Docket Nos. 50-237 and 50-249 Mr. Thomas J. Kovach Nuclear Licensing Manager Commonwealth Edison Company-Suite 300 OPUS West II I 1400 OPUS Place Downers Grove, Illinois 60515
Dear Mr. Kovach:
e August 6, 1990 DISTRIBUTION
\\:-_-Docket Fi le *7 POI II-=-2-*r7f-~
CMoore RBarrett EJordan BMozafari NRC & Local JZwolinski BSiegel OGC ACRS (10)
Plant File PD Rs
SUBJECT:
SAFETY EVALUATION FOR GENERIC LETTER 83-28, ITEM 4.5.3, REACTOR_
TRIP RELIABILITY - ON-LINE FUNCTIONAL TESTING OF THE REACTOR TRIP SYSTEM (TAC NOS. 53977 AND 53978) _
Generic Letter 83-28, Item 4.5.3, required confirmation from all licensees and applicants that on-line functional testing of the reactor trip system, including independent testing of the diverse trip feature, was being performed.
By letters dated August 23, 1985, and July 20, 1990, you submitted responses to Generic Letter 83-28, Item 4.5.3. Therein you indicated your endorsement of the BWR Owner's Groups Reports NEDC 30844 and NEDC 30851P, as being applicab1e to Dresden.
The NRC staff, with the assistance of our contractor, Idaho National Engineering Laboratory, has reviewed your responses and the BWR Owners Group's report.
We conclude that the existing intervals for on-line functional testing at Dresden are consistent with achieving high reactor trip system availability.
The enclosed -safet.r evaluation (Enclosure 1) and contractor's report ( EGG-NTA 8341) {Enclosure 21 provide the details and basis for our conclusion. Therefore, we consider Generic Letter 83-28, Item 4.5.3 to be complete.
-This completes all staff activities related to TAC Nos. 53977 and 53978.
.,(.>(>*-*c.-.... -.C"c:-
.-*1 - - - t-
- - - *=-
).;:.(J..::_._1._1
- >'(_ 080
- ;;.
' i PDR - -ADOCK.,05000:2::::7 i I
-- -~~--- -__ -- :_ -~~-< -----'=~11;: --- -- L J
Enclosures:
As stated cc w/enclosure:
See next page OFFICIAL RECORD COPY DOCUMENT NAME:
KOVACH 53977/78
~~ 2:LA PDIII-2:~
- ~~
BSiegel:t
~/IP /90 1 ;-, 1/90 Sincerely, Orlgina\\ Signed By.;
Byron L. Siegel, Project Manager Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation PDII I-2: PD
...!i=Rt:f.tiBarR!PCf!'ife~tFt==-:../, F. WCC/ISE (be£ e/2..._
e; / /90
UNITED ST ATES NUCLEAR REGULATORY COMMISSION Docket Nos. 50-237 and 50-249 Mr. Thomas J. Kovach WASHINGTON, D. C. 20555 August 6, 1990 Nuclear Licensing Manager Connnonwealth Edison Company-Suite 300 OPUS West III 1400 OPUS Place Downers Grove, Illinois 60515
Dear Mr. Kovach:
SUBJECT:
SAFETY EVALUATION FOR GENERIC LETTER 83-28, ITEM 4.5.3, REACTOR TRIP RELIABILITY - ON-LINE FUNCTIONAL TESTING OF THE REACTOR TRIP SYSTEM (TAC NOS. 53977 AND 53978)
Generic Letter 83-28, Item 4.5.3, required confirmation from all licensees and applicants that on-line functional testing of the reactor trip system, including independent testing of the diverse trip feature, was being performed.
By letters dated August 23, 1985, and July 20, 1990, you submitted responses to Generic Letter 83-28, Item 4.5.3. Therein you indicated your endorse~ent of the BWR Owner's Groups Reports NEDC 30844 and NEDC 30851P, as being applicable to Dresden.
The NRC staff, with the assistance of our contractor, Idaho National Engineering Laboratory, has reviewed your responses and the BWR Owners Group's report.
We conclude that the existing intervals for on-line functional testing at Dresden are consistent with achteving high reactor trip system availability.*
The enclosed safety evaluation (Enclosure 1) and contractor's report (EGG-NTA 8341) (Enclosure 2) provide the details and basis for our conclusion. Therefore, we consider Generic Letter 83-28, Item 4.5.3 to be complete.
This completes all staff activities related to TAC Nos. 53977 and 53978.
Enclosures:
As stated cc w/enclosure:
See next page Sincerely, *
~
/:161.ject Manager.
Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Mr. Thomas J. Kovach Commonwealth Edison Company cc:
Michael I. Miller, Esq.
Sidley and Austin One First National Plaza Chicago, Illinois 60690 Mr. J. Eenigenburg Plant Superintendent Dresden Nuclear Power Station Rura 1 Route 111 Morris, Illinois 60450 U. S. Nuclear Regulatory Commission Resident Inspectors Office Dresden Station Rura 1 Route 111 Morris, Illinois 60450 Chairman Board of Supervisors of Grundy County Dresden Nuclear Power Station Unit Nos. 2 and 3 Grundy County Courthouse Morris, Illinois 60450 Regional Administrator Nuclear Regulatory Commission, Region III 799 Roosevelt Road, Bldg: 114 Glen Ellyn, Illinois 60137 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Robert Neumann Office of Public Counsel State of Illinois Center 100 W. Randolph Suite 11-300 Chicago, Illinois 60601