ML17207A557

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-335/79-20 on 790820-24 & Notice of Violation
ML17207A557
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/21/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17207A555 List:
References
NUDOCS 7911130075
Download: ML17207A557 (3)


See also: IR 05000335/1979020

Text

~R AEONS

0

Wp

O

vi

e

Op

Vg+

~O

++*++

In Reply Refer To:

RII:RWZ

50-335/79-20

UNITEDSTATES

NUCLEAR REGULATORYCOMMISSION

REGION II

10'I MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

Sgp 211979

Florida Power and Light Company

Attn:

R. E. Uhrig, Vice President

Advanced

Systems

and Technology

Post Office Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection conducted

by R.

W. Zavadoski of this

office on August 20-24,

1979 of activities authorized by NRC License No.

DPR-67 for the St. Lucie facility, and to the discussion of our findings

held with C.

M. Wethy at the conclusion of the inspection.

The inspection

was an examination of the activities conducted

under your

license

as they relate to radiation safety and to compliance with the

Commission's

rules

and regulations

and the conditions of your license.

The inspection consisted of selective

examinations of procedures

and

representative

records,

interviews with personnel,

and observations

by

the inspector.

'

During the inspection, it was found that certain activities under your

license

appear to be in noncompliance with NRC requirements.

These

items

and references 'to pertinent requirements

are listed in the Notice

of Violation enclosed

herewith as Appendix A.

This notice is sent to

you pursuant to the provisions of Section 2.201 of the NRC's "Rules of

Practice", Part 2, Title 10,

Code of Federal Regulations.

Section 2.201

requires

you to submit to this office, within 20 days of your receipt of

this notice,

a written statement

or explanation in reply including:

(1)

corrective steps

which will be taken to avoid further noncompliance;

and (3) the date

when full compliance will be achieved.

'

In accordance

with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public Document

Room. If this report contains

any inforamtion that you (or your contractor)

believe to be proprietary, it is necessary

that you make

a written

application within 20 days to this office to withhold such information

from public disclosure.

Any such application must include

a full statement

of the reasons

on the basis of which it is claimed that the information

is proprietary,

and should be prepared

so that proprietary information

SEP 81~979

Florida Power and

Light Company

identified in the application is contained in a separate

part of the

document.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should you have any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

. T. Sutherland,

Chief

Fuel Facility and Materials

Safety Branch

Enclosures:

l.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-335/79-20

cc w/enclosures:

C.

M. Wethy, Plant Manager

Post Office Box 128

Ft. Pierce, Florida

33450

Nat Weems, Assistant

gA Manager

Post Office Box 128

Ft. Pierce, Florida

33450