Requests Addl Info Re Loss of Offsite Power on 750821 to Aid in Review of Offsite Power Sys Adequacy.Requests Response within 90 Days
ML17192A502
Person / Time
Site: Dresden Constellation icon.png
Issue date: 09/18/1979
From: Ippolito T
Office of Nuclear Reactor Regulation
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 7910220316
Download: ML17192A502 (3)


Text

,..,

_/,;

C/

i7'*-

lj

."r Distribution

~ocket ORB #3 Dbcket No.

50~249 NRR Reading SEPTEMBER 1 8 1979 -

Local PDR NRC PDR Tippol ito RBevan '

Mr. Cordell* Reed Assistant ¥ice President Commonwealth Edison Company.*

P. o~. Box 767 Chicago,-Illinois 60690.

  • SSheppard Atty, OELD OI&E (3)

T JCarter

,WRussell OI&E (3)'

  • JRBuchana-n
  • TERA.

ACRS (16)

  • _Fr' bear Mr *. Reed:

. buimay DOCKET nu CD?V.**

L~e are currently reviewing *the-adequacy of*the offsite po\\'1er systems oP~

n~clea~ po0er plants and in particul~r, the loss of offsite power events at your.facility~ One aspect of this review* concerns the history of experienced total and partial power outages and. attendent_ voltage or freq~ency condi~ions of the grid.

In our review of this matter we ha~e dra~'/n upon* the *informatfon provided

  • io us via_Ucensee E~ent *Reports a~d foll?wu~ letters which you hav~

- ent to us. - Our r~v1ew of thes~ reports indicated the.loss.of offs1te to~er eventi have occurred at Oresden.Unii3 on~~gust 21, 1975~* - To complete our* review of 'loss of offsite power events we require the*

ad_ditional. infonnation co~cerning the Dresd.en Unit 3 offsite grid indicated in the enc 1 osur*e to this letter.

Please provide your response to the attached questions for Dresden Unit 3 within 90 days of rec~ipt of this Tetter. --

Enclosure:

Request for Additional Information cc w/enclosure:

Sincerely, Original Signe*i 5*

  • l\\A. lppq]j,tij I -'..

Thomas A. Ippolito;Ch-ief OperatiDQ Reactors Branch 13 Division of Op~rating Reactors 3' ~--

7919220

. - fl

...... :~................ ****~~~~~**** ~--t~;~;jf*:* -~~f:1t*****....... :J...................................

......................_.... *~~**9li~rHr****** *--~m~1~r.. *** -~?.

...... ************************* *******:.. './*... ~:.....

GP'P'ICllJ>

BURNAMll~

DATii~ ************************* *************************......... \\................ ************************* *:************************......,..,:..,..........

IOlC POllM 318 (9-76) NB.CH 0240 u.s. aOvBRNllS:~T PR~NTINQ OPP'ICB:., D71

  • Ill - 711

. Mr. Cordell Reed ColTITlonwealth Edison Company cc:

Mr. John W. Rowe Isham, Lincoln & Beale Counselor~ at Law One First National Plaza, 42nd Floor

  • Chicago,.Illinois 60603 Mr. B. B. Stephenson Plant Superintendent Dresden Nuclear Power Station
  • Rura 1 RoLJte #1

Washington, D. C.

20005 Morris.Public Library 604 Liberty Street Morris, Illinois 60451

    • Jimmy L. Barker U. S. Nuclear Regulatory Commission P. 0. Box 706 Mor~is, Illinois

~0450 Susan N. Sekuler Assistant Attorney General Environmental Control Division 188 W. Randolph Street Suite 2315 Chicago, Illinois 60601

  • SEPTrnarn T s 1979

REQUEST* FOR ADDITIONAL INFORMATION

  • A.

For losses of offsite power where less than all offsite power was lost:

l.

How many circuits to the offs He network are normally available and how many were lost during the event?

2 *. What was the cause of.the event?

3.** Why did the other lines not fail when some did fail?

4.

Was any voltage increase or decrease experienced just prior to or during the outage?

If so, please give detai1s, volt~ges reached~ affects~_etc.

5.

Was any frequency decay experienced just prior to or during the outage?

If so, please give details, lowest frequency reached, decay rate, affects on equipment operation, etc.

6.

How long_ was power unavailable from the circuit?

7.

Date of Event.

B.

For losses of all offsite power:

1.-

How long was the power offT How long for partial recovery? Please give details.

-2. If turbine trip occurred, hew soon after did loss of offsite power occur?

3. If power was recovered promptly (10 minutes or less), was it due to automatic or manual actions?
4.

Was any voltage increase or decrease experienced just prior to or during the outage? *If so, please give details; voltages reached, affects, etc.

5.

Was any frequency decay experienced just prior to or during the outage?

If so, please give details, lowest frequency reached, decay rate, affects on equipment operation, etc.

s: Date of.Event.

C.

Were there any other loss of offsite power events other than we have listed?

If so, ple~se give details of eaoh eve~t.