Forwards IE Insp Repts 50-010/81-08,50-237/81-17 & 50-249/81-12 on 810606-0702 & Notice of Violation
ML17194A083
Person / Time
Site: Dresden  
Issue date: 07/30/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML17194A084 List:
References
NUDOCS 8108170384
Download: ML17194A083 (2)


See also: IR 05000010/1981008

Text

Docket No. 50-10

. Docket No CS0-237

Docket No. 50-249 -

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL

60690

Gent:.lemen:

JJ(t. 30 tti'I .lE_flLE __ QDJ .* 11/

  • ~ .. *-.
  • . *~ ; ....

This refers to the routine safety inspection conducted by Messrs.

T. M. Tongue and M. J. Jordan of this office during the period of

June 6 through July 2, 1981, of activities ~t the Dresden Nuclear

Power Station, Units 1, 2 and 3, authorized"by NRC Operating Licenses

No. DPR-02, No. DPR-19 and No. DPR-25 and to the discussion of our

findings with Mr. D. Scott, Station Superintendent and other of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection.

Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in enclosed Appendix A.

A

written response, submitted under oath or affirmation, is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter, the enclosures, and your response to this letter will be

placed in the NRC's Public Document Room.

If the enclosures contain any

information that you or your contractors believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4}, it is necessary that you (a) notify this

office by telephone within seven (7) days from the date of this letter of

your intention to file a request for withholding; and (b) submit within

twenty-five (25) days from the date of this letter a written application

s1os17003c~40~6865~o

PDR AD

n

PDR

G

Commonwealth Edison Company

- 2 -

to this office to withhold such 'information.

Section 2. 790(b) (1) requires

that any such application must be accompanied by an affidavit executed by

the owner of the information which identifies the document or part sought

to be withheld, and which contains a full statement of the reasons ori the

basis which it. is claimed that the information should be withheld from

public disclosure.

This section further requires the statement to address

with specificity the considerations listed in 10 CFR 2.790(b)(4).

The

information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, a copy of this letter,

the enclosures, and your response to this letter will be placed in the

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No.

50-10/8~-08,

No. 50-237/81-17 and

No. 50-249/81-12

cc w/encls:

Louis 0. DelGeorge, Director

of Nuclear Licensing

D. J. Scott,

Station Superintendent

DMB/Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

RIII

RIII

RIII

.... *

Sincerely,

R. F. Hei!J~n~-A1:~:~k:

Division of Resident and

Project Inspection

RIII

,,...

Tongue/jp

7/23/81

Jordan

Reimann

,,.2{ry

Heishman

/><~-,---