Forwards IE Insp Repts 50-335/79-18 & 50-389/79-10 on 790709-13.No Noncompliance Noted
ML17207A384
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/24/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17207A385 List:
References
NUDOCS 7909210099
Download: ML17207A384 (3)


See also: IR 05000335/1979018

Text

pR ~EcyC

~C

Wp0

fy

-) 0

0

. 'C

O

n

qo

W~*y4

In Reply Refer To:

RII:JJI

50-335/79-18

50-389/79-10

'I

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

JUL 2 4 1979

Florida Power and Light Company

R. E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0. Box 529100

Miami, FL

33152

Gentlemen:

This refers

to the inspection

conducted

by J. J.

I,enahan,

of this office on

July 9-13,

1979, of activities authorized

by NRC License No. DPR-6+and Construc-

tion Permit No.

CPPR-144 for the St. Lucie Units

1 and

2 faciliti(s, and to the

discussion of our findings held with B. J.

Escue at the conclusion of the inspec-

tion.

Areas

examined

during the inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

~.l

Within the scope of this inspection,

no items of noncompliance

were disclosed.

One

new unresolved

item resulted

from this inspection

and is discussed

in the

enclosed report.

This item will be examined during subsequent

inspections.

'n

accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title

10,

Code of Federal Regulations,

a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold

such

information from public disclosure.

Any such application

must

include

a full statement

of the reasons

on the basis of which it is claimed that

the information is proprietary,

and should be prepared

so that proprietary infor-

mation identified in the application is contained

in

a separate

part of the

document.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

WOO92>0Q9P

"s

'5

Florida Power and Light Company

"2"

JUL 2 0 ly'g

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

dPW

c

Charles

E. Murphy, Chief

Reactor Construction

and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-335/79-18

and 50-389/79-10

cc w/encl:

C. M. Wethy, Plant Manager

P. 0. Box 128

Ft. Pierce,

FL

33450

Nat Weems, Assistant

gA Manager

P. 0. Box l28

Ft. Pierce,

FL

33450