Discusses Review of Addl Studies Re LPCI Swing Bus Transfer Scheme.Addl Studies Requested Re Fault Coordination,Effects of Dc Power Failures on ECCS Availability & Failure Mode & Effect Analysis of Proposed Design Mod
ML17201M874
Person / Time
Site: Dresden, Quad Cities, 05000000
Issue date: 02/02/1989
From: Ross T
Office of Nuclear Reactor Regulation
To: Bliss H
COMMONWEALTH EDISON CO.
References
TAC-69366, TAC-69367, NUDOCS 8902080492
Download: ML17201M874 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket Nos.: 50-237, 50-249, 50-254, and 50-265 Mr. Henry E. Bliss Nuclear Lic~nsing Manager Connnonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690

Dear Mr. Bliss:

February 2, 1989

SUBJECT:

REVIEW OF ADDITIOl~AL STUDIES RELATED TO THE LPCI SWING BUS TRANSFER-SCHEME USED AT DRESDEN AND QUAD CITIES (TAC NOS. 69366 AND 69367)

Re:

(a) October 13, 1988 letter from T. Ross to T. E. Murley (b)

May 13, 1988 letter from J. A. Silady to T. E. Murley (c) June 21, 1988 letter from J. A. Silday to T. E. Murley (d) July 8, 1988 letter from I. M. Johnson to T. E. Murley of Reference (a) transmitted to you.our Safety Evaluation Report (SER} on a design de(iciency discovered in the Low Pressure Coolant Injection

{LPCI) swing bus transfer scheme for Dresden (Unit 2 & 3) and Quad Cities (Unit 1 & 2). During the process of developing our SER, we had requested that Commonwealth Edison Company (CECo) conduct some additional studies regarding:

1) Fault coordination, 2} Effects of DC power failures on Emergency Core Cooling System (ECCS} availability, and 3} Failure mode and effect analysis

{FMEA) of their proposed design modification. These studies were to provide us with further assurance that no LPCI swing bus design flaws existed and sufficient ECCS equipment would be available following any postulated single DC power failure.

CECo submitted the aforementioned studies, referenced above as (b), (c), and (d), for NRC staff review.

We have completed reviewing this information and conclude that these studies do not reveal any new single (DC power related) failures which would affect either the transfer scheme or ECCS availability.

8902080492 990202

\\" ;

PDR **ADOCK; o.5000237 *L j' p

PNU _ _ _:. __

I 1-1

'1 ~ro/

~\\~'

  • (v

/

/

Henry E. Bliss 2 -

Furthermore, adequate coordinations, as described by CECo, exist among breakers associated with the LPCI swing bus.

We concur with CECo that the LPCI swing bus transfer scheme design flaw was an isolated case.

Principal Reviewer:

P. Kang cc:

See next page

~#.~4--

Thierry~ Ross, Project Manager Project Directorate III-2 Division of Reactor Projects III, IV, V, and Special Projects

Mr. Henry E. Bliss Commonwealth Edison Company cc:

Michael I. Miller, Esq.

Sidley and Austin One First National Plaza Chicago, Illinois 60603 Mr. J. Eenigenburg Plant Superintendent Dresden Nuclear Power Station Rural Route: Ill Morris, Illinois 60450 U. S. Nuclear Regulatory Commission Resident Inspectors Office Dresden Station Rural Route #1 Morris, Illinois 60450 Chairman Board of Supervisors of Grundy County Grundy County Courthouse

~Morris, Illinois 60450 Regional Administrator Nuclear Regulatory Commission, Region III 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 Mr. Michael E. Parker, Chief Division of Engineering Illinois Department of Nuclear Safety 1035 Outer Park Drive, 5th Floor

. Springfield, Illinois 62704 Dresden Nuclear Power Station Units 2 and 3

n !

'l.

