Responds to IE Bulletin 79-06B.Initiation & Verification of Auxiliary Feedwater Flow to Steam Generator Is Primary Duty of Operator During Transient & Accident Situations
ML17206A937
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/22/1979
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7908030627
Download: ML17206A937 (2)


Text

I IS,, I

~~4'F~Q pp j>pt'p~

e t O. BOX 529100, MIAMI,FL 33152 FLORIDA POWER II LIGHT COMPANY June 22, 1979 L-79-172 Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U.

S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re:

RII:JPO 50-335 IE Bulletin 79-068 The following inFormation is submitted to supplement our letter L-79-141 of May 25, 1979:

In response b'4 of our letter L-79-79 dated April 24, 1979 we stated that prior to mode 1 operation, instructions will be issued to further ensure that an operator is designated to promptly initiate and verify auxiliary feedwater flow to the steam generator(s),

if needed, during transient and accident situations.

We would like to clarify our response to state that this action would be the primary duty (no other concurrent duties) of the designated operator during such transients and accidents until after the steam generator level(s ) are stabilized.

Very tru

yours, Robert E. Uhrig Vice President Advanced Systems

& Technology REU/MAS/cph cc:

Harold F. Reis, Esquire ka 90808p~q