ML17194B570
| ML17194B570 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 05/31/1983 |
| From: | Crutchfield D Office of Nuclear Reactor Regulation |
| To: | Farrar D COMMONWEALTH EDISON CO. |
| References | |
| TASK-03-04.B, TASK-3-4.B, TASK-RR LSO5-83-05-069, LSO5-83-5-69, NUDOCS 8306010308 | |
| Download: ML17194B570 (2) | |
Text
Docket No. 50-237 LS05-83-05-069 Mr. Dennis L. Farrar Director of Nuclear Licensing Corrmonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690
Dear Mr. Farrar:
May 31, 1983
SUBJECT:
INTEGRATED ASSESSMENT FOLLOWUP ITEM - TURBINE MISSILES
( IPSAR ITEM 4.6) - D.RESDEN NUCLEAR POWER STATION, UNIT 2 By letter dated October 8, 1982, you provided a resnonse to the open items identified in the Integrated Plant Safety Assessment Report (IPSAR) for
.Dresden Unit 2 (NUREG-0823).
Your response provided the schedule and basis for the turbine rotor inspection at Dresden Unit 2.
The staff has reviewed your response to detennine its interim acceptab'i*lity,
.pending review of a generic General Electric (GE) rep.ort describing their models and methods for relating missile generation probabili'ti1es to turbine maintenance procedures and schedules. General Electric intends to submit such a r.egort to the NRC for review by June 1983.
111-The staff finds that the Dresden Station maintenance procedures and schedules, ~described in the final Safety Evaluation Report for Topic III-4.B and Section 4.6 of the IPSAR, constitute adequate interim assurance of the low probability for turbine missile generation, until a generically-basgd maintenance and inspection program can be established for your facility.
Should the results of the generic GE models and methods indicate the need for a change to your existing maintenance and inspection program, such changes
- wi 11 be imp l~mented generically for a 11 facilities with GE turbines fo 11 owing completion of the staff's review.
Consequently_, the staff concludes that the action described in Section 4.6 of the IPSAR for Dresden Unit 2 1s complete.
cc: See next page Sin<;erely,
- Original Si1$ned by:
Dennis M. Crutchfield, Chief Operating Reactors Branch No.
Division*of Licensing OFFICE* *-~C,(a*=*6r E~~~me*s*. * ***w~ii~*~e,.,..... **R~~ e*r-c**** ~~~u *,.eTa ********************* ***
SURNAME~ **~r;tt83'....... *~18l1tr~....... *~*t'?)rt-8:1*""" ""ji~'i/af**** ***1'/.ff/iff"""" ************************
DATE......................................................................................................................... ************************
~RC FQRM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY
.. ~
0
\\.,__
- "-'--~~'~\\'Mr. Dennis
- L. Farrar
~
- Dir~ctor of Nuclear Licenstng Co1T111onwealth Edison Company Post Office Box 767 Chicago, Illinois 60690 cc Robert G. Fitzgibbons, Jr.
Isham, Lincoln & Beale Counselors at Law Three First National Plaza Suite 5200 Chicago, Illinois 60602 Mr. Doug Scott Plant Superintendent Dresden Nuclear Power Station Rural Route #1 Morris, Illinoi~ 60450 U. S. Nuclear Regulatory Commission Resident Inspectors *office Dresden Nuclear Power Station Rural Route #1 Morris, Illinois 60450 Chairman Board of Supervisors of Grundy County Grundy County Courthouse Morris, Illinois 60450.
Illinois Department of Nuclear Safety 1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 U.S. Environmental Protection Agency Federal Activities Branch Region V Office ATTN:
Regional Radiation Representative 230 South Dearborn Street Chicago, Illinois 60604 James G. Keppler, Regional Administrator Nuclear Regulatory Commission, Region Ill 799 Roosevelt Street Glen Ellyn, Illinois 60137
- Docket No. 50-237 Dresden 2