ML17193B242
| ML17193B242 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 02/13/1981 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML17193B243 | List: |
| References | |
| NUDOCS 8103260044 | |
| Download: ML17193B242 (2) | |
See also: IR 05000237/1981001
Text
{{#Wiki_filter:* UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill Docket No. 50-237 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President P. 0. Box 767 C~icago, IL 60690 Gentlemen: 799 ROOSEVELT ROAD GLEN ELLYN, ILLINOIS 60137 FEB 1 3 1QAf \\ This refers to the routine inspection conducted by Mr. W. J. Key of this office on January 6-7, 14-15, and 22, 1981, of activities at Dresden Station, Unit 2, authorized by NRC Operating License No. DPR-19 and to the discussion of our findings with Mr. D. J. Scott and others of your staff at the conclusion of the inspection. The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel. No items of noncompliance with NRC requirements were identified during the course of this inspection. In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room, except as follows. If this report contains information that you or your contractors believe to be proprietary, you must apply in writing to this office, within twenty-five days of the date of this letter, to withhold such information from public disclosure. The application must include a full statement of the reasons for which the information is considered proprietary, and should be prepared so that proprietary information identified in the application is contained in an enclosure to the application . 8 ~ 0 928 0 O~'""\\ ~
Commonwealth Edison Company - 2 - Ff 8 l 3 19t;1 We will gladly discuss any questions you have concerning this inspection. Enclosure: IE Inspection Report No. 50-237/81-01 cc w/encl: Mr. J. S. Abel, Director of Nuclear Licensing Mr. D .. J. Scott, Station Superintendent Central Files Reproduction Unit NRC 20b AEOD Resident Inspector, RIII PDR Local PDR NSIC TIC Mr. Dean Hansell, Office of Assistant Attorney General RIII, . ~#~0' -{~y/jp 2/12/81 RIII ~ Danielson d.)1~J?1 RII~ Spa ard ~y Sincerely, G. Fiorelli, Chief Reactor Construction and Engineering Support Branch
an RI~- {l _..,_, .. Fiorelli }}