Forwards Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Implications of Salem ATWS Events),Item 1.2..., Technical Evaluation Rept.Addl Info Required
ML17195B003
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 11/04/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
Shared Package
ML17195B004 List:
References
GL-83-28, LSO5-85-11-007, LSO5-85-11-7, NUDOCS 8511060028
Download: ML17195B003 (3)


Text

-'.)

Docket No.

50-237/24~

LS05-85-l l -007 Mr. Dennis L. Farrar Director of Nuclear Licensing Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690

Dear Mr. Farrar:

j

SUBJECT:

DRAFT TECHNICAL EVALUATION REPORT FOR SALEM ATWS ITEM 1. 2 (GENERIC LETTER 83-28)

Re:

Dresden Nuclear Power Station, Unit Nos. 2 and 3 The staff has completed a preliminary review to assess the completeness and adequacy of licensee responses to Generic Letter 83-28 Item 1.2.

For Dresden 2 and 3 your response was found to be incomplete in three of the areas evaluated.

The enclosed TER provides a technical evaluation representing the staff's initial judgment of the areas evaluated.

Pen and ink changes have been made to the TER by your project manager to make the wording consistent with our approach.

In order to preserve our present review schedule, we would appreciate your cooperation in obtaining additional information that will permit us to complete our review.

It would appear that the needed information on your facility could be obtained by telephone conference within one week of your receipt of the DRAFT TER.

Your project manager will be working with you to arrange an acceptable time to conduct the necessary conference calls.

Enclosure:

DRAFT TER on Salem J\\TWS Items 1. 2 cc w/enclosure:

See next page DISTRIBUTION Docket NRC PDR Local PDR ORB#5 Rdg HThompson OELD EJordan BGrimes JPartlow BGilbert CJamerson ACRS ( 10 DL:ORB#5 CJamerson 1~/' /85 ABournia GHolahan JZwolinski DL:~

RGil bert: tm 1~/ tf /85 Sincerely,

~~lw John A. ~~nski, Chief Operating Reactors Branch No. 5 Division of Licensing

~

DL:ORB#5 JZwolinski 1~/ I( /85

e e

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket No. 50-237/249 LS05-85-l l -007 Mr. Dennis L. Farrar Director of Nuclear licensing Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690

Dear Mr. Farrar:

November 4, 1985

SUBJECT:

DRAFT TECHNICAL EVALUATION REPORT FOR SALEM ATWS ITEM 1.2 (GENERIC LETTER 83-2?-)

Re:

Dresden Nuclear Power Station, Unit Nos. 2 and 3 The staff has completed a preliminary review to assess the completeness and adequacy of licensee responses to Generic letter 83-28 Item 1.2.

For Dresden 2 and 3 your response was found to be incomplete in thtee of the areas evaluated.

The enclosed TER provides a technical evaluation representing the staff's initial judgment of the areas evaluated.

Pen and ink changes have been made to the TER by your project manager to make the wording consistent with our approach.

In order to preserve our present review schedule, we would appreciate your cooperation in obtaining additional information that will permit us to complete our review.

It would appear that the needed information on your facility could be obtained by telephone conference within one week of your receipt of the DRAFT T~P. Your project manager will be working with you to arrange an acceptable time to conduct the necessary conference calls.

Enclosure:

DRAFT TEP on Salem ATWS Items 1. 2 cc w/enclosure:

See next page Siner+ ~v-U.

J~ A. Zwolinski, Chief Operating Reactors Branch No. 5 Division of Licensing

Mr. Dennis L. Farrar Commonwealth Edison Company cc:

Robert G. Fitzgibbons Jr.

Isham, Lincoln & Beale Three First National Plaza Suite 5200 Chicago, Illinois 60602 Mr. Doug Scott Plant Superintendent Dresden Nuclear Power Station Rural Route #1 Morris, Illinois 60450 U.

  • S. Nuclear Regulatory -Commission Resident Inspectors Office Dresden Station Rura 1 Route #1 Morris, Illinois 60450 Chairman Board of Supervisors of Grundy County Grundy County Courthouse Morris, Illinois 60450

~egional Administrator

  • Nuclear Regulatory Commission, Region III 799 Roosev~lt Road Glen Ellyn, Illinois 60137 Gary N. Wright, Manager Nuclear Facility Safety Illinois Department of Nuclear Safety 1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 Dresden Nuclear Power Station Units 1, 2 and 3