Docket No. 50-237 LS05-83-ll-047 Mr. Dennis L. Farrar Director of Nuclear Licensing Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690
Dear Mr. Farrar:
-~
November 29, 1983 DISTRIBUTION
'CfQ'."ock~t")
ELJordan NRC..l>PDR JMTayl or Local PDR ACRS (10)
ORB #5 Reading SEPB DCrutchfield HSmith RGilbert BLiaw NSIC OELD
SUBJECT:
CONFIRMATION OF STAFF APPROVAL FOR RESTART OF DRESDEN UNIT 2 FOLLOWING MID-CYCLE INSPECTION OF PIPE CRACK INDICATIONS ALLOWED TO REMAIN UNREPAIRED DURING CYCLE 9 OPERATION Dresden Nuclear Power Station, Unit No. 2 This letter confirms the permission given verbally to Commonwealth Edison Company (CECo) on November 11, 1983 to restart Dresden Unit 2 following the mid-cycle inspection of pipe crack indications allowed to remain unrepaired during Cycle 9 operation. It also represents the staff 1s assessment of ultrasonic testing (UT) data submitted by CECo in a letter dated November 18, 1983.
This submittal furnished the results of UT on the unrepaired welds as reviewed by CEC0 1s contractor and your own Level III UT inspectors.
The overall UT examination was also observed by a Region III UT inspector.
Based on the data presented in the November 18, 1983 letter, it is the staff's opinion that the cracks have not grown substantially since the last inspection because the data changes appear to be within the evaluation capability of the UT procedure.
Therefore, since the data agree with that furnished by tel econ on November 11, 1983, and indicate little, if any, crack growth, the. staff confirms its verbal restart approval and believes that there is reasonable assurance that the health and safety of the public will not be endangered by continued operation of Dresden Unit 2 without repair of the aforementioned
~racks at this time.
cc:
See next page Sincerely, ORIGINAL SIGNED BY Dennis M. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing code
Mr. Dennis L. Farrar cc Isham, Lincoln & Beale Counselors at Law One First National Plaza, 42nd Floor Chicago, Illinois 60603 Mr. Doug Scott Plant Superintendent Dresden Nuclear Power Station Rural Route #1 Morris, Illinois 60450 U. S. Nuclear Regulatory Commission Resident Inspectors Office Dresden Station Rural Route #1 Morris, Illinois 60450 Chairman Board of Supervisors of
- Grundy County Grundy County Courthouse Morris, Illinois 60450 U. S. Environmental Protection Agency Federal Activities Branch Region V Office ATTN:
Regional Radiation Representative 230 South Dearborn Street Chicago, Illinois 60604 James G. Keppler, Regional Administrator Nuclear Regulatory Commission, Region III 799 Roosevelt Street Glen Ellyn, Illinois 60137 Mr. Gary N. Wright, Manager Nuclear.Facility Safety Illinois Department of Nuclear Safety 1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704