Mr. Henry E. Bliss Conmonwealth Edison Company cc:

Mr. Stephen E. Shelton Vice President Iowa-Illinois Gas and Electric Company P. 0. Box 4350 Davenport, Iowa 52808 Michael I. Miller, Esq.

Sidley and Austin One First National Plaza Chicago, Illinois 60603 Mr. Richard Bax Station Manager Quad Citi~s Nuclear Power Station 22710 206th Avenue North Cordova, Illinois 61242 Resident Inspector U. S. Nuclear Regulatory Commission 22712 206th Avenue North Cordova, Illinois 61242 Chainnan Rock Island County Board of Supervisors 1504 3rd Avenue Rock Island County Office Bldg.

Rock Island, Illinois 61201 Mr. Michael E. Parker, Chief Division of Engineering Illinois Department of Nuclear Safety 1035 Outer Park Drive, Springfield, Illinois 62704 Regional Administrator, Region III U. S. Nuclear Regulatory Convnission 799 Roosevelt Road, Bldg. #4 Glen Ellyn. Illinois 60137 Quad Cities Nuclear Power Station

  • Units 1 and 2

.- _February 2, -,*_98.

)

2 -

)

- I Furthermore, adequate coordinations, as described by CECo~ exist among breakers

-associated wit~ the LPCI swing-bus.

We concur With CECb that the LPCI swing

  • bus t~ansfer ~cheme design flaw was an isolated case.

Principal Reviewer: *P. Kang*

- DISTRIBUTION:'

-_toocket fit~j

-'LLutfler DMuller ACRS (10)

Thierry M. Ross, Project Manager Project Directorate III.Division of Reactor projects III, IV,* V, and Special Projects

\\

TRoss P. Kang BGrimes*

PDII I-2 r/f --

.. GHo lahan EJordan Plant -f; le NRC & Local PD Rs -"

-__ OGC.

  • See previous concurrence PDIII-2
  • Lluther:km 2/ 0'2 /89 PDII I-2
  • TRoss 2/ 02 /89

-- ' j.,

POI I r,;.;2-*'.- --

  • DMu-ller:.

21 oiJB9.-

'\\,*

i:,

1,'

~

i I

.1

  • ~-- r I
  • !l,

=..-. :~--~-=--=-~---=-*~*-=~-- _-..;..*:-

~~-**-: -:.:..~= ~*

-~-*.:* __._::::;.-.*~*----=--:.=-=...-:-......:..;..:-:.-=..:-.:..-*~-:.-_"'-=.....~-~.:..*~~:;.*.~T-::::.:::--..;_::"-:'.:t..":-":!:~~:.::~":::'i:!...::=-:-*.;.:..:::""::;-:-

~ :.~:,.*.~-:--*:-..;.::--:*.* *..:..: *.:::::...*.::...........:.~ -.:--~-==---~....:._=:-.-:::...---=

\\

Henry E. Bliss Furthermore, adequate coordinations, as described,by CE~o, ex.ist amon breakers associated with the LPCI swing bus.

We.,cQncur with'CECo.that the LPn swing bus transfer scheme design flaw was an isolated* c~~e~

(*

~--*I

-~ f I

' \\

~'

.i'

-... ~.

Thierry M.- Ross, P;roject '4anager Project:Director~te 111-2 nivi~ion of Re~o~ Projects III~

IV, V, and Specia 1. Projects Principal R~viewer: P. Kang

~

.I '

L

--~~--:.

    • --~~~~-~~--~-
  • 1.

... -**--:-r*

Cc

  • f" I:" '\\f' 'f.. '**I*'> *"1

.,,.. ;: *,*,, *' *l.r., '-' -* t.

See next*page DISTRIBUTION:

Docket file

  • Lluther *.-*

BGrimes -

\\.

POI 11-2 J vJ Lluthe~

2/.;i... /89 PDIII-~

TRoss r1rl-2/ y /89 DMuller ACRS (10)

PDIII-2 r/f OGC

~~~

2/ 'l /89 TRoss GHolahan EJordan Plant file P. Kang