Forwards Insp Rept 50-249/97-27 on 971105-19 & Notice of Violation
ML17187B213
Person / Time
Site: Dresden 
Issue date: 12/05/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
COMMONWEALTH EDISON CO.
Shared Package
ML17187B214 List:
References
50-249-97-27, NUDOCS 9712160283
Download: ML17187B213 (2)


See also: IR 05000249/1997027

Text

1.x~ I OCL""':>

Mr. J. S. Perry

Site Vice President

Dresden Nuclear Power Station

Commonwealth Edison Company

6500 North Dresden Road

Morris, IL 60450

December 5, 1997

SUBJECT:

NRC INSPECTION REPORT 50-249/97027(DRS) AND NOTICE OF

VIOLATION

Dear Mr. Perry:

On November 19, 1997, the NRC completed an inspection at your Dresden Nuclear Power

Station, Unit 3. The purpose of the inspection was to review the implementation of the inservice

inspection program for the Dresden Unit 3 refueling outage 14. The enclosed report presents

the results of this inspection.

We concluded that, overall, the implementation of your inservice inspection program met

ASME,Section XI requirements. However, we identified a violation, in that, one radiographic

examination record could not be retrieved.

The violation is cited in the enclosed Notice of Violation (Notice) and the circumstance

surrounding it is described in detail in the enclosed report. Please note that you are required to

respond to this letter and should follow the instructions specified in the enclosed Notice when

preparing your response. The NRC will use your response, in part, to determine whether

further enforcement action is necessary to ensure compliance with regulatory requirements. In

accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning these inspections.

Docket No. 50-249

Enclosures:

1. Notice of Violation

Sincerely,

Original Signed By J. A. Grobe

John Grobe, Director

Division of Reactor Safety

2. Inspection Report 50-249/97027(DRS)

See Attached Distribution

I llllll lllll lllll lllll lllll llllll Ill llll

I

Ii

3

6

2

C

DOCUMENT NAME: G:\\DRE97027.DRS

To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" =

Copy w/attach/encl "N" = No copy

OFFICE

Rlll:DRS

C.

Rlll:DRS

/if

Rlll:DRP.

/I/

NAME

DATE

9712160283 971205

PDR

ADOCK 05000249

G

PDR

]::f10 I

I "/

I

J. S. Perry

2

cc w/encls:

0. Kingsley, Nuclear Generation Group

President & Chief Nuclear Officer

Distribution:

M. Wallace, Senior Vice President,

Corporate Services

E. Kraft, Vice President, BWR Operations

Liaison Officer, NOC-BOD

D. A. Sager, Vice President,

Generation Support

D. Farrar, Nuclear Regulatory

Services Manager

I. Johnson, Licensing Operations Manager

Document Control Desk - Licensing

T. Nauman, Station Manager, Unit 1

M. Heffley, Station Manager, Units 2 and 3

F. Spangenberg, Regulatory Assurance

Manager

Richard Hubbard

Nathan Schloss, Economist,

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce Commission

Docket File w/encls

PUBLIC IE-01 w/encls

OCFO/LFARB w/encls

DRP w/encls

SRI, Dresden w/encls

LPM, NRR w/encls

A. B. Beach, w/encls

.

J. L. Caldwell, Riii w/encls

DRS w/encls

Riii Enf, Coordinator, Riii w/encls

December 5, 1997

R. A. Capra, NRR w/encls

TSS w/encls

Riii PRR w/encls

DOCDESK w/encls

CAA 1 w/encls