ML17206A518

From kanterella
Jump to navigation Jump to search
Forwards IE Inspec Rept 50-335/78-23 on 780926-27 During Which No Items of Noncompliance Were Noted
ML17206A518
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/19/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17206A519 List:
References
NUDOCS 7811220003
Download: ML17206A518 (2)


See also: IR 05000335/1978023

Text

g

~P,8 REGAL

0

)f+*44

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA STR E ET, N.W.

ATLANTA,GEORGIA 30303

OCT 1 9

1978

ps'<

In Reply Refer To:

RII

EHW

50-335/78"23

FLorida Power

and Light Company

Advanced

Systems

and Technology

Attn:

Dr.

R.

E. Uhrig

Vice President

P.

O.

Box 529100

Niami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by N. V. Sinkule

and E. H. Webster

of this office on September

26-27,

1978, of activities authorized

by

NRC

Operating License

No.

DPR-67 for the St. Lucie Unit

1 facility, and to the

discussion

of our findings held with C. N. Wethy at the conclusion of the

inspection.

Areas

examined during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection

consisted

of selective

examinations

of procedures

and representative

records, inter-

views with personneL,

and observations

by the inspectors.

Within the scope of this inspection,

no items of noncompliance

were

disclosed.

One

new unresolved

item resulted

from this inspection

and is discussed

in

the enclosed

report.

This item will be examined during subsequent

inspections.

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this Letter and the enclosed

inspection report wiLL be placed in the NRC's Public

Document

Room. If this

report contains

any information that you (or your contractor)

believe to be

proprietary, it is necessary

that

you make

a written application within 20

days to this office to withhold such information from public disclosure.

Any such application

must include

a fuLL statement

of the reasons

on the

basis of which it is claimed that the information is proprietary,

and

should

be prepared

so that proprietary information identified in the appli"

cation is contained in a separate

part of the document.

If we do not hear

from you in this regard within the specified period, the report will be

placed in the Public

Document

Room.

OCT

1 9

1978

FLorida Power

and

Light Company

Should you have

any questions

concerning this Letter,

we wiLL be glad to

discuss

them with you.

Sincerely,

Reactor Operations

and

Nuclear Support

Branch

EncLosure:

Inspection

Report

No. 50-335/78-23

cc w/encL:

Mr. C.

M. Wethy, Plant

Manager

St. Luci e Plant

P. 0.

Box 128

Ft. Pierce,

FLorida

33450

Mr. Nat

Weems, Assistant

QA Manager

~

~

P. 0.

Box 128

Ft. Pierce,

FLorida

33450