Forwards IE Insp Rept 50-389/79-14 on 790911-14 & Notice of Violation
ML17207A632
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/12/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17207A630 List:
References
NUDOCS 7912110203
Download: ML17207A632 (3)


See also: IR 05000389/1979014

Text

,II

C

~R RERy

~4

~o

'e

J

ClO

IVl

Op

V/+n

~O

++*++

In Reply Refer To:

RII:NE

50-389/79-14

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

10l MARIETTA ST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

OCT 12 j97S

Florida Power and Light Company

Attn:

R. E. Uhrig, Vice President

Advanced Systems

and Technology

Post Office Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by N. Economos of this office on

September

11-14,

1979 of activities authorized by NRC Construction Permit No.

CPPR-144 for the St. Lucie facility, and to the discussion of our findings held

with B. J. Escue at the conclusion of the inspection.

e

Areas examined during the inspection

and our findings are discussed

in the

enclosed inspection report.

Within these

areas,

the inspection consisted of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

We have examined actions

you have taken with regard to previously identified

enforcement matters

and unresolved

items.

The status of these

items is dis-

cussed in the enclosed report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

This item and references

to pertinent requirements

are listed in the Notice of Violation enclosed

here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's "Rules of Practice", Part 2, Title 10,

Code of

Federal Regulations.

Section 2.201 requires you to submit to this office,

within 20 days of your receipt of this notice,

a written statement

or ex-

planation in reply including:

(1) corrective steps

which have been taken by

you,

and the results

achieved;

(2) corrective steps

which will be taken to avoid

further noncompliance;

and (3) the date

when full compliance will be achieved.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room. If this

report contains

any information that you (or your contractor) believe to be

proprietary, it is necessary

that you make

a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include

a full statement of the reasons

on the basis of which

it is claimed that the information is proprietary,

and should be prepared

so

F9 191 19 +~3

1

Florida Power and Light Company

OCT 12579

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document

Room.

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

. E.

urphy, Chief

Reactor Construction

and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-389/79-14

cc w/enclosures:

C.

M. Wethy, Plant Manager

Post Office Box 128

Ft. Pierce, Florida

33450

Nat Weems, Assistant

gA Manager

Post Office Box 128

Ft. Pierce, Florida

33450