JUN 19 1986
.~;..'--
DISTRIBUTiON:
Docket No. 50-237/249
'Docket Nb. *.50::-23? /_2~~ -:3**,
NRCPDR *--
local
- PDR--* *.
BW0-1",,r/f CJamerson JZwol inski*
~.
- RGi)bert >.*' *.
l', ".
Mr. Dennis l. Farrar*
Director of Nuclear Licensing Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690 RBernero Attorney, OECcf
. KPerkfos ::.
- EJordan
..,.: * ::.; : ~.JP.artl ow.
BGrimes
- *. Ac:Rs* (10)
Dear Mr. Farrar:
SUBJECT:
. EMERGENCY COMMUNICATION *SYSTEM AT LI:CENSEE -PLANT _SiTES (TAC 61506, 61505)
Re:
Dresden Nuclear Power Station, Unit Nos. 2 and 3
... *1-}
This letter is to inform you about NRC directed work to be done'i.to'the Health Physics Network (HPN) circuitry for the Technical Support Center (TSC) and Emergency Offsite Facility (EDF).
This work does not require any action on your part ~xcept to allow the phone company to do the work at the TSC _and EOF.
The HPN and the Emergency Notification System (ENS) are the emergency communication system between the licensees and the NRC.
The NRC has decided that the HPN currently installed does not provide acceptable service.
NRC is fn the process of having the phone companies replace the current circuitry with commercial service. This will be for only an interim period until a more dedicated service is available. The existing HPN service is currently in the TSC and EOF and may be in your Health Physics office and Re~ident's Inspector's offke. The new HPN service will be located only in the TSC and EOF and the existing service will be removed from the other areas. This *is being done for all plants including Dresden; however, there. is no schedule at present for when this work will be done for Dresden.
You will be-notified that this work is to be done by the Illinois Bell Company.
You are requested to have the company complete the work as soon ~s possible.
If this work results in changes to the Dresden Emergency Plan and/or its implementing procedures, ensure the appropriate changes are made within a month of when the current HPN is replaced.
Immediate pen and ink changes should be made to the Plan and procedures at the TSC and EOF.
You are also requested to notify the NRC Operations Center when this work is scheduled to be done, when it is being done and when it is completed.
The phone company contact is Ray Fouche (312: 655-5042), the Region I1I coordi~ator is Monte P.
Phillips (312: 790-5530) and the Dresden site coordinator is Terry Ziak.is.*
(.8606260063 86061 Cf '.
I PDR* ADOCK.05000237
~ F
__ _ ________ f=>p_R cc:
See Next Page Sincerely, ORIGil!L SIGHED BY Robert A. Gilbert, Project Manager BWR Project Directorate #1 Division of BWR Licensing OBL:P~
DBL:~
RGilbert JZwolinski 6/l'I /86 6/t'- /~6' '*
,~ -
.!.f
. : ~**......-*........ ***"*****~*-* *~*-*.<<......... *....
h.. :.-:r.~..*..* -....................... -.******~*
... *-............ ~ --... *:......
Mr. Dennis L. Farrar Commonwealth Edison Company cc:
Mr. Michael I. Miller Isham, Lincoln & Beale Three First National Plaza Suite 5200 Chicago, Illinois 60602 Mr. Doug Scott Plant Superintendent Dresden Nuclear Power Station Rural Route #1 Morris, Illinois 60450 U. S. Nuclear Regulatory Commission Resident Inspectors Office Dresden Station Rural Route #1 Morris, Illinois 60450 Chairman Board of Supervisors of Grundy County
- Grundy County Courthouse Morris, Illinois 60450 Regional Administrator Nuclear Regulatory Commission, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Gary N. Wright, Manager Nuclear Facility Safety Illinois Department of Nuclear Safety 1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 Dresden Nuclear Power Station Units 1, 2 and 3