Advises That Draft Safety Evaluations for SEP Hydrology Topics II-3.A, Hydrology Description, II-3.B, Flooding Potential & Protective Requirements, II-3.B.1, Capability of Operating Plants to Cope... & II-3.C Are Final
ML17194B308
Person / Time
Site: Dresden Constellation icon.png
Issue date: 09/16/1982
From: Oconner P, Oconnor P
Office of Nuclear Reactor Regulation
To: Delgeorge L
COMMONWEALTH EDISON CO.
References
TASK-02-03.A, TASK-02-03.B, TASK-02-03.B1, TASK-02-03.C, TASK-2-3.A, TASK-2-3.B, TASK-2-3.B1, TASK-2-3.C, TASK-RR LSO5-82-09-053, LSO5-82-9-53, NUDOCS 8209230266
Download: ML17194B308 (2)


Text

Docket No. 50-23.7 LSOS-82-09-053 Mr. L DelGeorge Director of Nuclear Licensing Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690

Dear Mr *. OelGeorge:

. '*.)

September 16, 1982

/

SUBJECT:

SEP HYDROLOGY TOPICS 11-3,A, 11-3.B, II-3.B.1, AND 11-3.C DRESDEN NUCLEAR POWER STATION, UNIT NO. 2 This letter is to inform you that draft Sa~ty Evaluation Reports* for SEP Hydrology Topics; 11-3.A, Hydrology Description; II-3.B, Flooding

  • Potential and Protective Requirements; II-3.B.1, Capability of Operating Plants to Cope with Design Basis Flood Conditions; and 11-3.C, Safety Related Water Supply (Ultimate Heat Sink) forwarded by our letter dated June 21, 1982, are considered final Safety Evaluation Reports.

The basis for this position is t~at you have not responded to these draft. evaluations within the requested 30 days; therefore, we assume these evaluations are factually correct.

These evaluations will be a basic input to the integrated safety assess-ment for your facility. These assessments may be revised in the future ff your

  • fac11ftv design f s changed or if *NRC criteria re ht t ng to thf s subject are mociified: before the integrated assessment is completed.

cc: See next p~ge Sincerely, Paul O'Connor, Project Manager Operating Reactors Branch No. 5 Division of Licensing

.*-~-(- *\\J*

,y Mr. L. DelGeorge cc Robert G.* Fitzgibbons Jr.

Isham, Lincoln & Beale Counselors at Law Three First National.Plaza*

Suite 5200 Chicago, Illinois 60602 Mr. B. B. Stephenson Plant Superintendent Dresden Nuclear Power Station Rural Route #1 Morris, Illinois 60450

  • The Honorable Tom Corcoran

° United States House of Representatives Washington, D. C.

20515

  • U *. S. Nuclear Regulatory Commission Resident Inspectors Office Dresden Station RR #1 Morris, Illinois 60450 Mary Jo Murray Assistant Attorney General Environmental Control Division 188 W. Randolph Street Suite 2315 Chicago, Illinois 60601 Chainnan Board of Supervisors of

.,.Grundy County Grundy -'County Courthouse Morris, Illinois 60450 John F. Wolf, Esquire 3409 Shepherd Street Chevy Chase, Maryland 20015 Dr. Linda W. Little 500 Hennitage Drive Raleigh, North Carolina 27612 Judge Forrest J. Remick The Carriage House - Apartment 205 2201 L Street, N. W.

Washington, D. C.

20037

  • e

Regional Radiation Representative 230 South Dearborn Street Chicago, Illinois 60604 James G. Keppler, ~egional Administrator Nuclear Regulatory Commission, Region Ill 799 Roosevelt Street Glen Ellyn, Illinois 60137