Forwards IE Insp Rept 50-389/79-18 on 791009-12 & Notice of Violation
ML17207A652
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/05/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17207A650 List:
References
NUDOCS 7912180357
Download: ML17207A652 (2)


See also: IR 05000389/1979018

Text

~fl REPp

~a

Cy

r

a

Vl

,r

a

g

+p

gO

++*++

In Reply Refer To:

RII:JJL

50-389/79-18

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

HOV -5 1979

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President,

Advanced Systems

and Technology

P.

O. Box 529100

Miami, FL

33152

Gentlemen:

This refers

to the

inspection

conducted

by J. J.

Lenahan of this office on

October 9-12,

1979,

of activities

authorized

by

NRC Construction

Permit

No.

CPPR-144 for the St. Lucie facility, and to the discussion of our findings held

with B. J. Escue at the conclusion of the inspection.

Areas

examined

during the inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

One

new unresolved

item resulted

from this inspection

and is discussed

in the

enclosed report.

This item will be examined during subsequent

inspections.

During the inspection, it was

found that certain activities under your license

appear to be in noncompliance with NRC requirements.

These

items

and references

to pertinent requirements

are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions.

Section 2.201 requires

you to submit to this office, within 20 days of

your receipt of this notice,

a written statement or explanation in reply including:

(1) corrective steps

which have been taken by you and the results

achieved;

(2)

corrective steps

which will be taken to avoid further noncompliance;

and (3) the

date when full compliance will be achieved.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title

10, Code of Federal Regulations,

a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold

such

information from public disclosure.

Any such application must

include

a full statement

of the reasons

on the basis of which it is claimed that

the information is proprietary,

and

should

be

prepared

so that proprietary

information identified in the application is contained in a separate

part of the

document. If we do not hear from you in this regard within the specified period,

the report willbe placed in the Public Document Room.

Florida Power and Light Company

VOV -S 1979

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

C. E. Murph

,

ief

Reactor Construction

and Engineering

Support Branch

'Enclosures:

l.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-389/79-18

cc w/encl:

C.

M. Wethy, Plant Manager

P. 0. Box 128

Ft. Pierce,

FL

33450

Nat Weems, Assistant

(}A Manager

~

~

~

P. 0.

Box 128

Ft. Pierce,

FL

33450