Text
Hickman, John From:
Sent:
To:
Cc:
Subject:
Attachments:
- Bill, Gerard P. Van Noordennen <gpvannoordennen@energysolutions.com>
Friday, October 28,.2016 2:19 PM Lin, Bill; Lee, Peter; Hickman, John Jerry X. Houff
[External_Sender] FW: Requested Information from NRC ZS-LT-400-001-001, Rev. 3, Unconditional Release Materials, Equipment and Secondary Strudures.pdf; zs1LT-400-001-002, Rev. 2 - Contamination Verification Surveys Prior to Demolition.pdf.
Per your request. We are working on the DCGLs for the Aux Building drain lines and sump and Licensing will send them to you when it is finalized. As you know, the hydro lasing of the drain lines was completed successfully. The sumps have been pumped and decontaminated and the lines and sumps are presently being surveyed.
Gerry van Noordennen Vice President Regulatory Affairs EnergySolutions 151 Lafayette Drive, Suite 201 Oak Ridge, TN 37830 Office: 865-481-6319 Cell: 860-462-9707 ZionSolutions 101 Shiloh Boulevard Zion, IL 60099 Office: 224-789-4025 gpvannoordennen@energysolutions.com Bill Lin is requesting a procedure for Open air Demo. Specifically looking for guidance on Open Air Demo. He would also Like to see procedure for determination of what is donewith Demolition material from Zion Structures whether it goes to landfill or used in backfill. What defines that criteria. Thanks Jerry Houff ZionSolutions Licensing Manager jxhouff@enrgysolutions.com Work Phone {224)789-4090 Cell Phone {860)608-6408 1
ZS-L T-400-001-00 l Revision 3 lnfonnation Use*
D&D Procedure Cover Page CHARACTERIZATION/LICENSE TERMINATION PROCEDURE UNCO~DITIONAL RELEASE OF MATERIAL, EQUIPMENT AND SECONDARY STRUCTURES Procedure No. ZS-LT-400-001-001 Revision No. 3 Initiated By: (Print name I sign): R () n sh.:p~r( e) Q KYV'JJ9.XJ1p~ate: Yjl ~/JC) IS Regulatory Required Reviews (per AD-11, "Regulatory Reviews")
Part 72 ISFSI Impact License: 10 CFR 72.48 DYES
~NO Part 50 License: IO CFR 50.59 and 50.90 DYES
[j' NO Fire Protection: I 0 CFR 50.48(£)
DYES IN NO Conditions of License: E-Plan: 10 CFR 50.54(q)
DYES BJ. NO Toohn;oo1 Roviow Roqurrod'! O -rES IJll NO '.:fM Secondary Reviewer:
(!,~_,~__, *~
DATE: <f /JS/2015"
~.
Print Name I Signature Approval Section Effective Date: f- ]O.~ / 5 Page 1of47 I
Summary of Changes* in this Revision:
- *Rev. 3 -Rewrite.
Page 2 of 47 ZS-L T-400-001.:001 Revision 3 Information Use
ZS-L T-400-001-001 Revision 3 Information Use
- 1.. PURPOSE AND SCOPE....................................................................................................... 4
- 2.
RESPONSIBILITIES................................................... ~........................................................ 4
- 3.
DEFINITIONS.......................................... ~.................... :....................................................... 6
- 4.
PRECAUTIONS, LIMITATIONS, AND PREREQUISITES........................................... 8
- 5.
MAIN BODY.................................. ~............................-......................................................... 11 5.1.
General Requirements................................................................................................ 11 5.2.
Turnover of Areas/Structures to the Final Status Survey Group.............................. 11 5.3.
URS Area Access Control Measures.. ;..................................................................... 12 5.4.
Creating a Survey Package....................................................................................... 12 5.5.
Survey Plan Review and Approval................... ;..................................................... :.16 5.6.
Survey Plan Implementation......... ;............................. ;.. :........................................... 16
- 5. 7.
Completed Survey Plan Review and Closeout......................................................... 17
- 6.
REFERENCES...................................... *;.............................................................................. 18
- 7.
RECORDS..............................................-.............................................................................. 19
- 8.
ATTACHMENTS....... ;~........................................................................................................ 19 Page 3of47
- 1. PURPOSE AND SCOPE 1.1.
PURPOSE ZS-LT-400-001-001 Revision 3 Information Use This procedure provides guidance for performing Unconditional Release Surveys (URS) on secondary side structures, systems, and miscellaneous Materials and Equipment (M&E) within non-Radiologically Controlled Areas (RCAs) at the Zion Site prior to and/or after demolition activities, and documents that the secondary side structures, systems and miscellaneous M&E are suitable for subsequent unconditional release from the Zion Site, or for reuse on the Zion Site.
The conduct of this procedure is intended to prevent the inadvertent release of radioactive material offsite to the general public, through waste disposal, recycling, or asset recovery (i.e., sale or reuse of materials and equipment), by providing a controlled process for performance of biased radiological assessment surveys and implementation of material control on secondary s~de structures, systems, and miscellaneous M&E at the Zion Site.
1.2.
SCOPE This procedure describes the protocols to be used to design, perform, control, evaluate and document radiological surveys performed ori secondary side structures, systems and miscellaneous M&E to support unconditional release from the Zion Site, or for reuse on the Zion Site. These protocols are established using guidance from NUREG-1575, Supplement 1, Mulff-Agency Radiation Survey and Assessment of Materials and Equipment Manual (MARSAME).
- 2. RESPONSIBILITIES 2.1.
Vice-President D&D/Construction - is responsible for:
Directing D&D/Construction group to identify and prepare secondary side structures, systems, and miscellaneous M&E for radiological surveys.
Reviewing scope of demolition work packages for secondary side structures, systems, and miscellaneous M&E and initiating turnover to the Characterization/License
. Termination (C/LT) Group for performance of surveys.
2.2.
Characterization/License Termination (C/L T) Manager - is responsible for:
Establishing programs and procedures to ensure secondary side structures, systems, and miscellaneous M&E are surveyed, as necessary, to minimize the inadvertent release of radioactive material from the Zion Site, or refuse oli. the Zion Site.
Establishing and maintaining control of structures, systems, and miscellaneous M&E once surveyedto prevent inadvertent contamination.
2.3.
Director, Radiological Protection (DRP)- is responsible for:
Reviewing survey results and providing permission, through signature, that secondary side structures, systems, and miscellaneous M&E are suitable for demolition and/or
- unrestricted release from the Zion site, or for reuse qn the Zion Site.
Page 4of47
I 2.4.
MARSAME Manager - is responsible for:
ZS-LT-400-001-001 Revision 3 Information Use Implementing programs and procedures to ensure secondary side structures, systems, and miscellaneous M&E within non-radiologically controlled areas of the site are surveyed as necessary prior to leaving site, or reuse on the Zion Site.
Providing oversight to ensure that proper surveys are performed, survey results are evaluated correctly, and properly documented.
Maintaining control of structures, systems, and miscellaneous M&E once surveyed to prevent inadvertent contamination.
2.5.
Manager, Industrial Safety and Hygiene -is responsible for:
Providing assistance and input for Job Safety/Task Hazard Analysis Evaluations.
Providing guidance for safely accessing structure and M&E to be surveyed to ensure the safety of personnel. Examples include; blocking and bracing, elevated work activities, asbestos controls, and confined spaces.
2.6.
Cold and Dark Manager - is responsible for:
Initiating turnoyer of structures, systems; and miscellaneous M&E to the C/L T Group.
- 2.7.
Radiological Engineer (RE) I Field Supervisors (FS) - are responsible for:
Preparing and reviewing survey packages to facilitate the surveys of secondary side structures, systems, and miscellaneous M&E being considered for release.
Ensuring only approved instrumentation is used to perform release surveys and that the instrumentation is capable of meeting the required Minimum Detectable Concentrations (MDCs).
Providing direction to the C/Final Radiation Survey (FRS) Technicians performing surveys in accordance with this procedure.
Providing daily supervision and guidance to field survey and sampling crews and performing quality checks of field activities.
Evaluating and providing direction when surveys are required of secondary side structures, systems, and miscellaneous M&E with the potential for internal or inaccessible contamination, volumetric contamination, or that may contain other
.nuclides (e.g., Natural Occurring Radioactive Material, NORM) versus plant-derived or plant-related activity.
Reviewing, maintaining, and controlling survey packages and completed survey documentation appropriately.
Maintaining control of structures, systems, and miscellaneous M&E once surveyed to prevent inadvertent contamination.
Page 5of47
2.8.
Data Base and L TP Support Engineer is responsible for:
Maintaining MARSAME survey plan index and filing. locations.
ZS-L T-400-001-001 Revision 3 Information Use Tracking the status of the MARSAME Survey Plans and supporting documents.
2.9.
Project Leads and Job Supervisors - are responsible for:
Notifying the MARSAME Manager of plans to remove M&E from the site.
As necessary, assist in providing access to M&E to be surveyed including staging, disassembly, cutting access ports, and providing man lifts and scaffolding, etc.
2.10. Waste Operations Manager-is responsible for:.
Approving Container/Shipment Traveler Form, Attachment I of ZS-WM-135 for M&E free released from RCAs and RRAs prior to the material and/or equipment being shipped off:-site.
2.11.
C/Final Radiological Survey (FRS) Radiological Protection Technicians (RPT)- are responsible for:
Performing required radiological surveys in accordance with ZS-RP-I 05-001-001,
. "Radiological Surveys," and related survey plans, packages, or instructions, and documenting the results.
- Preparing the Container/Shipment Traveler Form, Attachment 1 of ZS-WM-135, "Onsite Radioactive and Non-Radioactive Container Tracking and Traveler."
- 3. DEFINITIONS 3.1.
Action Level-The numerical value that causes a decision-maker to choose one of the alternative actions. In the context of MARS AME, the numerical.value is the radionuclide concentration or level of radioactivity corresponding to the disposition criterion, and the
- alternative actions are determined by the selection of a disposition option.
3.2.
Aggregate Survey - A gamma dose rate survey performed on waste conveyance leaving an RCA or Radiologically Restricted Area (RRA) with material for Unconditional Release in accordance with the requirements of ZS-WM-135.
3.3.
Disposition Survey - A radiological survey designed to collect information to support a disposition decision.
3.4.
Historical Site Assessment - The identification of potential, likely, or known sources of radioactive materiaLand radioactive contamination based on existing or derived information for the purpose of classifying a facility or site, or parts thereof, as impacted or non-impacted.
3.5.
Impacted Area - Areas which could have been radiologically impacted by site operations. Impacted areas are classified by their potential for residual radioactivity in exce.ss of natural background or fallout levels.
Page 6 of 47
ZS-L T-400-001-001 Revision 3 Information Us~
3.6.
Materials and Equipment (M&E) - Items considered for disposition including metals, concrete, dispersible bulk materials, tools,.equipment, piping, *conduit, furniture, solids, liquids, and gases in containers, etc. M&E are considered non-real property distinguishable from buildings/structur~s and land, which are considered real property.
3.7.
Measurement-I) The act of using a detector to determine the level or quantity of radioactivity on a surface or in a sample of material removed from a media being evaluated, or 2) The quantity obtained by the act of measuring.
3.8.
Measurement Quality Objective (MQO) - A statement of performance objective or a requirement for a particular method performance characteristic.
3.9.
Minimum Detectable Concentration (MDC) - The minimum detectable concentration is the apriori activity level that a specific instrument and technique can be expected to detect 95% of the time. When stating the detection capability of an instrument, this value should be used. The MDC is the Detection Limit, Lo, multiplied by an appropriate conversion factor to give units of activity concentration.
3.10. Non-impacted Area -Areas not impacted by site operations and have no reasonable potential for residual radioactivity in excess of natural background or fallout levels.
3.11.
Preliminary Survey - Any survey performed prior to the disposition survey in MARSAME, and is generally performed to provide information required to support the design of the disposition-survey.
3.12.
Qualified Individual - A person meeting the radiation protection technician qualifications of Regulatory Guide 1.8, Rev.I, which endorses ANSI NI 8.1 and is trained to Zion instruction guide listed in ZS-TQ-100-FOlO SRPT 6.
3.13.
Sentinel Measurement - A biased measurement performed at a key location to provide information specific to the objectives of the initial assessm~nt.
- 3.14. Total Efficiency - Instrument efficiencies (Ei) are derived from the surface emission rate of the radioactive source(s) used during the instrument calibration. Total Efficiency (EJ is calculated by multiplying the instrument efficiency (Ei) by the surface efficiency (Es) commensurate with the radionuclide's alpha or beta energy using the guidance provided in ISO 7503-1.
3.15.
Unconditional or Unrestricted Release -The removal of radiological regulatory controls from structures, materials and equipment.
3.16.
Unconditional Release Survey (URS) Areas -Secondary side structures, systems and miscellaneous M&Ewithin non-radiologically controlled areas of the site that are controlled for the purposes of being surveyed or have been surveyed for unconditional release.
Page 7of47
ZS-L T-400-001-001 Revision 3 Information Use
- 4. PRECAUTIONS, LIMITATIONS, AND PREREQUISITES 4.1.
Precautions 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5 4.1.6 4.1.7
. 4.1.8 4.1.9 Only instrumentation specifically approved by the MARSAME Manager for surveying structures, systems, and M&E for unconditiJnal release shall be used when performing surveys in accordance with this procedure.
Only instrumentation capable of meeting the required MDCs shall be used to survey structures, systems, and miscellaneous M&E for unrestricted release.
Only qualified individuals may perform a URS of structures, systems, and miscellaneous M&E.
Structures, systems, and miscellaneous M&E designated for surveys and within the scope of this procedure shall be assessed for the possibility of internal contamination. This may involve disassembling or cutting access ports to gain access to internal surfaces/components. Prior to disassembling or cutting access ports, communications must be established with the appropriate Project Lead, Job Supervisor, and Zion Safety Department to ensure proper procedures are followed and the necessary support is available.
- Prior to any elevated work or confined space entries, discussions must be held with the appropriate Project Lead, Job Supervisor, and Zion Safety Department to ensure proper procedures are followed and the necessary support and permits are available.
Structures, systems, and miscellaneous M&E being surveyed that do not pass the release criteria may be (1) dismantled to isolate radioactive material and then resurveyed or (2) decontaminated and then resurveyed in an attempt to unconditionally release the structures, systems, and miscellaneous M&E. The scope of these actions will be determined by the survey planning team and added to the survey plan.
Survey data that exceeds the criteria or action levels used to determimtthat structures, systems, or M&E are suitable for release from radiological controls shall be reported to the RP-OPS Supervisor to ensure proper radiological controls, postings, and labels are implemented and maintained.
When surveying structures, systems, or M&E for unconditional release, the ambient background as measured by the instrumentation used must be known and/or controlled to ensure that the required MDCs are met. If necessary, consider relocating M&E to a lower background area or determine a local background by performing a shielded vs. unshielded background assessment.
Increase the count times, and/or using alternative instrumentation as approved by the MARSAME Manager.
All radiological markings (placards, labels, markings, rad tape, rad rope, etc.)
shall be removed or permanently defaced on all material and equipment to be released from radiological controls.
Page 8of47
ZS-L T-400-001-001 Revision 3 Information Use 4.1.10 Prior to shipments of bulk material (i.e. demolition debris) leaving site, an aggregate check of the shipment using a "micro-R" or "micro-Rem" survey instrument must be performed and an evaluation of the load using the truck monitor at the exit should be performed.
4.2.
Limitations 4.2.1 Structures, systems, and miscellaneous M&E shall not be released from radiological controls at Zion Station if they contain or are corytaminated with plant-related radioactive materials that are distinguishable from background.
4.2.2 In most cases, structures, systems, and miscellaneous M&E shall be deemed to contain, or be contaminated, with plant-related radioactivity if radiological surveys and/or sample analyses identified plant-related radioactivity in excess of the critical level. This critical level is associated *with the appropriate minimum detectable concentrations (MDCs), after correcting for applicable background interferences, as necessary. If alternative criteria are used to determine if structures, systems, and miscellaneous M&E contain, or are contaminated with plant-related radioactivity, the criteria used shall be clearly documented as part of the survey plan/package documentation, and approved prior to initiating any related surveys, by the MARSAME Manager, or designee.
4.2.3 The associated MDCs for scan measurements and smears shall be no greater than the corresponding limits in NRC I.E. Circular No. 81-07.
Scan alpha measurements 100 dpm/100 cm2 Scan beta measurements 5,000 dpm/100 cm2 Removable alpha contamination 20 dpm/100 cm2 Removable beta contamination 1000 dpm/100 cm2 NOTE The C/LT Manager must be notified, and grant approval, prior to obtaining samples for isotopic analysis not initially required in the sample plan.
4.2.4 For the analysis of volumetric activity in solids/sludge using gamma spectroscopy analyses, the analysis MDCs shall be no greater than the MDCs derived from ODCM Chapter 12, Table 12.5-:3 for sediments listed in the following table.
Radionuclide MDC (pCi/g)
Cs-137 0.18 Page 9of47
ZS-L T-400-001-001 Revision 3 Information Use 4.2.5 For the analysis of volumetric activity in liquids using gamma spectroscopy analyses, the analysis MDCs shall be no greater than the MDCs derived from ODCM Chapter 12, Table 12.5-3 for water listed in the following table.
Radionuclide MDC (pCi/ml)
Co-60 0.015
. Cs-137 0.018 4.2.6" When using gamma spectroscopy equipment in an attempt to quantify activity or demonstrate achievement of specified MDCs, approved ISOCS/LABSOCS geometries must be used to obtain quantitative results.
. 4.2. 7 Gamma spectroscopy equipment may only be used for qualitative analyses if counting geometries are not available.
4.3. Prerequisites 4.3.1 All survey or counting instruments used to obtain survey data shall be within current calibration requirements and verified to be operational.
4.3.2 Documents and databases containing survey data and survey records are Quality Assurance (QA) records when complete. Positive control of these records shall be maintained until they are forwarded to Records Management.
4.3.3 When documenting survey information, all personnel shall ensure that all QA records are of good quality and legible. Legibility is determined to be readable and reproducible.
4.3.4 Decommissioning activities having the potential to contaminate a specific area or structure must be completed prior to implementing the URS in that area.
4.3.5 Loose non-system specific miscellaneous M&E found in the survey unit shall be identified and listed.
4.3.6 The list of miscellaneous M&E found in the survey unit should be distributed to interested parties in order to finalize disposition. Disposition options include:
Relocated for continued use by D&D.
Designated for asset recovery. (Segregate/relocate M&E out of survey unit prior to survey).
Disposition by demolition contractor (M&E remains in area for survey).
4.3.7 Housekeeping and cleanup of the area must be completed prior to implementing the URS.
Page 10of47
- 5. MAINBODY 5.1.
General Requirements
~
ZS-LT-400-001-001 Revision 3 Information Use 5.1.1 All structures, systems and associated M&E outside of radiologically controlled areas that are designated for demolition and subsequent removal from the site as clean material shall be surveyed for unconditional release in accordance with this procedure.
5.1.2 The Cold and Dark Manager, or designated alternate, shall notify the C/L T Group prior to any structure demo_lition and associated systems and miscellaneous M&E. The cognizant engineer responsible for the demolition of an area/structure shall coordinate with the Vice-President D&D/Construction, or designated alternate, to schedule a survey of the structure, system and associated M&E.
5.1.3 The MARS AME Manager shall initiate and maintain access controls, as necessary, to prevent the cross contamination of previously surveyed areas and to ensure the final configuration of the areas is maintained. Access controls will remain in place until the time of demolition.
5.2.
Turnover of Areas/Structures to the Final Status Survey Group 5.2.1 The Cold and Dark Manager, or designated alternate, shall initiate Attachment 1, "Secondary Side Area/Structure Release for Demolition" as follows:
1.)
Complete the D&D/Construction Group Request for Survey Section of the form by identifying the area/structure to be demolished and associated M&E, the demolition date, the intended waste disposition, and inherent value of M&E, as appropriate.
2.)
Forward the form to the MARSAME Manager.
5.2.2 The Vice President D&D/Construction, or designated alternate will verify the area or structure is acceptable for the implementation of a pre-demolition release survey as follows:
1.)
Initiate Attachment 2 "Secondary Side Area/Structure Turnover and Control."
2.)
Ensure the completion _of housekeeping and the removal of any tools or equipment not required to support survey activities and verify any additional measures or engineering controls necessary to limit the spread of contamination from adjacent areas (i.e., plug vent louvers, cover floor gratings, etc.) have been implemented.
3.)
Sign the appropriate section of Attachment 2.
4.)
Forward the signed Attachment 2 to the MARSAME Manager.
5.2.3 The MARSAME Manager shall sign the appropriate section of Attachment 2 to signify acceptance of the area or structure and associated M&E as being suitable for performing a URS and file the signed forms in the survey package.
Page 11of47
ZS-L T-400-001-001 Revision 3 Information Use 5.3. URS Area Access Control Measures 5.3.1 The MARS AME Manager shall control entry to areas for which URS have been or are being performed and ensure proper controls are maintained as follows:
1.)
Place postings, such as Attachment 3 or 4, at the entrances to these areas, as.
appropriate.
A.
Use Attachment 3 for areas where access must be authorized.
B.
Use Attachment 4 for areas where access control of personnel is not required (e.g., occupied office spaces).
2.)
Use additional controls such as rope, barricades, tamper proof seals and locks as necessary.
3.)
Perform periodksurveys on structures up to the actual start of demolition for the purposes of:
A.
Monitoring for indications of cross contamination.
B.
Verifying postings and access control measures.
5.3.2 Review and approval by MARSAM~ Manager is required for any work activities to be performed following completion of URS in a specific area.
5.4.
Creating a Survey Package NOTE.
Electronically generated forms that contain equivalent content DO NOT have to have the identical formatting as stated in this procedure.
5.4.1 The MARSAME Manager, or designee shall assign a Radiological Engineer (RE) to develop a survey plan for the following scenarios as appropriate:
1.)
Structure Survey Areas A.
Floors B.
Walls below 2 meters C.
Walls above 2 meters D.
Ceiling E.
System external surface below 2 meters F.
System external surfaces above 2 meters G.
Miscellaneous M&E remaining in the survey area after turnover (Use Generic Plan GOO 1) 2.)
Systems Survey Plans A.
System and component internal surfaces 3.)
M&E Unconditional Release. Survey (URS) Plan Page 12of47
A.
Gene~ic M&E URS (GOOl)
B.
Specific M&E for URS.
ZS-L T-400-001~oo1 Revision 3 Infcmnation Use 5.4.2 The RE shaU develop a survey plan (Attachment 5) per the following:
1.)
Generate a MARSAME SurveyPlan number based on Survey Area Numbers or Survey Unit ID Numbers per ZS-LT-02, "Characterization Survey Plan" as appropriate.
A.
For structures, use the Survey Unit ID number followed by the appropriate alphanumeric sequence.
B.
For systems and system components (internal surfaces) that cross multiple survey units, use the Survey Area Number followed by the appropriate alphanumeric sequence.
- c.
For loose M&E, use survey plan GOOl.
D.
For specific miscellaneous M&E plans, number survey plans
- sequentiaUy beginning with 0002.
5.4.3 Document the MARSAME Plan number and complete Section 1 of Attachment 5, "Cover Page and Approvals.
5.4.4 Complete Section 2, Initial Assessment 1.)
Review historical information and process knowledge available for the area, system, or m~scellaneous M&E to assess its potential for containing contamination or being contaminated as follows:
A.
Perform a walk down of the area and take pictures that adequately show what surfaces n~ed to be surveyed, whenever possible..
B.
Identify the type and number of miscellaneous M&E items remaining in the survey area.
C.
Identify potential radionuclides of concern and their relative fractions if different from the assumptions in TSD 11-002.
D.
Determine the potential for volumetric contamination.
E.
Establish the history of prior use.
F.
Determine the need to perform sentinel and/or preliminary measurements. If these surveys have already been performed, then enter the record identifier and location.
5.4.5. Complete Section 3, Task Hazard Analysis.
1.)
Based on the walk down performed in Section 5.4.4.1.A, identify possible safety hazards.
2.)
Initiate a Task Hazard Analysis in conjunction with the ZionSolutions Safety Department.
Page 13 of 47
ZS-L T-400-001-001 Revision 3 Information Use 5.4.6 Complete Section 4, Physical Attributes.
5.4.7 5.4.8 1.)
Describe surface/material to be surveyed:.
- A.
Dimensions/area in m2 B.
Volumes in m3 C.
Mass in kilo grams 2.)
Determine the complexity including the need for segregation or 3.)
4.)
5.)
1.)
2.)
1.)
disassembly.
Evaluate the accessibility of the material and/or equipment including surface conditions that may affect the surface efficiency.
Ascertain any inherent value, if applicable. Refer to Section 5.2.1.1.
Note any other issues *that may compliCate subsequent surveys.
Complete Secti.on 5, Radiological Attributes.
See TSD 11-002, Section 4.1.3.2.2 table titled M&E Attributes.
Provide other information, if pertinent.
Complete Section 6, Disposition Survey Design.
Define the boundaries of the survey plan and total surface area of structures or system internals.
A.
- Identity whether the survey plan will be incomplete prior to initiation of demolition activities and require additional surveys be performed during demolition or after demolition is complete.
2.)
Identify the location, type, and number of miscellaneous M&E items to be surveyed, as appropriate.
3.)
Attach photos and or drawings used for package development, as appropriate.
4.)
Check the appropriate box indicating the classification of the structure, system, 9r miscellaneous M&E for survey.
5.)
Summarize the information that justifies the classification of the structure system or miscellaneous M&E and provide reference documents, as appropriate.
6.)
Identify the intended disposition of the M&E (refer to Attachment 1, Secondary Side Area/Structure Release for Demolition).
5.4.9 Complete Section 7, Survey Plan Development 1.)
Survey Requirements.
A.
Based on classification, previous and current use and/or engineering judgment, identify and document the percentage of structure, system, or miscellaneous M&E items to be surveyed per Attachment 6.
Page 14of47
ZS-L T-400-001-001 Revision 3 Information Use B.
Identify and document the number of measurements required for each Type of Measurement using Attachment 6.
C.
Document the Instrument/Probe Model Numbers to be used provided on.
D.
List Discrimination Limit (MDC) provided on Attachment 6.
E.
Enter the Action Level associated with the Type of Measurement provided on Attachment 7.
2.)
Quality Control (QC) consists of a repeat of five percent (5%) or a minimum of one (1) of both scan and direct measurements; and sinear samples as required in the survey plan. Address QC requirements as follows:
A.
Identify the Type of Measurement.
B.
Identify and document the amount of QC measurements.
C.
If QC measurements are to be performed on specific items or locations, then list the items or locations.
D.
Perform QC measurements by a C/FRS RPT other than the individual who originally performed the survey and use a different survey instrument other than the instrument used in the original survey.
3.)
Survey Plan Instructions.
A.
Develop survey plan instructions to implement the survey requirements as identified in section 5.4.9.1 to include:
B.
- c.
D.
I."
- 11.
iii.
IV *
- i.
- 11.
111.
Determination of background.
I Determination of scan and static alarm set points.
Number and location of survey measurements.
Number and.location of QC measurements.
. Assign survey identifiers for scan and static measurement locations in accordance with Attachment 8.
- Assign survey identifiers for media sample locations in accordance with.
Initiate Attachment 12 as follows:
Identify Survey Area and Plan# or NIA for loose M&E URS.
Identify area/material classification and intended% of survey.
List total number of items and number of items to be surveyed by type i.e. tables, chairs, lockers, etc.
iv.
Indicate items for QA/QC assessment.
Page 15of47
5.5. Survey Plan Review and Approval ZS-L T-400-001-001 Revision 3 Information Use 5.5.1 Submit the draft survey plan, including photos drawings and survey map, as appropriate, to the MARSAME Manager for review and approval.
5.5.2 The MARSAME Manager will forward the approved plan to the C/LT Manager.
for review and approval.
5.5.3 If additional surveys are required during or after demolition, then the C/LT
- Manager shall complete page.2 of Attachment 1 to communicate the conditions to the VP ofD&D.
5.5.4 When the survey plan is approved by the C/LT Manager, forward the approved survey plan to Data Base and L TP Support Engineer for entry into the MARSAME Index.
5.5.5 File the survey plan in the designated storage location.
5.6. Survey Plan Implementation 5.6.1 Initiate implementation the survey plan as follows.
1.)
. Review the approved survey plan and resolve any questions with the RE and/or MARSAME Manager. (FS) 2.)
Conduct a pre-job brief with the C/FRS RPTs and support labor and assign survey duties, as appropriate. (FS) 3.)
Sign and date the survey plan prior to initiating survey activities. (C/FRS RPTs) 5.6.2 Provide direction to personnel regarding layout and identification of structure/system survey locations or identification of M&E items for survey, as appropriate. (FS and/or RE) 5.6.3 C/FSS RPTs perform the following:
A.
Obtain survey instru.ments and smears, as appropriate, and proceed to the survey location.
B.
Identify the ambient background count rate in the area for each survey instrument and collect and record five (5), one (!)minute background measurements.
C.
Calculate and record the mean of the 5 background measurements in 0, Field Log.
D.
Calculate Scan and Direct Measurement MDCs using equations found in 1 Measurement Quality Objectives in Survey Plans and document in Attachment 10.
E.
Perfoml. survey activities per the survey instructions.
Page 16of47
NOTE ZS-L T-400-001-001 Revision 3 Information Use Beta Direct measurements are performed at the highest scan indication identified per scan area. Collect a smear sample at the same location. Use the same location identifier for the beta scan, beta direct and smear.
- F.
If the survey instructions cannot be implementt<d as written, then document in Section 10 of Attachment 5 and contact the FS and/or the MARSAME Manager for guidance.
G.
Document performance of the survey activities on Attachment 10, survey maps, instrument data logging/downloads, smear analysis reports and/or M&E URS form (Attachment 12), as appropriate.
H.
If the survey results exceed the action levels, then notify the FS and/or the MARSAME Manager for guidance.
I.
Request a peer review prior to submitting the completed survey package to the FS.
5.6.4 The MARSAME Manager may provide written supplementary survey instructions as appropriate to address survey indications in excess of an action level. If supplementary survey instructions and survey results are provided, then document in Attachment 5, Section 9.
5.7. Completed Survey Plan Review and Closeout 5.7.1 Review survey data collected and documentation for completeness and forward the completed survey package Attachment 5, to the.MARSAME Manager. (FS) 5.7.2 The MARSAME Manager shallcomplete Section 10 of Attachment 5 and review the measurement and/or sample analysis results at the completion of the survey to ensure the following:
1.)
The required numbers of measurements and/or samples were collected.
2.)
The required measurement and/or sample MDCs were met.
3.)
The measurement and/or sample analysis results:
- i.
Satisfy the MQOs and Type I, Type II Decision Error of 5%.
ii.
Meet the criteria or action level used in determining M&E is suitable for release from radiological.
5.7.3 Complete the survey package cover page documenting the suitability for release. (MARSAME Manager) 5.7.4 Notify the DRP and obtain DRP signature for close out of package.
Page 17of47
NOTE ZS-L T-400-001-001 Revision 3
.Information Use Materials and/or equipment addressed by this procedure may be released from RP controls when any one of the following apply:
- 2 of this procedure is approved.
Partial release of M&E covered by a survey plan is approved via ZS-WM-135 Attachment 1.
The survey package control sheet Review and Closeout is approved on page 1 of attachment 5.
5.7.5 If the reviews in Step 5.7.2 indicat*e the materials and/or equipment are not suitable for release, then the MARSAME Manager, or designee, shall complete the survey package cover page documenting the non-suitability for release and inform operational RP organization to initiate necessary controls.
5.7.6 The MARSAME Manager shall provide any Lessons Learned, as appropriate.
5.7.7 Notify the Data Base and LTP Support Engineer that the package is complete and file the approved survey package and all associated measurement and/or sample analysis results in the designated storage location.
- 6. REFERENCES 6.1.
NUREG-1575, Supplement 1, Multi-Agency Radiation Survey and Assessment ofM&E Manual (MARSAME) January 2009.
6.2.
NRC HPPOS-071, Control of Radioactively Contaminated Material.
6.3.
NRC HPPOS-072, Guide on "How Hard You Have to Look" as Part of Radioactive.
Contamination Control Program.
6.4.
NRC HPPOS-073, Surveys of Wastes from Nuclear Reactor Facilities before Disposal.
6.5.
NRC Information Notice No. 85-92, Surveys of Wastes before Disposal from Nuclear
- Reactor Facilities, December 1985.
. 6.6.
NRC LE Circular No. 81-07, Control of Radioactively Contaminated Materials, May 1981.
6.7.
TSO 11-002, Radiation Clearance Plan for Radiological Sur\\rey and Release of Materials and Equipment (M&E) Using Guidance from MARSAME at ZionSolutions, April 2012.
6.8.
ZS-WM-135, Onsite Radioactive and Non-Radioactive Container Tracking and Traveler 6.9.
ISO 7503-1, "Evaluation of surface contamination - Part 1: Beta-emitters (maximum beta energy greater than 0.15 Me V) and alpha-emitters", 1988.
6.10.
ZS-LT-02, Characterization Survey Plan 6.11.
ZS-RP-105-001-001, Radiological Survey Page 18of47
- 7. RECORDS ZS-L T-400-00l~OO1 Revision 3 Information Use 7.1. - Secondary Side Area/Structure Release for Demolition 7.2.
- Att~chment 2-Secondary Side Area/Structure Turnover and Control 7.3.
- Attachment 5 - Survey Plan *
\\
7.4. 0 - Field Log 7.5. 2 - Miscellaneous M&E Survey Sheet
- 8. ATTACHMENTS 8.1. -Secondary Side Area/Structure Release for Demolition 8.2. - Secondary Si.de Area/Structure Turnover and Control 8.3.
AttachmentJ - Example Posting for Unconditional Release Survey 8.4. - Example Posting for Unconditional Release Survey 8.5. - Survey Plan 8.6. - Recommended Level of Survey for URS Plans*
8.7. - Guidelines for Measurements in URS Plans
- 8.8. - MARSAME Location Codes for Datalogger 8.9. - MARSAME Location Codes for Samples 8.10. 0 - Field Log 8.11. 1 - Measurement Quality Objectives for Survey Plans 8.12. 2 - Miscellaneous M&E Survey Sheet
- .Page 19 of 47 ZS-L T-400".'001-001 Secondary Side Area/Structure Release for Demolition Revision 3 Page 1 of2 Information Use D&D/Construction Group Request for Survey Demolition Work Package #:.
Scheduled Demolition Date:
Area/Structure to be Demolished*
Waste Disposition:
Waste Disposition:
Cold and Dark Manager Date Site Characterization/License Termin~tion Group Actions Indicate. the appropriate response belOw Area/Structure survey completed on:
(signature)
(date)
Data reviewed by Radiological Engineer/Field Supervisor:
(signature)
(date)
Data reviewed by MARSAME (signature)
(date)
Manager:
Page 20of47 ZS-L T-400-001-001 Secondary Side Area/Structure Release for Demolition Revision 3 Page 2 of2 Information Use Site Characterization/License Termination Group Response D The area(s)/structure(s) listed above do not meet the criteria to be released for demolition.
because:
D The area(s)/structure(s) listed above are released for demolition with the following
. restrictions:
D RP job coverage required D R WP required D Further surveys required during intermediate steps of demolition (attach requirements to this form)
D *No radioactive materials are to be stored in this area.
D Special.waste disposal or segregation methods required (attach requirements to this form)
D Aggregate material generated during the demolition SHALL BE monitored (micro-R, truck monitor, etc.) prior to removal from the Zion Site.
D Other:
D The area(s)/structure(s) listed above are released for demolition with no restrictions.
Site Characterization/License.Termination Manager Signature/Date Director Radiation Protection Signature/Date Page 21of47
ZS-L T-400-001-001 Revision 3 Secondary Side Area/Strueture Turnover and Control Information Use Area/Structure:
Turnover to Site Characterization/License Termination Group Decommissioning or pre-demolition activities have been completed in this area. Engineering controls, as necessary, to prevent contamination by adjacent decommissioning activities, have been put in place. All tools, equipment, waste, and materials not requii-ed for survey performance have been removed. The area is released to the Site Characterization/License Termination Group section for unconditional release surveys.
VICE-PRESIDENT D&D/CONSTRUCTION Date Site Characterization/License TerminationGroup.Acceptance of Area The Final Status Survey group accepts this area as being suitable for performing the unconditional release survey.
MARSAME Manager Date
, Access Controls The area meets the criteria for turnover to the Final Status Survey group. Access controls have been instituted to adequately protect the area.
Radiological Engineer/Field Supervisor Date Comments Page 22of47
ZS"'.L T-400-001-001 Revision 3 Example Postine for Unconditional Release Survey Information Use NOTICE AN UNCONDITONAL RELEASE SURVEY IS IN PROGRESS OR HAS BEEN COMPLETED IN THIS AREA NO DECOMMISSIONING/DEMOLITION ACTIVITES ARE TO BE PERFORMED IN THIS AREA THE USE, MOVEMENT OR STORAGE OF RADIOACTIVE MATERIAL IS PROHIBITED IN THIS AREA ENTRY OF PERSONNEL IN THIS AREA IS PROHIBITED WITHOUT THE AUTHORIZATION OF Site Characterization/License Termination SUPERVISION CONTACT:
EXTENSION:
Page 23 of 47
ZS-L T-400-001-001 Revision 3 Example Posthie for Unconditional Release Survey Information Use NOTICE AN UNCONDITONAL RELEASE SURVEY IS IN PROGRESS OR HAS BEEN COMPLETED IN THIS AREA NO DECOMMISSIONING/DEMOLITION ACTIVITES ARE TO BE PERFORMED IN THIS AREA THE USE, MOVEMENT OR STORAGE OF RADIOACTIVE MATERIAL IS PROHIBITED IN THIS AREA Page 24of47
MARSAME Plan#
ZS-L T-400-001-001 Survey Plan Revision 3 Page 1 of 10 Information Use s* r 1 c ec ion : over p a ean dA 1
,pprova s Description of Survey Plan:
(Structure)
Description of Survey Plan:
(M&E)
Categorization: D Impacted D Non-Impacted
- (see section 6 for justification)
Survey Package Preparation Prepared by:
Reviewed by:
Approved by:
Disposition Surveys Date:
Package Writer Date:
MARSAME Manager Date:
SC/LT Manager Individuals performing survey have read and understood this plan.
Performed by:
. Performed by:
Performed by:
Reviewed by:
Date:
Field Supervisor Review and Closeout D
I Surveys for unconditional release demonstrate that there is no plant added radioactivity distinguishable from background.
- D DOES NOT meet requirements for unconditional release. Area/Item has been removed, segregated, and controlled.
Approved by:
Date:
MARSAME Manager Approved by:
Date:
RPM Page 25of47
0 MARSAME Pla.n #
Survey Plan Page 2of10 Section 2 - Initial Assessment IA):
Historical Info HSA Classification Process Knowledge Visual Inspection Record Number I Identifier Record Location Preliminar Surve s:
Record Number I Identifier Record Location D Non-impacted D Clas*s 1.
D Class 2 D Class 3 D Yes Page 26 of 47 No ZS-L T-400-001-001 Revision 3 Information Use
MARSAME Plan#
- Survey Plan Page 3of10 Section 3 - Task Hazard Analysis:
Observed or Potential Hazards D - Heat Stress or stroke D - Confined space D - Cold work environment D - Hazardous atmosphere D - Stingirig Insects D - Load bearing stresses D - Hazardous Plants/ Animals D - Lack of structural D - Tripping Hazards integrity D - Standing Water > 1 ft. deep D - Release of stored energy D - Work @ height > 6 ft.
(hydraulic, steam, etc.,)
D - Open excavations D - Buried utilities D -Fall hazards D -Overhead power lines D -Other D :.. Other D Performed Walk-Down:
D Not-Performed Notes/drawings from Walk-down Page 27 of 47 D
D D
D D
D D
D ZS-L T-400-001-001 Revision 3 Information Use
-Kinetic energy sources (moving equipment)
- Vehicle traffic
- Overhead piping or components
- Exposed electric
- Sharp objects/surfaces
- Falling objects
- Other
- Other (Name)
(Date)
MARSAME Plan#
Survey Plan Page 4of10 Section 4 - Physical Attributes:
Example Information Size (total mass) fll =*
Shape (total surface area)
=
fll Are there issues with size or shape
=
Q,) e 0Yes 0No that affect how the M&E should be
~*
handled?
0Yes 0No Is additional segregation required?
0Yes 0No Is disassembly required?
,e, 0Yes 0No Are engineering controls needed to lo<
prevent release of materials? 1 Q,) -c.
Are there multiple component e
0Yes 0No
=
materials in the M&E?
u 0Yes 0No Are material specific background measurements required?
0Yes 0No Are there issues with size or shape that limit accessibility?
D Yes 0No Are there porous surfaces?
Are there seams, ruptures, or a
0Yes 0No corroded areas where radioactivity could penetrate to difficult-to-
,.Q measure areas?
fll fll Are there painted surfaces that could Q,)
0Yes 0No u u hav~ activity below the paint?
Other surface.conditions that could 0Yes 0No affect the measurements (smooth, pitted, corroded and or pitted, porous wood, etc.)?
D Yes 0No Can the M&E be reused or recycled?
=..
Q,)
Q,)
- ... =
Q,)-
What are recycling and disposal
-= ~ 0Yes 0No
=>
costs?
)ooool Page 28of47 ZS-L T-400-001-001 Revision 3 Information Use M&E Information
,-,1,-----------------,
MARSAME Plan#
ZS-L T-400-001-001 Survey Plan Revision 3
- Page 5of10 Information Use Section 5 - Radiolo2ical Attributes:
See TSD 11-002, Section 4.1.3.2.2 Other Section 6 - Disposition Survey Design Survey Unit Boundaries Final Se2re2ation Location:
Final Classification:
D Non-impacted D Class 1 D Class 2 D Class 3 M&E Classification Justification:
Disposition Option Alternative ACtions Unrestricted release for D
disposal D
D (M&E free release and disposal as municipal D
waste)
Release for Recycle D
D (Recycle without D
radiological controls)
D Release for Reuse (Reuse D
D without radiological D
controls)
Page 29of47
MARSAME Plan #
ZS-LT-400-001-001 Survey Plan Revision 3 Page 6of10 Information Use Section 7 - Survey Plan Development S
R urvey eqmrements
% Scan Coverage I #
Number and Instrument I Probe
. Discrimination Limit Maximum*
Action Type of survey locations.
Measurement Model Number (MDC)
BKGD Level Page 30 of47
MARSAME Plan #
Survey Plan Page 7of10 Quality Control Type of Number or percent of Specific Items or Measurement QC measurements Locations (If Required)
Beta scan*
Beta direct*
Beta disc smear*
- QC measurements should be independent from the original technician that performed the survey and use a different instrument.
Page 31of47 ZS-L T-400-001-00 I Revision 3 Information Use
MARSAME Plan #
ZS-L T-400-001-001 Survey Plan.
Revision 3 Page 8of10 Information Use Measurement Quality Objectives (MQOs) Implemented Type of Measurement Instrument/probe Type I Type II Count Time [min] I
Background
MDC model # & serial #.
(alpha)
(beta)
Scan Rate !in/sec)
Beta scan I
- 5%
- 5°/o Alpha scan I
- 5%
- 5%
Beta direct I
- 5%
- 5%
(expected 1 min)
Alpha direct I
- 5%
- 5%
(expected 1 min)
Beta disc smear (expected 1 min)
Alpha disc smear (expected I min)
- Unless otherwise noted Page 32 of 47
MARSAME Plan#
ZS-L T-400-001-001 Survey Plan Revision 3 Page 9of10 Information Use Survey Plan Instructions:
Background Determination, Scan and Static Alarm Set Points Item/Location Survey Instruction QC Instructions Page 33of47
MARSAME Plan#
ZS-L T-400-001-001 Survey Plan Revision 3 Page lOoflO Information Use Section 8. - Survey Results 0
Survey Results Attached Section 9 - Comments (See Survey Results)
Section 10 - Data Assessment:
Data review performed and documented on survey results.................................... 0 Yes 0 No Review and approve Attachment 12.................................................... ;.................. 0 Yes 0 No Approve partial release of M&E via ZS-WM-135 Attachment 1......... ~................. 0 Yes 0 No Analysis of difference between planned % and actual.......................................... 0 Yes 0 No Determination of locations with potential plant-derived activity distinguishable from background............................................................................ O Yes 0 No Results of direct surveys to confirm presence of fixed contamillation................... 0 Yes 0 No Elevated Radioactivity Identified?.......................................................................... 0 Yes 0 No Remediation Performed?.......................*.................,.............................................. 0 Yes 0 No Deviation from Survey Plan?.................................................................................. 0 Yes 0 No Special Comments Required?................................................................................. 0 Yes 0 No Lessons learned: what went right, what needs to be changed.
Page 34 of 47 ZS-LT-400-001-001 General Guidance for Survey Design and Recommended Level of Survey for URS Plans Revision 3 Infonnation Use Surface Minimum Scan Coverage<*>
Beta Direct Measurements and Smear Surveys Beta/Gamma and Alpha <2>
Structure Class 3 Class 2 Class 1 Class 3 Class 2 Class 1 Floor 10%
25%
100%
Beta Direct measurements Beta Direct measurements Beta Direct measurements are Walls below2 10%
25%
100%
are performed at the highest are performed at the highest performed at the highest scan meters scan indication identified per scan indication identified per indication identified per scan Walls above 2
<5%
10%
50%
scan area. Collect a smear scan area. Collect a smear area. Collect a smear samples meters samples at the same location.
samples at the same location.
at the same location. Smear Ceilings
<5%
10%
50%
Smear samples are collected Smear samples are collected samples are coilected a.
Exterior walls 5%
10%
50%
a frequency of l smear per a frequency of 1 smear per frequency of 1 smear per lm2 below 2 meters lm2 up to 50 m2 of area l m2 up to 25 m2 of area
. up to 4 m2 of area surveyed as Exterior walls
<5%
5%
10%
surveyed as appropriate surveyed as appropriate appropriate (collect a minimum above 2 meters (collect a minimum of30 (collect a minimum of 30 of 30 smears where practical)
Roof 10%
25%
100%
smears where practical) smears where practical)
Systems and Class 3 Class 2 Class l Class 3 Class 2 Class 1 Components Exteriors 10%
25%
100%
Beta Direct measurements Beta Direct measurements Beta Direct measurements are (include as are performed at the highest are performed at the highest performed at the highest scan structural scan* indication identified per scan indication identified per indication identified per scan elements within scan area. Collect a smear scan area. Collect a smear area. Collect a smear sample at the 3D space ofa sample at a frequency of 1 sample at a frequency of 1 a frequency of 1 smear* per lm2 survev unit)
~
smear per lm2 up to 50 m2 of smear per 1 m2 up to 25m2 of up to 4 m2 of area surveyed as Interiors 10%
25%
100%
area surveyed as appropriate area surveyed as appropriate appropriate (collect a minimum Miscellaneous 10%
25%
100%
(collect a minimum of30 (collect a minimum of30 of 30 smears where practical)
M&E smears where practical) smears where practical)
( 1 )- The intensity of the Unconditional Release Survey for structure, system or miscellaneous M&E will vary dependent on the following:
History of radioactivity present (See Historical Site Assessment Classification)
Previous or current use Process knowledge Results of preliminary or sentinel surveys 1
Engineering Judgment (2)-Scan *coverage recommendations for 13/y contamination. Scans for a contamination will be performed ifthe area has a history of a contamination or if a contamination is suspected.
Page 35 of 47
ZS-LT-400-001-001 Revision 3 Guidelines for Measurements in URS Plans Infonnation Use Instrument Probe Survey Model Discrimination Action Method Number Limit(MDC)
Bkgd Survey Guidance Level
Background
Maintain a Y. " distance detector to surface of interest MDC determined as the Scan speed should be l detector width per second. Slow Ludlum 2350
< 5,000 dpm I 100 cm2
.mean of5 down scan speed over uneven surfaces Beta scan with 43-68 Scan indication alarm set representative Listen for increases in audio response of the meter and I
- point based on mean measurements slowdown in order to identify the location of the highest background within the area or indication. Mark the location of and record the highest scan material specific.
indication identified.
Background
Maintain a Y. "distance detector to surface of interest MDC determined as the Scan speed should be l detector width per second. Slow Ludlum 2350
< 5,000 dpm I 100 cm2 mean of5 down scan speed over uneven surfaces Beta scan with 43-37 Scan indication alarm set representative Listen for increases in 11udio response of the meter and I
point based on mean measurements slowdown in order to identify the location of the highest background wit.hin the area or indication. Mark the location of and record the highest scan material specific.
indication identified.
Background
Maintain a Y. "distance detector to surface of interest MDC determined as the Scan speed should be 1 detector ~idth per second: Slow Ludlum 2360
< 5,000 dpm I 100 cm2
- mean of 5 down scan speed over uneven surfaces Beta scan Scan indication alarm set representative Listen for increases in audio response of the meter and 1
with 43-93 point based on mean nieasurements slowdown in order to identify ihe location of the highest background within the area or indication. Mark the location of and record the highest scan material specific.
indication identified per defined grid
Background
determined as the Collect al minute direct beta static measurement at the Beta Ludlum 2350 mean of5 marked location of the highest scan indication or prescribed Direct with 43-68
< 5,000 dpm I 100 cm2 representative location by placing the detector at Y. "of the surface of
- 1 Static measurements interest and record the result.
within the area or material specific Page 36 of 47
ZS-L T-400-001-00 I
. Revision 3 Guidelines for Measurements in URS Plans
\\
Infonnation Use
Background
determined as the Collect a I minute direct.beta static measurement at the Beta mean of5 Direct Ludlum 2360
< 5,000 dpm I I 00 cm2 representative marked location of the highest scan indication or prescribed I
with 43-93 location by placing the detector at Y. "of the surface of Static measurements interest and record the result.
within the area or material specific Ludlum Model Maintain a Y. "distance detector to surface of interest Beta scan
-3 with GM Indications >bkgd As read not to Scan speed should be I detector width per second. Slow 3
probe exceed 300 cpm down scan speed over uneven surfaces Determined by I per beta direct static measurement location additional Smear Tennelec instrument/background Sample 3030P
< Ld in dpm I 100 cm2 smear samples may be collected independent of direct static 2
locatio.ns as appropriate Smear Tennelec Determined by Concurrent with beta Sample 3030P instrument/background <
2 Ld in dom I 100 cm2
- HPGe, ISOCS,
- LaBr, or LabSOCS or No ROC identified 0.1 mR/hr In-situ per location or item or laboratory analysis of sample 4
NaI Inspector Plastic Ludlum Model
<4600 dpm alann set Per item Scintillat 54 point per instrument Self-Regulating Scan and smear survey prerequisite 5
or cal.
Action Level.
I.
Indication> alann.set point
- 2.
Smear analysis result> Ld = 3+(4.65 vbkrd)
- 3.
Indication> BKDG
- 4.
ROC identified as present
- 5.
Response> alann set point Supplementary Survey Techniques implemented to resolve positive indications identified by scan and/or direct measurement or smear survey techniques include:
In-situ gamma spectroscopy via !SOCS or Inspector.
Bulk media sampling and laboratory analysis Page 37 of 47
. LINE l LINE2 6
LINE3 11 Indicates SUID l-5'h Ll 2
7 12 1-4 digits indicate the Survey Unit Identification Number.
This will be the last 4 digits of the Survey Unit ID 5"' digit will identify package alphanumeric sequence.
Example: 9501A, 9501B, 9501C etc...
MARSAME Location Codes for Datalo!!!!er 3
4 5
9 8
9 10 p
B 6'h Digit Identifies type of survey.
B = Background S =Sentinel I = Investigational V =Verification R= Release
- FLDBK =Field
Background
( Digits 6-10 for field
- backgrounds)
L2 Q=QNQC P = Preliminary 5
G D
7
-10 Identifies the item surveyed followed by the number L2 Example:
Grid: GOO!, G002,"G003 etc...
Structure: SOO l, 8002, 8003 Type Misc. M&E Id# 7+8 Individual Item Id # 9+ I 0 (Example: type Ml item 01, =
MIO!, M102, M03, etc... M201, M02, M03 etc... )
ZS-LT-400-001-001 Revision 3 Information Use 11th & l 21h Type of measurement surveyed L3 AD= Alpha IS= Investigational Scan Direct JD= Juncture Direct BD = Beta Direct JS = Junction Scan BS = Beta Scan M = Metal GD = Gamma PD*= Penetration Direct Direct P= Penetration GS=Gamma Scan
!DC" Investigational Direct
- NOTE: When collecting Field backgrounds, in Line 2, the location code will be FLDBK.
Page 38 of 47
9 5
0 I
2 3
MARSAME Survey Plan ID 5 digits This will be the last 4 digits of the Survey Unit ID 5th digit will identify package alphanumeric sequence.
Example:
9501A, 9501B, 9501C etc...
MARSAME Locatfon Codes for Samples I
A I p
s I
c I v
0 4
5 6
7 8
9 10 11 12 7t* & st*
6th Identifies what type Identifies the item surveyed 9th & 10th Type of sample collected of. survey it is.
followed by the number P = Preliminary Gr= Grid CV= Volumetric SM = Smear Sample S =Sentinel St= Structure Concrete Sample OL =Oil Sample I = lnvestigational Eq =Equipment LQ=Other PT=Paint V = Verification Ot=Other Liquids besides R= Release water J =Judgmental MS=Metal Sample VS= Volumetric Sample Volumetric Samples
~ Or=
lOOgm MT=Metal Samnle Page 39 of 47 ZS-L T-400-001-00 I Revision 3 Information Use 11th & 12th identifies the sample number.
Sequentially numbering Example: 01, 02, 03, 04, etc......*.
\\
0 ZS-L T-400-001-001 Field Log Revision 3 Page of Information Use Sample Plan No.: ------
Survey Area No.:
~-
==
Description:==
Survey Unit No.: _____ _
==
Description:==
- Field Log:
Date: ----
Observation or Comment:
Technician I.
Page 40 of 47.
1 Measurement Quality Objectives for Survey Plans Measurement Quality Objectives (MQOs)
ZS-L T-400-001-00.1 Revision 3 Information Use The following MQOs are established in order to ensure that the survey instrumentation used and survey and sampling methods performed will adequately and accurately characterize material surveyed for Unconditional Release based on a release limit of "no detectable".
The survey and sample analysis instrumentation selected for performing unconditional release ofmaterial, equipment and secondary structures from the ZSRP are consistent with the guidance found in NUREG-1575. The range, ruggedness, sensitivity, detection capability and quantification capability were confirmed through instrumentation calibration.
Implementation of instrument special training, operating procedures and survey plan instructions ensure that measurement method uncertainty remains consistent.
Selected Instrumentation Ludlum Model 2350 Data Logger coupled with detectors; 43-68 and 43-37 proportional detectors, 44-10 Nal.
Ludlum Model 2360 with 43-93 scintillator detectors.
Ludlum Model 3 with a 44-09 GM detector Ludlum Model 54 article monitor Ludlum 303.0P Alpha-Beta smear counter Tennelec S5 XLB proportional smear counter Canberra Lab SOCS/ISOCS Genie-2000 Gamma Spectroscopy System Canberra Inspector 1000 for qualification of indications of concern Background Determination Typically field background is determined as the mean of 5 background measurements
- collected as ambient area or as material specific background.
The equations below are listed in NUREG 1575, Rev. 1 page 6-34 as (6-6).
I The background mean and its associated standard deviation for the area where surveys will take place. Calculation of Le and Ld can be performed after arithmetic mean of background is obtained.
Le = 2.33.Jbkrd Ld = 3+( 4.65.Jbkrd)
Material specific background as above for material that has NORM.
The required MDCs associated with the measurements and sample analyses.
Page 41of47
ZS-L T-400-001-00 I 1 Revision 3 Measurement Quality Objectives for Survey Plans Information Use
.NOTE Scan and Fixed Minimum Detectable Concentrations will be calculated using a d' of 1.3 8; however, the radiological engineer may use a lower false positive value and a higher d' during develop~ent of the survey package. See Table 2 fo~ calculated false positive proportion values calculated using various d' values..
T bl 1 F l P "f P
a e ' a se os11ve f
V l ropor 100 a ues False Positive d'
Proportion 0.05 3.28 0.10 2.92 0.15 2.68 0.20 2.48 0.25 2.32 0.30 2.16 0.35.
2.02 0.40 1.9 0.45 1.77 0.50 1.64 0.55 1.51 0.60 1.38
- Reference NUREG-1575, MARSSIM, Rev. 1, page 6-40.
The type I and type II error rates for each type Of measurement will be 5% unless other\\Vise noted.
Page 42 of 47
ZS-L T-400-001-001 1 Revision3 Measurement Quality Objectives for Survey Plans Information Use Beta Scan Measurement MDC:
The formula used to determine the scanning MDC at the 95% confidence level is:
Where, MDCscan =
d' p
A d'(~ *¥-)
MDCscan =
r:::;
A C6th1PC100)
Minimum Detectable Concentration in dpm/l 00 cm2 index of sensitivity (1.38) observation interval (seconds) background counts per observation interval total efficiency surveyor efficiency (0.5) detector area in cm2 (not to exceed 126 cm2)
The observation interval (i) is considered to be the amount of time required for the detector.
- field of view to pass over the area of concern. This time depends upon the scan speed, the size of the source, and the fraction of the detector's sensitive area that passes over the source.
The scan speed is based on one detector window width per second, however; other scan.
speeds may be used. For the Ludlum Model 43-68 gas flow proportional detector, the window width is 8.8 cm resulting in a scan speed of ~3.5 inches per second. The floor monitor detector is the Ludlum Model 43-37 with a window width of 13.35 cm which results in a scan speed of 5.25 inches per. second.
Page 43of47
ZS-LT-400"'001-001 1 Revision 3 Measurement Qu.ality Objectives for Survey Plans Information Use Beta Static Measurement MDC (direct/static) measurements utilize the following formula:
Where, MDCstatic Minimum Detectable Concentration in dpm/100 cm2 fs=
sample count time tb=
background count time Rb=
background count rate (cpm)
E1=
total efficiency A=
detector window area ( cm2)
An instrument alarm set point will be included for the floor monitor. The set point is based on the detector background plus the MDCR and is determined in the same fashion as other characterization surveys. Table 2 below depicts alarm set points for a deteCtability value (d')
of 1.3 8 based on a 95% correct detection rate *and a false positive rate of 60%. Table 3 presents several alarm set points based on different background values the scan speed will be 5.25 inches per second (13.34cm/s). The alarm set point values noted utilize the formula provided in the August 27, 2012 memo, "ZSRP Characterization Survey Package Attachment minimum Detectable Activity (MDA Calculations)*and Alarm Set Points".
Table 2 Ludlum Model 43-37 Detector Alarm Set Point For Scan Survey (Example Only)
Background
Alarin Set
Background
Alarm Set (cpm)
Point (cpm)
Point (cpm)*
(cpni)*
600 970 1200 1720 800 1225 1400 1960 1000 1475 1600 2200
- Values have been rounded Page 44of47
ZS-L T-400-001-001 1 Revision 3 Measurement Quality Objectives for Survey Plans Information Use An instrument alarm set point will be included for the Ludlum Model 43-68 detector. The set point is based on the detector background plus the MDCR and is determined in the same fashion as other characterization surveys. Table 3 below depicts alarm set points 'for a detectability value (d') of 1.38 based on a 95% correct detection rate and a false positive rate of 60%. Table 4 presents several alarm set points based on different background values and scan rate (5.0cm/s). The alarm set point values noted utilize the formula provided in the August 27, 2012 memo, "ZSRP Characterization Survey Package Attachment minimum Detectable Activity (MDA Calculations) and Alarm Set Points".
Table3 Ludlum Model 43-68 Detector Alarm Set Points (Example Only)
Background
Alarm Set
Background
Alarm Set (cpm)
Point (cpm)
Point (cpm)*
(cpm)*
200 414 500 838 300 562 600 970 400 702 700 1100
- Values have been rounded An instrument alarm set point will be included for the Ludlum Model 43-93 detector. The set point is based on the detector background plus the MDCR and is determined in the same fashion as other characterization surveys. Table 4 below depicts alarm set points for a detectability value (d') of 1.38 based on a 95% correct detection rate and a false positive rate of 60%. Table 4A presents several alarm set points based on different background values and scan rate (5.0cm/s). The alarm set point values noted utilize the formula provided in the August 27, 2012 memo, "ZSRP Characterization Survey Package Attachment minimum Detectable Activity (MDA Calculations) and Alarm Set Points".
Table 4 Ludlum Model 43-93 Detector Alarm Set Points (Example Only)
Background
Alarm Set Background Alarm Set (cpm)
Point (cpm)
Point (cpm)*
(cpm)*
200 414 500.
838 300 562.
600 970 400 702 700 1100
- Values have been rounded Page 45of47 1
Measurement Quality Objectives for Survey Plans ZS-LT _;400-001-001 Revision 3 Information Use Table 5 Provides information on the GM detector for inaccessible scan areas that cannot be surveyed using the Ludlum Model 43-68 detector or equivalent Table 5 Ludlum Model 3 with Detector 44-9 (I)
Background
Scan MDC (cpm) 300 45,148 dpm/lOOcm1 lLJ
\\ Ludlum Model 3 with a 44-9 detector (pancake) the scan MDC is based on i==
0.88, p=0.5, d'= 1.38, Et = 0.16, Es = 0.25 and Rb =300cpm.
The GM detector Shall NOT be used to unconditionally release structures, system or miscellaneous M&E from the Zion Decommissioning Site. The GM shall be used only as an indicator for scanning inaccessible areas to determine if plant derived nuclides exists (based on its MDC value.).
Page 46 of 47
- ZS-LT-400-001-001 2 Revision 3 Miscellaneous M&E Survey Sheet Infonnation Use Survey Area/Plan #
Survey Area/M&E Classification#
% Survey Required M&EType Description, Total Number of Items and% Survey
- ofltems Surveyed
- QC Required Page 47 of 47
D&D Procedure Cover Page ZS-L T-400-001-002 Revision 2 Information Use CHARACTERIZATION/LICENSE TERMINATION PROCEDURE CONTAMINATION VERIFICATION SURVEYS PRIOR TO DEMOLITION Procedure No. ZS-LT-400-001-002 Revision No. 2 Preparer: (Print name I sign): ---~Qc.....OQ11,__
Date: October 27, 2016 CG Fuller
)
Secondary Reviewer: (Print name I sign): P.. -- tJ _/fl J J.~NJA Date: October 27, 2016
.Ron Slfifuee Regulatory Required Reviews (per AD-11, "Regulatory Reviews")
Part 72 ISFSI Impact License: 10 CFR 72.48 DYES l'8'J NO Part 50 License: 10 CFR 50.59 and 50.90 DYES IZINO Fire Protection: 10 CFR 50.48(f)
DYES IXINO Conditions of License: E-Plan: 10 CFR 50.54(q)
DYES IZINO QA Review Required? D YES fgl NO QA Reviewer:
NIA DATE:
Print Name I Signature Technical Review Required? D YES 1:8:1 NO Technical Reviewer:
NIA DATE:
Print Name i Signature Technical Reviewer:
N:A DATE:
Print Name I Si~nature Approval~v*~
DEPARTMENT MANAGER: Robert F. Yetter ~ l DATE: October 4, 2016 p*
rune I Signatu~ /
I DECOMI\\:fISSIONING PLANT MANAGER*:
NIA DATE:
Print Name I SignatUre
- Required for Technical Reviews only Effective Date: Oet. J1 aoJ ii Page 1 of23
Summary of Changes in Revision 2 ZS-LT-400-001-002 Revision 2 Information Use Edited Table 1 Recommended Area Coverage for Contamination Verification Surveys 5.2.6 Removed Attachment A 5.4.1 Removed Attachment A 5.4.2 added demolition contractor point of contact 5.4.5.1.D added guidance as to bounding and marking areas of elevated dose rates 5.4.5.2.E added guidance as to bounding, marking and posting areas ofloose contamination Edited Table 2 Recommended Open Afr Demolition Criteria Page 2 of23
\\
. ZS-t T-400-001-002 Revision 2 Information Use
- 1.
PURPOSE AND SCOPE...................... ~............................................................................... ;4
- 2.
RESPONSIBILITIES..........................................*................................................................. 4
- 3.
DEFINITIONS/ ACRONYMS................... ~.......................................................................... 7
- 4.
PRECAUTIONS; LIMITATIONS, AND PREREREQUISITES..................................... 8
- 5.
MAIN BODY...............................................................................................*.......................... 9 5.1.
Turnover of CVS area to the C/LT Group.................................................................. 9 5.2.
Survey Design............................................ ;.................................................................. 9 5.4.
Survey Performance....................................................................... :................... :...... 12
- 5.5.
Survey Data Review................................................................................................. 14 5.6.
CVS Package Close-Out..,.................................... :*************************************************~.. 14
- 6.
REFERENCES....................................................... ~**************~**~********************************************15
- 7.
RECORDS............................................................................................................................ 16
- 8.
ATTACHMENTS................................................................................................................ 16
- 9.
FORMS................................................................................................................................. 16 Page 3 of23
ZS-L T-400-001-002 Revision 2 Information Use
- 1. PURPOSE AND SCOPE 1.1. Purpose This procedure provides the guidance used to design, perform, control, evaluate and document Contamination Verification Surveys (CVS) performed to verify that pre-open air demolition contamination levels of radiological impacted systems, structures and components (SS Cs) of the site Radiologically Controlled Area (RCA) and non-RCA are below the established limits for open air demolition. This procedure also provides guidance for authorization and implementation of isolation techniques and engineering controls to prevent airborne release or spread of contamination during removal of SSCs that exceed the open air demolition criteria.
1.2. Scope The performance of CV~ will ensure airborne radioactivity levels resulting from open air demolition are maintained within regulatory limits and that off-site dose consequences remain As Low as Reasonably Achievable (ALARA). It is_ assumed that Radiation Protection Operations (RP Ops) provide job coverage surveys during the course of demolition that will demonstrate that the radiological condition of a specific area is suitable for CVS.
Radiological conditions attributed to SSCs identified that exceed open air demolition criteria will limit the survey of adjacent SSC in some instances As agreed to by the Director of Radiation Protection SSCs exceeding open air demolition criteria will be removed, employing isolation techniques and engineering controls adequate to prevent release of airborne radioactivity and the spread of contamination during removal.
.Supplemental CVS survey will be performed in the area(s) not previously surveyed adjacent to SSCs and areas potentially contaminated by removal of SSCs. Open air demolition in the area will not continue until the supplemental CVS is completed and re~mlts satisfactory.
- 2. RESPONSIBILITIES 2.1. Characterization/License Termination (C/LT) Manager is responsible for:
Providing direction for the development and implementation of CVS Packages for SSCs expected to meet or exceed open air demolition criteria Reviewing and approving all CVS Packages.
2.2. Director of Radiation Protection (DRP) is responsible for:
Reviewing survey results and authorizing, through signature, removal of SSCs that are suitable for open-air demolition.
Establishing the bounds of open air demolition activities relative to remaining SSCs with radiological conditions that exceed open air demolition criteria.
Page 4 of23
ZS-L T-400-001-002 Revision 2 Information Use Authorizing the removal of SSCs that exceed the open air demolition criteria and approving the isolation and engineering controls intended to prevent release of airborne radioactivity and the spread of contamination during removal.
2.3. Vice President fYP) D&D/Construction is responsible for:
- Ensuring that a reasonable effort has been made at the removal of all radioactive SSCs that exceed the open air demolition criteria pri()r to open air demolition.
Authorizing through signature removal of SSCs that exceed open air demolition criteria with isolation and engineering controls in place.
Ensuring through signature that identified safety hazards and concerns are adequately addressed.
2.4. Project Construction Managers are responsible for:
Notifying the C/LT Group of SSCs ready for CVS and identifying those that are likely to exceed open air demolition criteria based on documented operational RP surveys.
- Notifying the C/LT Group when SSCs exceeding the CVS criteria have been removed and the area is ready for a supplemental CVS.
Assisting in providing support and access to areas to be surveyed, as required.
Ensuring housekeeping is performed, any tools or equipment not required to
. support survey activities are removed.
Ensuring isolation and engineering controls for SSCs that exceed the open air demolition criteria are implemented prior to performing open air demolition in adjacent areas.
2.5. Characterization/License Termination (C/LT) Engineers are responsible for:
Preparing CVS Packages.
Ensuring SSC preparation prior to initiating CVS.
Ensuring CVS are performed, results, evaluated, and documented correctly.
. Maintaining, and controlling CVS Pckages and completed survey* documentation.
Ensuring only approved instrumentation is used to perform CVS surveys and the instrumentation is capable of meeting the required Minimum Detectable Concentrations (MDCs).
2.6.
- Characterization/License Termination C/L T Supervisors are responsible for:
Ensuring CVS surveys are conducted in accordance with written CVS Packages, based on approved procedures and work instructions.
Control and implementation of CVS Package instructions during field activities.
Page 5 of23
ZS-L T-400-001-002 Revision 2 Information Use Providing daily supervision and guidance to field survey technicians and performing quality checks of field activities.
Establishing and maintaining isolation and control of structures, systems, and components to prevent inadvertent re-contamination of areas previously surveyed.
Reviewing and approving entries into CVS controlled areas for any activities following initiation of CVS in an area.
2.7. Data Base/LTP Support Engineer Is responsible for:
- Establishing and maintaining CVS Package index and filing locations.
Ensuring CVS Packages and plans are properly labeled, stored, and controlled per -
RM-ZN-101, "Records Management Program."
Maintaining a list of LTP personnel authorized to access the files.
Tracking the status of the CVS Packages and support documents.
2.8. Characterization/License Termination (C/LT) and RP Operations Technicians - are
-responsible for:
Performing CVS as directed by the C/LT Supervisor(s) using approvt;!d S3:mple plans, procedures and other documentation as appropriate.
Initiating and maintaining isolation access control measures prior to and during CVS activities.
2.9. Project Personnel - are responsible for:
Reading and adhering to CVS postings and ensuring the integrity of CVS access controls is not compromised.
2.10. Technical Lead/RE - is responsible for:
_ Reviewing all CVS Packages prior to implementation and providing technical oversight during survey implementation and data review and approval.
Communicating with Project Construction Managers relative contractor activities.
Page 6 of23
- 3. DEFINITIONS/ ACRONYMS ZS-L T-400-001-002 Revision 2 Information Use 3.1. Measurement - Radioactivity measurement obtained by placing a radiation detector near the surface or media being surveyed. An indication of the resulting radioactivity level is read out directly.
3.2. Mean - The average value obtained when the sum of individual values is. divided by the total number of values.
3.3. Minimal Detectable Count Rate - The a priori minimum count rate that a specific
- instrument or technique can be expected to detect 95% of the till}e.
3.4. Survey - A systematic evaluation and documentation ofradiological measurements with correctly calibrated instrument or instruments that meet the sensitivity required by the objective of the evaluation.
3.5. CVS Area - CVS areas are established based on logical physical boundaries and site landmarks for the purpose of documenting and conveying radiological information, and to facilitate the scheduling, management and performance of Open Air Dem?lition. The survey area may encompass one or more survey units.
3.6. CVS Package - A collection of files and information in a standardized format for controlling and documenting field measurements collected for CVS. CVS Packages contain at a minimum, survey instructions, the number and location of survey measurements and samples, survey maps, instrumentation requirements, and safety requirement as necessary. The CVS Package will contain all the QA records and other documentation relevant to, the CVS Package.
- 3. 7. Survey Unit - A contiguous unit within a survey area of similar use history and the same classification of contamination potential.
3.8. ACRONYMNS.
ALARA As Low As Reasonably Achievable CVS Contamination Verification Survey C/LT
- Characterization/License Termination MDCR Minimum Detectable Count Rate
- QA Quality Assurance QAPP Quality Assurance Project Plan QC Quality Control RCA Radiological Controlled Area RE Radiological Engineer SSC Structures, Systems, Components TSD Technical Support Document ZSRP Zion Station Restoration Project Page 7 of23
\\
ZS-L T-400-001-002 Revision 2 Information Use
- 4. PRECAUTIONS, LIMITATIONS, AND PREREREQUISITES 4.1. Precautions 4.1.1 Documents and databases containing CVS data and survey records are QA records when complete. Positive control of the records shall be maintained until such time that they are forwarded to Records Management.
4.1.2 When documenting survey information, all personnel shall ensure that QA records are in good quality and legible. Legibility is determined to be readable and reproducible.
4.1.3
- The pre-survey walk down will identify potential industrial safety hazards within.
- a specific unit.
4.1.4 Beware of physical changes to SSC resulting from decommissioning activities previously performed.
4.2. Limitations 4.2.1 Survey instrumentation and analytical laboratory equipment and procedures should be selected based on detection, sensitivity capabilities, and temperature limitations for the expected contaminants and their quantities.
4.2.2 Radiation detection and measurement instrumentation will be selected based on the type and quantity of radiation to be measured.
4.2.3 Only qualified C/L T or RP Operations Technicians will perform CVSs.
4.3. Prerequisites 4.3.1 Identification of SS Cs likely to exceed open air demolition criteria and for which isolation and engineering controls are required 4.3.2 Identification of areas ready for a Supplemental CVS aft~r removal of SSC that exceed the open air demolition criteria.
4.3.3 Housekeeping activities that may interfere with the performance of the survey, such as clean-up of debris and/or removal of tools or equipment, shall be completed, as required by the C/L T Group, prior to initiating the CVS in that area.
4.3.4 All survey or counting instrumentation used to produce CVS data must be able to achieve adequate sensitivity to demonstrate contamination verification criteria.
4.3.5 The CVS Package shall be approved by the C/L T Manager or Designee prior to implementation.
4.3.6 Release of the surveyed area for Open Air Demolition shall be approved by the C/LT Manager.
4.3.7 All personnel involved with the physical survey of a specific area shall receive a pre-job brief in accordance with HU-ZN-1211, "Pre Job Briefings" and the CVS plan prior to working in that area.
Page 8 of23
ZS-L T-400-001-002 Revision 2 Information Use 4.3.8 The use of computer-generated forms in lieu of procedural attachments is permitted provided the information required by the procedure is included on the forms.
- 5. MAINBODY S.1. Turnover of CVS area to the C/LT Group 5.1.1 The Project Construction Managers shall ensure, in coordination with the C/LT Group, that the SSC is suitable for turnover to the C/LT Group by performing the following:
1.)
Complete any necessary pre-survey engineering/construction activities in the area.
2.)
Verify performance of housekeeping to ensure any tools or equipment not required to support survey activities have been removed.
3.)
Ensure any additional measures intended to isolate the SSC andimplement engineering controls to limit the spread of contamination into or out of adjacent areas (i.e., plug vent louvers, cover floor gratings, etc.).
4.)
Ensure all identified safety issues have been addressed (i.e., cover holes in floor, etc.).
5.)
Sign the Demolition & Decommissioning Group Request for Survey section of to signify area is acceptable for turnover.
6.)
Forward Attachment 1 to the VP D&D/Construction for signature.
5.1.2 The VP D&D/Construction shall ensure a reasonable effort at removal or remediation activities in the SSC CVS area are completed by signing the appropriate section of Attachment 1 and forwarding the attachment to the C/LT Group.
5.1.3 The C/LT Supervisor or C/LT RE shall verify the SSC is in a condition suitable for survey by signing the Demolition& Decommissioning Group Request for Survey section of Attachment 1.
5.2. Survey Design 5.2.1 The C/LT RE shall prepare a CVS or Supplemental CVS plan when directed by the C/LT Manager or Designee as follows:
1.. )
Review ZS-L T-400-001-002, Attachment 1, "Contamination Verification Survey Area Release for Demolition," for a description of the SSC to be surveyed and SSCs identified that are likely to exceed open air demolition criteria.
2.)
Perform a walk down of the SSCs and verify that the SSCs are in a condition suitable for survey and sign ZS~LT-400-001-002, Attachment 1, "Contamination Verification Survey Area Release for Demolition," if appropriate.
Page 9 of23*
ZS-L T-400-001-002 Revision 2 Information Use 3.)
Perform a walk down of the SSCs, identify safety hazards present and initiate ZS-LT-400-001-002, Attachment 3, "CVS Area Turnover and Access Control."
5.2.2 Initiate ZS-LT-400-001-002, Attachment 4, "Radiological Survey Instructions for Contamination Verification Survey:"
1.)
Select the CVS Package ID Number and Survey Unit number using the guidance from Table 1 of ZS-LT-04, "Characterization of Structural Survey Units That Will Not Be Subjected to Final Status Survey."
2.)
Update the status of the CVS Package ID Number and Survey Unit Identifier in
- the CVS matrix folder on the "O" drive.
3.)
Multipk smaller survey units may be incorporated into a CVS Package in order to optimize the performance of the CVS, if necessary.
4.)
Identify (photo document) the S~Cs to be surveyed within the CVS Package area:
A.
Systems and their functions: electrical, service water, primary system piping, drains, etc...
B.
.Structural surfaces in m2: floors, upper and lower walls, ceilings/overheads, columns, pedestals, etc.,.
C.
Components such as pumps, tanks, based on surface area in m2 as appropriate.
5.)
Assess the radiological consequences of the documented.operational history and of decommissioning activities performed in the area.
6.)
Review current radiological survey data.
5.2.3 The C/LT RE shall prepare General Survey Instructions for each CVS Package as follows:
1.)
Prescribe the minimum gamma contact dose rate scan area coverage (percentage) using the guidance provided in Table 1, Recommended Area Coverage for Contamination Verification Surveys, and professional judgment.
2.)
Prescribe the number of loose surface contamination sample locations required:
A.
Minimum of 30 locations per CVS Package.
- B.
One (1) smear is required at each contact dose rate measurement location.
C.
- Additional smear sample locations as per the guidance of Table 1.
Page 10 of23
i
- 1.
I.
ZS-L T-400-001-002 Revision 2 Information Use Table 1, Recommended Area Coverage for Contamination Verification Surveys Surface Area Contact Dose Rate Scan Smear Surveys Coverage Basement Floors and Smear samples will be collected at the.
Sump Bottoms and 100%
location of each documented contact Walls dose rate measurement.
All Other Floors 10%
Engineering judgment to be used to Each Elevation 100%
guide additional smears locations i.e.
Below Grade (588')
penetration, pedestals, floor drains
- Perimeter Walls < 2m cracks in concrete, top surface of s.scs etc....
Each Elevation 5%
All smear sample locations will be Below Grade (588')
documented on CVS Package maps Perimeter Walls > 2m (Att. 6).
All Other Interior 10%
Smears samples shall be analyzed for Walls <2m w
D and Dcontc All Other Interior 5%
Smear sample analysis results will be Walls> 2m documented on Direct Measurement Ceilings 5%
and Loose Surface Contamination Survey Data (Att. 5).
- Roof 10%
Systems Components 10%- 100% of accessible surfaces 5.2.4 1.)
Identify the instruments to be used for the CVS as follows:
2.)
5.2.5 5.2.6 5.2.7 Select instrumentation to provide both reliable operation and adequate sensitivity to demonstrate attainment of the established limits.
- Ensure instrumentation is setup, operated and maintained in accordance with the appropriate procedures.
The C/LT RE shall perform a Job Hazard Assessment (JHA) in accordance with ZS-SA-01, "Health and Safety Plan Pocket Guide, Rev. 7" and document the JHA on Attachment 3.
Prepare a HU-ZN-1211, "Pre Job Briefings," for performing the CVS plan.
- Forward CVS Package and Pre Job Briefing to the C/LT Technical Lead/RE for review.
5.2.8 The C/LT Technical Lead/~ shall review the CVS Package to ensure it is appropriate for the SSC to be surveyed and sign when complete.
5.2.9 The C/LT Technical Lead/RE shall forward the CVS Package to the C/LT Manager for review and approval by signature.
Page 11 of23
ZS-L T-400-00 l-002
.Revision 2 Information Use 5.3.Access Control Measures NOTE While it is highly desirable to control access to specific areas as soon as possible following completion of pre-demolition activities, it is absolutely essential that access be positively controlled at the time of and following the CVS.
The bound_s of areas around SS Cs that exceed the open air demolition criteria will be posted as per the radiological conditions in the area and to prevent movement of material out. of these areas without C/L T Group authorization.
5.3.1 The C/LT or RP Operations Technicians shall establish controls and postthe area by performing the following:
1.)
Use additional controls such as ropes, barricades, tamper proof seals, locks and contamination monitoring instrumentation for personnel and equipment prior to entering the area, as necessary.
2.)
Place postings such as illustrated in Attachment 2 at the entrances to.survey areas.
5.3.2 The C/LT or RP Operations Technicians shall establish controls and post the areas around SSCs that exceed open air demolition criteria to prevent movement of material out of these areas.
5.3.3 The*C/LT Supervisor shall verify access controls and area postings have been established, sign Attachment 3, and forward to the C/LT RE.
5.3.4 The C/LT RE shall verify access controls and area postings have been established, sign Attachment 3 and forward to C/LT Manager or Designee for review.
1.)
File Attachment 3 with the CVS package for the SSC.
5.3.5 The C/LT manager or Designee will communicate to Project Construction Managers that access controls are in place.
5.4. Survey Performance 5.4.1 Prior to implementing the CVS Plan, the C/LT Supervisor shall perform a pre-job brief in accordance with HU-ZN-1211, "Pre Job Briefings," incorporating the JHA and requirements of the HASP and CVS Package.
5.4.2 5.4.3
-5.4.4 Access to the area will be coordinated with the cognizant Project Construction Manager and a demolition contractor point of contact.
- The CiLT or RP Operations Technician(s) shall review the survey instructions from the CVS Package to ensure an understanding of survey and documentation requirements.
The C/LT or RP Operations Technician(s) shall obtain the instruments necessary to perform the survey as indicated in the survey instructions (energy compensated GM tube or Ion Chamber).
Page 12 of23 I
ZS-L T-400-001-002 Revision 2 1
- Information Use 5.4.5 The C/LTor RP Operations Technician(s) shall use survey techniques in accordance with ZS-RP-: 105-001-001, "Radiological Surveys," other applicable procedures and instructions specified in the CVS Package.
1.)
Perform a contact dose rate scan survey of the identified SSC surfaces as follows:
A.
For structural surfaces, floors, walls and overheads; note the highest contact dose rate in scanned area and document the highest contact dose rate (the number of documented measurements should be equal to the minimum percentage of total surface in m2, rounded up for fractions).
B.
For systems and components surfaces, note the highest indicated dose rate per surface scanned.
C.
Identify the survey locations and record the highest indicated dose rate on the appropriate survey form/map (Examples are provided in Attachments 5 and 6).
D.
Physically mark the bounds of areas of elevated dose rate indications
(>75% of the Contact Dose Rate Limit, see Table 2) with magenta paint, bound this area with a yellow paint border and notify C/LT Supervisor.
2.)
Perform removable contamination surveys as follows:
A.
Record all smear sample locations on the survey map (Attachment 6).
B.
Obtain smear sample at the location of highest indicated dose rate during the contact dose rate scan survey.
C.
Obtain additional smear samples at locations based on the guidance in Table 1.
D.
Analyze all smears for Wr and a activity and record the results on the CVS data form (Attachment 5).
E.
- Identify the bounds ofcontaminated areas (See Table 2 for Contamination Limits), physically mark the area in the field, document on survey map and notify Supervisor and post in accordance with ZS-RP 105-003-001 Radiological Postings and Labeling Requirements.
5.4.6 The C/LT or RP Operations Technician(s) shall forward the completed survey documentatfon to the C/LT Supervisor for review.
Page 13 of23
5.5. Survey Data Review ZS-L T-400-001-002 Revision 2 Information Use 5.5.1 Upon completion of survey activities, the C/LT Supervisor shall verify all required measurements were collected and are documented appropriately.
5.5.2 The C/LT Supervisor will then sign Attachments 5 and 6 as a reviewer and forward them to the C/L T RE.
5.5.3 The C/LT RE will review the CVS documentation and calculate the mean and maximum values for loose surface contamination measurements recorded on.
5.5.4 The C/LT RE will compare the CVS Packages data to the open a:ir demolition criteria (see Table 2 below) and identify SSCs that meet/exceed the open air demolition criteria.
T bl 2 R a e. '
ddO ecommen e 1pen A" D Ir l"f c "t emo 110n n errn Contact Dose Rate Loose Surface Contamination
'Y 6/y a
2 mR/hr contact 1.0 mR/hr cpntact 1000 dpm/l 00qn2 Max 20 pm/100cm2 basement floor, sumps, 300 dpm/100cm2 Avg.
Max and each elevation below grade (588') perimet~r walls <2m 5.6.
CVS Package Close-Out
- 5.6.1 IF all CVS Package data is below the open air demolition criteria THEN, the C/LT RE will sign and date Attachment 1 under CVS Package Complete.
5.6.2 The C/LT RE shall forward Attachment I CVS Package to C/LT Technical Lead for final review and signature.
5.6.3 The C/LT Technical Lead shall sign Attachment! after review and forward the CVS Package to C/LT Manager for final review and signature.
5.6.4 The C/LT Manager shall provide the CVS Package and documentation to the Director of Radiation Protection and VP of D&D/Construction for their review and approval by signature on Attachment 1.
5.6.5 IF all or a portion of CVS Package data exceeds the open air demolition criteria THEN, the C/L T RE will sign and date Attachment 1 under C/LT Group Review.
5.6.6 The C/LT RE shall forward Attachment 1 CVS Package to C/LT Technical Lead
. for final review and signature.
5.6.7 The C/LT Technical Lead shall sign Attachment 1 after review and forward the CVS Package to C/L T Manager for final review and signature.
'Page 14 of23
ZS-L T-400-001-002 Revision 2 Information Use 5.6.8 The C/LT Manager shall discuss the completed CVS documentation with the Director of Radiation Protection and VP ofD&D/Construction for their review and consideration for further remediation of the area and/or implementation of isolation and engineering.controls for removal of the SS Cs followed by additional CVS prior to continuation of open air demolition..
5.6.9 The completed original CVS Package with attachments will be forwarded to the Database and LTP Support Engineer for filing and retention.
- 6. REFERENCES 6.1. ZSRP License Termination Plan 6.2. NRC HPPOS-071, Control of Radioactively Contaminated Material 6.3. NRC-HPPOS-073, Surveys of Waste from Nuclear Reactor Facilities before Disposal.
6.4. NRC Information Notice No. 85-92, Control of Radioactively Contaminated Materials, May 1981.
6.5. TSD-10-002, Technical Basis for Radiological Limits for Structure/Building Open Air Demolition.
6.6. ISO 7503-1, "Evaluation of surface contamination - Part 1: Beta emitters (maximum beta energy greater than 0.15 MeV) an.d alpha emitters", 1988.
6.7. AD-20, Records Management Program 6.8. ZS-LT-01, Quality Assurance Project Plan (QAPP) for Characterization and FRS 6.9. ZS-LT-02, Characterization Survey Plan 6.rn. ZS-RP-105-003-001, Radiological Postings and Labeling Requirements 6.ll. ZS-RP-105-001-001, Radiological Surveys 6.12. ZS-RP-108~000-000, Radiological Instrumentation Program 6.13. Instrument Operation Manuals.
6.14. ZS-LT-04, Characterization of Structural Survey Units That Will Not Be Subjected To Final Status Survey 6.15. ZS-SA-01, ZionSolutions Health and Safety Plan 6.16. HU-ZN-1211, Pre Job Briefings Page 15 of23
- 7. RECORDS 7.1. Attachment 1 - CVS Area Release for Demolition 7.2. Attachment 3 - CVS Area Turnover, Acceptance and Access Control ZS-L T-400-001-002 Revision2 Information Use
- 73. Attachment 4-Radiological Survey Instructions for Contamination Verification Survey 7.4. Attachment 5 -Direct Measurement and Loose Surface Contamination Survey Data 7.5. Attachment 6-Survey Map (Example)
- 8. ATTACHMENTS 8.1. Attachment 1 - CVS Area Relea~e for Demolition 8.2. Attachment 2 - Example Posting for Pre-Demolition Surveys 8.3. Attachment 3 - CVS Area Turnover, Acceptance and Access Control 8.4. Attachment 4-Radiological Survey Instructions for Contamination Verification Survey 8.5. Attachment 5 -Direct Measurement and Loose Surface Contamination Survey Data 8.6. Attachment 6-Survey Map (Example)
- 9. FORMS None Page 16 of23 Contamination Verification Survey Area
- Release for Demolition D&D Request Group for Survey Demolition Area Building Demolition Start Date Elevation SSCs likely to exceed the open air demolition criteria:
Attach current RP survey of SSCs Cognizant Project Construction Manager Print/Sign VP D&D/Construction Print/Sign
- _J Check indicates that the area is in a condition suitable for CVS Cognizant C/LT RE
_J Check indicates CVS complete Cognizant C/LT RE Print/Sign Print/Sign ZS-LT-400-001-002 Revision 2 *I Information Use Date Date Date Date Check indicates CVS Data Review Complete SSCs results are satisfactory Check indicates CVS Data Review Complete SSCs results exceed operi air demolition C/LT technical Lead RE Print/Sign Date C/L T Manager.
Print/Sign Date*
Check indicates SSCs approved for open air demolition Check indicates SSCs require isolation and engineering controls for removal in open air Director of Radiation Protection (RPM)
Print/Sign Date VP D&D/Construction Print/Sign Date Page 17 of23 Posting for Pre,..Demolition Surveys (Example)
NOTICE ZS-L T-400-001-002 Revision 2. I Information Use A PRE-DEMOLITION SURVEY IS IN PROGRESS.
OR HAS BEEN COMPLETED IN THIS AREA
- NO DECOMMISSIONING/DEMOLITION.
ACTIVITES ARE TO BE PERFORMED IN THIS AREA THE USE, MOVEMENT OR STORAGE OF RADIOACTIVE MATERIAL IS PROHIBITED IN THIS AREA
- ENTRY OF PERSONNEL IN THIS AREA IS PROHIBITED WITHOUT.THE AUTHORIZATION OF C/L T SUPERVISION EXTENSION: ----------
Page 18 of23 CVS Area Turnover and Access Control.
ZS-L T-400-001-002 Revision 2 J Information Use Turnover I Acceptalu.~e of Area Hazardous Awareness Pre walk down of CVS Package Area.
D -Cold work environment D - Hazardous Atmospheres D -Exposed electrical circuitry D - Stinging Insects D -Load bearing stresses D - Sharp Objects or surfaces D -Hazardous plants and/ or D -Lack of structural D - Falling Objects animals integrity D -Released of stored D -Tripping Hazards energy sources D -Other*
(hydraulic, steam, etc... )
D 7 Standing Water > I ft deep D - Buried utilities 0-0ther*
D -Fall hazards D -Overhead power lines D - Work @ height > 6ft D - Kinetic energy sources (moving equipment)
D -Open excavations D -Vehide traffic
- Comments:
D Area meets the criteria for I D Access Controls are instituted I D Area is acceptable for CVS turnover and completed.
C/LT Supervisor Print/Sign Date C/LT RE Print/Sign Date The area meets the criteria for turnover to the C/L T Group. Access Controls have been established. Area is acceptable for CVS.
C/L T Manager Print/Sign Date Comments:
Page 19 of23 Radiological Survey Instructions for Contamination Verification Survey (Page i of2)
I PACKAGE ID: '
Ii SURVEY UNITS/SSC:.
Description of CVS Package Ar~a:
Historical Information General Instructions
- ~
Page.20 of23 ZS-L T-400-001-002 Revision 2 Information Use
- Package ID:
Radiological Survey Instructions for Contamination Verification Survey (Page 2 of2)
I CVS Survey Units/SSC:
Instrumentation Measurement Instrument Detector Scan Speed Type Model Model ZS-LT-400-001-002 Revision 2 Information Use Mode Count Time Individuals performing survey have read and understood this plan and are aware of the hazards identified on Attachment 3.
Performed by:
Date:
Performed by:
Date Performed by:
Date:
Performed by:
Date:
Performed by:
Date:
Instructions Prepared by:
C/L T RE Print/Sign Date Instructions Reviewed by:
Technical Lead/RE Print/Sign Date Instructions Approved by:
C/LT Manager Print/Sign Date Page 21 of23
Number Total Mean Value Maximum Value Reviewed By:
Reviewed By:
Direct Measurement and Loose Surface Contamination
- Survey Data SURVEY RESULTS Location WY Contact a Smear (mR/hr)
(dpm/100 cm2)
SURVEY
SUMMARY
WY Contact WY Smear (mR/hr)
(dpm/100 cm2)
C/LT Supervisor Print/Sign Date C/LT RE Print/Sign Date Page 22 of23 ZS-L T-400-001-002 Revision 2 I Information Use WY Smear (dpm/100 cm2) a Smear (dpm/100 cm2)
'"C
~
N
~
0 H; N w SURVEY it*:.. ----
---*DATE: L Survey.UNIT:*:
- -*BLDG:*
i+ o.escription:-*
Purpose<>f*Survey:ll 0*Class*l*l:fil*Class*2*0*Class*3*0*NAlt Disposition-Option:,._,
- n INST*MODElll SERIAL#n Pre-.,( Post-.,(
II ll D.n On
- II ll On Q.n Tu II On On
- II II On On Beta*gamma*Contact*Doserate-Survey~
'Ii D*All*p~-are<2mRlhr'll n
Smear*Survey*~
D.*Results-attachedfor-smear-results.ll Materials*and*Equipment*Descriptionll Item if II Descriptionn N/A:::r See-:Map:::r N/Aa N/Aa N/Au N!AD N/Aa N/Aa N/Aa N/Aa II.
Peer-Check-..
- Page****of-................ ll
{_
- TIME:* ----;:r I:*,,
Namell
- ELEV:
ll ll
- -*NOTE:-I?2Ji~!:.'!!!:~*are *in !!!B!hr-unless-otherwise*noted~
D I::!
l:::r
-DATE:*
I I
RPSApproval{Signature)
.;;;:.,~~
~]JONSOLUTIONSll
~.*£.,;o;..!;;>1.w1:::,.,.._¥",
- DATE;............. f............ 1_......... 'Ii 1J') =
"'I
~ ~-
~~
= =-
"Cl 9
~ ('D llo.
s ~ g
~ (1)
I
-* < 0 0
u;* 0
- s
-* ~
c::: 0 I
rJ;
- i g (1) NN