L-79-141, Responds to IE Bulletins 79-06 & 06B.Responsibility for Initiation & Verification of Auxiliary Feedwater Flow to Steam Generators Is Primary Duty of Designated Operator During Transients & Accidents
| ML17206A887 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point, Saint Lucie |
| Issue date: | 05/25/1979 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| L-79-141, NUDOCS 7907100094 | |
| Download: ML17206A887 (1) | |
Text
. BOX 529100 MIAMI FLA 3 Sg
~y'llI '.
FLORIDA POWER & LlGHT CQMPANV May 25, 1979 L-79-141 Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U.
S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
Re:
RII:JPO 50-335 IE Bulletin 79-06,79-06B In response 84 of our letter L-79-79 dated April 24, 1979 we stated that prior to mode
'> operation, instructions will be issued to further ensure that an operator is designated to promptly initiate and verify auxiliary feedwater flow to the steam generator(s), if needed, during transient and accident situations.
We would like to clarify our response to state that this action would be the primary duty of the designated operator during such transients and accidents, and at such time he would have no concurrent duties.
Very truly yours, Robert E. Uhrig Vice President REU:TCG:cf cc: