ML17207A532
| ML17207A532 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 10/11/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17207A529 | List: |
| References | |
| 790911, NUDOCS 7911080165 | |
| Download: ML17207A532 (4) | |
See also: IR 05000335/1979021
Text
T
I5'
~8 AEgy~
c~
~o
Op
0
I
cO
+~
gO
++*++
In Reply Refer To:
RII:WAR
50-335/79-21
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
1 1 1979
Florida Power and Light Company
ATTN:
R. E. Uhrig, Vice President
Advanced Systems
and Technology
P. 0. Box 529100
Miami, FI
33152
Gentlemen:
This refers
to the inspection
conducted
by
W. A. Ruhlman of this office on
August 20-24,
1979, of activities authorized
by NRC Operating License No. DPR-67
for the St. Lucie facility, and to the discussion
of our findings held with
C.
M. Wethy at the conclusion of the inspection.
Areas
examined
during the inspection
and
our findings are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
We have
examined
actions
you have
taken with regard to previously identified
enforcement matters.
These are discussed in the enclosed inspection report.
Five new unresolved
items resulted
from this inspection
and are discussed
in the
enclosed report.
These items willbe examined during subsequent
inspections.
During the inspection, it was
found that certain activities under your license
appear
to be in noncompliance
with NRC requirements.
This item and references
to pertinent requirements
are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's "Rules of Practice," Part 2, Title 10,
Code of Federal Regula-
tions.
Section 2.201 requires
you to submit to this office, within 20 days of
your receipt of this notice,
a written statement or explanation in reply including:
(1) corrective steps
which have been taken by you and the results
achieved;
(2)
corrective steps
which will be taken to avoid further noncompliance;
and (3) the
date when full compliance will be achieved.
In accordance
with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title
10, Code of Federal Regulations,
a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary
that. you make
a written application within 20 days to this office to
withhold such
information from public disclosure.
Any such application
must
include
a full statement of the reasons
on the basis of which it is claimed that
the information is proprietary,
and
should
be prepared
so that proprietary
information identified in the application is contained in a separate
part of the
document. If we do not hear from you in this regard within the specified period,
the report willbe placed in the Public Document Room.
q'yl080
< ~S
Ek
V
Florida Power and Iight Company
1
1 1979
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
E. c.
R.
C.
ewis, Acting Chief
Reactor Operations
and Nuclear
Support Branch
Enclosures:
l.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-335/79-21
cc w/encl:
C.
M. Wethy, Plant Manager
P. 0.
Box 128
Ft. Pierce,
FL
33450
Nat Weems, Assistant
gA Manager
P. 0. Box l28
Ft. Pierce,
FL
33450
~
~