Forwards IE Insp Rept 50-389/79-08 on 790530-0601 & Notice of Violation
ML17207A336
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/21/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17207A334 List:
References
NUDOCS 7909040058
Download: ML17207A336 (2)


See also: IR 05000389/1979008

Text

~R REo>

P

O::~-':-"

+**+~

In Reply Refer To:

RII:JRH

50-389/79-08

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

JUN 21 879.

Florida Power and Light Company

Attn:

R. E. Uhrig, Vice President

Advanced

Systems

and Technology

Post Office Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by John R. Harris of this office

on May 30 to June

1,

1979 of activities authorized

by NRC Construction

Permit No. CPPR-144 for the St. Iucie facility, Unit 2,

and to the

discussion of our findings held with B. J.

Escue at the conclusion of

the inspection.

Areas

examined during the inspection

and our findings are discussed

in

the enclosed

inspection report.

Within these

areas,

the inspection

consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

During the inspection, it was found that certain activities under your

license

appear to be in noncompliance with NRC requirements.

This item

and references

to pertinent requirements

are listed in the Notice of

Violation enclosed

herewith as Appendix A.

This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's "Rules of

Practice", Part 2, Title 10,

Code of Federal Regulations.

Section 2.201

requires

you to submit to this office, within 20 days of your receipt of

this notice,

a written statement

or explanation in reply including:

(1)

corrective steps

which have been taken by you,

and the results

achieved;

(2) corrective steps

which will be taken to avoid further noncompliance;

and (3) the date

when full compliance will be achieved.

0

In accordance

with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractor)

believe to be proprietary, it is necessary

that you make

a written

application within 20 days to this office to withhold such information

from public disclosure.

Any such application must include

a full state-

ment of the reasons

on the basis of which it is claimed that the information

is proprietary,

and should be prepared

so that proprietary information

identified in the application is contained in a separate

part of the

1OOOO~O~>

Florida Pover and

document. If we do not hear from you in this regard within the specified

period,

the report villbe placed in the Public Document Room.

Should you have any questions

concerning this letter, ve will be glad to

discuss

them with you.

Sincerely,

C. E. Murphy, Chief

Reactor Construction

and

Engineering Support Branch

Enclosures:

l.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-389/79-08

cc w/enclosures:

C.

M. Wethy, Plant Manager

Post Office Box 128

Ft. Pierce, Florida

33450

Nat Weems, Assistant

QA Manager

Post Office Box 128

Ft. Pierce, Florida

33450