSB Section A