Forwards Safety Evaluation Accepting Util Responses to Station Blackout Rule for Facilities
ML17202U915
Person / Time
Site: Dresden, Quad Cities  Constellation icon.png
Issue date: 12/11/1990
From: Siegel B
Office of Nuclear Reactor Regulation
To: Kovach T
COMMONWEALTH EDISON CO.
Shared Package
ML17202U916 List:
References
TAC-68539, TAC-68540, TAC-68590, TAC-68591, NUDOCS 9012210221
Download: ML17202U915 (4)


Text

,I "0.*,.

It.

December 11, 1990

  • Docket Nos. 50-237, 50-249 50-254, 50-265 Mr. Thomas J. Kovach Nuclear Licensing Manager Commonwealth Edison Company-Suite 300 OPUS West III 1400 OPUS Place Downers Grove, Illinois 60515

Dear Mr. Kovach:

DISTRIBUTION

  • -Docket Fi 1es
    J
  • Poi f1:2* Y.if JZwolinski BSiegel OGC NKTrehan Plant File AGi 11, 7E4 NRC & Local PDRs BBoger, 14E4 CMoore tOlshan EJordan, MNBB 3701 ACRS (10)

WShaf er, RII I

SUBJECT:

SAFETY EVALUATIONS OF THE RESPONSE TO THE STATION BLACKOUT RULE RELATED TO DRESDEN, UNITS 2 AND 3 AND QUAD CITIES, UNITS 1 AND 2 (TAC NOS. 68539, 68540, 68590 AND 68591)

By letters dated April 17, 1989, March 30, 1990 and May 18, 1990, you submitted responses to the Station Blackout (SBO) rule for Dresden, Units 2 and 3 and Quad Cities, Units 1 and 2.

These responses were reviewed by an NRC contractor, SAIC, and the NRC staff. In a letter dated September 26, 1989, you also provided SBO calculations for both Dresden and Quad Cities Stations. In add.ition, meetings were also held between you and the staff on October 4 and 5, 1989, December 20, 1989 and March 28, 1990, to discuss your initial and revised responses to the SBO rule.

Enclosures 1 and 2 contain our Safety Evaluations (SE) related to your response to the SBO rule (10 CFR 50.63) for the Dresden and Quad Cities Stations, respectively. Attachment 1 to Enclosure 1 is the associated SAIC Technical Evaluation Report (TER} SAIC-90/1058, "Dresden Station Units 2 and 3, Stati6n Blackout Evaluation," dated October 26, 1990. to Enclosure 2 is the associated SAIC-90/1071, "Quad Cities Station Units 1 and 2, Station Blackout Evaluation," dated October 26, 1990.

We have determined that your response and proposed method of dealing with an SBO for both stations is acceptable. Since follow-up inspections by the NRC may be performed t9 verify implementation and the adequacy of supporting documentation, it ts requested that you notify the staff by letter when the SBO modifications are complete for each station. Inspection guidance is being deve*loped in the following areas:

a.

Hardware.and procedural modifications,

b.

SBO procedures in accordance with Regulatory Guide 1.155, Position 3.4, and NUMAR( 87-00, Section 4,

c.

operator staffing and training to follow the identified actions in the SBO procedures,

d.

EOG reliability program meet1ng, as a minimum, the guidelines of Regulatory Guide 1.155,

"\\

Mr. Thomas J. Kovach 2 -

  • December 11~ 1990
e. *equipment and components required to cope with an*sso inco~porated into a QA progr_am that meets the guidance of Regulatory.Guide L155, Appendix A, and
  • I'

~.

~

~

f.

actions taken pertaining to the specific recommendations noted in,*.

the SER.

The*guidance provi~ed on Jechnical Specifications (TS) for SBD states that*.

the TS should be consistent with the Interim Commission Policy Statement *on

. Te.chnical Specifications.

  • The staff has taken the position that TS are**

.. :reqtiired for SBO response~equipment. However, th~ ques~ion of.how specifi-

-:cations for the SBO equipment will be applied is currently being considered_

  • .. ~enerically by the NRC 0 in the* context of th~ Technical Specification

~

Improvement Program and. remain~ an open item at this time.. In the interim,:.: -... "

  • .. the staff expec_ts pl ant procedures to reflect 'the qppropri ate testing and.. * :.
  • surv,ei llance requirements. to 'ensure 'the operability *.of the necessary sso:*

.. ~

~qui~ment.* If. the ~taff. l~ter determines th~t TS regarding the SBO eqUipm~nt

/ is warranted, you; wOl be notified of. the implementation req\\,lirements.

.. \\

In accorda'nce with 10' Cf*R-S0.63(c)(4), the schedule for implementation of the

_proposed ha._rdware and* assoc.iated procedµre modifications, including those resulting fro1:nthe. recomme.ndations documented in the SE's, should be p~ovided

'to the*staff within.30 days of receipt of this letter.

If yo~ have. any.questi'Ons or need any clarifi.cations related to* these.SE's or TER's, pJease co.nt'act the appropriate Project Manager for th.e Dresden and Quad Cities: Sta.tion~.;*

Enclosures:

As stated cc w/enclosures:

j' See next page OFFICIAL RECOR.D COPY DOCUMENT NAME: *[KOVACH 68539/40/90/91}

Sincerely,

.Original Signed By:.

Byron. L *. Siegel, Project Manager Project Directorate III-2

_Division -0f Reactor Prbjects III/IV/V Office of Nuclear Reactor Regulation

-~~1 -2:LA PDIII-2:PM~

PDIII-2:~

~~~e BSiegel :tat I LOlshan ~0

\\ 1---f' \\ /90

/2' I,, /90

/J.. I II /90 J -

  • *. :i

~\\

  • ~

Mr. Thomas J. Kovach Commonwealth Edison Company cc:

Michael I. Miller, Esq.

Sidley and Austin One First National Plaza Chicago, Illinois 60690 Mr. J. Eenigenburg Plant Superintendent Dresden Nuclear Power Station Rural Route Ill Morris, Illinois 60450 U. S. Nuclear Regulatory Conmission Resident Inspectors Office Dresden Station Rural Route #1 Morris, Illinois.60450 Chairman Board of Super~isors of Grundy County Grundy County Courthouse Morris, Illinois 60450 Regional Ad~inistrator Nuclear Regulatory Commission, Region III 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 11 ii noi s Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Robert Neumann Office of Public Counsel State of Illinois Center

_100 W. Randolph Suite 11-300 Chicago, Illinois 60601 Dresden Nuclear Power Station Unit Nos. 2 and 3

Mr. Thomas J. Kovach Commonwealth Edison Company cc:

Mr. Stephen E. Shelton Vice President Iowa-Illinois Gas and Electric Company P. O. Box 4350 Davenport, Iowa 52808 Michael I. Miller, Esq.

Sidley and Austin One First National Plaza Chicago, Illinois 60690 Mr. Richard Bax Station Manager Quad Cities Nuclear Power Station 22710 206th Avenue North Cordova, Illinois 61242 Resident Inspector U. S. Nuclear Regulatory Conmission 22712 206th Avenue North Cordova, Illinois 61242 Chairman Rock Island County Board of Supervisors 1504 3rd Avenue Rock Is land County.Office Bldg..

Rock Island, Illinois 61201 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Regional Administrator, Region III U. S. Nuclear Regulatory Commission 799 Ro.oseve 1t Road, B 1 dg. #4 Glen Ellyn, Illinois 60137 Robert Neumann Office of Public Counsel State of Illinois Center 100 w. Randolph Suite 11-300 Chicago, Illinois 60601 Quad Cities Nuclear Power Station Unit Nos. 1 and 2