Forwards Special Insp Team Insp Repts 50-237/92-33 & 50-249/92-33 on 921130-1204 Re Control Rod Mispositioning Event on 920918 & Failure to Report Event Per Station Procedures
ML17179B078
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/09/1993
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Delgeorge L
COMMONWEALTH EDISON CO.
Shared Package
ML17179B079 List:
References
EA-93-182, NUDOCS 9309200074
Download: ML17179B078 (4)


See also: IR 05000237/1992033

Text

I

Docket No. 50-237; 50-249

License No. DPR-19; DPR-25

EA 93'"-182

Commonwealth Edison Company

ATTN:

Mr. L. 0. DelGeorge

SEP o 9 1993

Vice President, Nuclear Oversight

and Regulatory Services

Executive Towers West III

1400 Opus Place Suite 300

Downers Grove, IL

60515

Dear Mr. DelGeorge:

The enclos~d report refers to.an onsite inspection by an NRC Special

Inspection Team on November 30 through December 4, 1992, at the Dresden

  • Nuclear Power Plant relative to a control rod mispositioning event that

occurred on September 18, 1992, and the failure to report that event in

accordance with station procedures.

The team was composed of Messrs. P. L.

Hiland, F. L. Brush_, and H. Peterson, of this office; and Mr. B. L. Siegel of

the Office of Nuclear Reactor Regulation (NRR).

The enclosed copy of our report identifies areas examined during the

inspection.

Within these ar~as, the inspection consisted nf a selective

examination of procedures and representative records, observations, and

interviews with personnel.

The purpose of the inspection was to conduct a thorough and systematic review

of the September 18 event in order to determine the causes, conditions, and

circumstances pertaining to it, and to communi~ate to NRC.management the facts

and safety concerns related. to the event.. In combination with this

inspection, a review of previous similar events was also conducted.

Based on the results of this inspection, two apparent violation~ were

identified and are being considered for escalated enforcement action in

accordance with the "General Statement of Policy and Procedure for NRC

Enforcement Actions" (Enforcement Policy), 10 CFR Part 2, Appendix C.

The

apparent violations concern the failure to implement adequate .corrective

action for an April 10, 1992, control rod misposition event and failure to

follow plant procedures (multiple examples) during the September 18, 1992,

control rod misposition event. Accordingly, no Notice of Violation is

presently being issued for these inspection findings.

In addition, please be

advised that the number and characterization of apparent violations described

in the enclosed inspection report may change as a result of further NRC

review.

9309200074 9~09

g.x

.. ~-:~ .. :***. S00 97

PDR

ADOCK 05000237

,

O

PDR

~\\ '1

Commonwealth Edison Company

2

SEP O ~ 1993

We are particularly concerned because the September 16, 1993, control rod

mispositioning event may have .been prevented by adequate corrective actions

for a previous event. Further, the apparent root cause of the procedural

violations was deliberate misconduct.

An enforcement conference to discuss these apparent violations has been

scheduled for September 16, 1993.

The purposes of this conference are to

discuss the apparent violations, their root causes and their safety

significance; to provide you the opportunity to point out any errors in our

inspection report; and to provide an opportunity for you to present your

proposed corrective actions.

In addition, this is an opportunity for you to

provide any information concerning your perspective on the severity of the

issue, the factors that the NRC considers when it determines the amount of a

civil penalty that may be assessed in accordance with Section VI.B.2 of the

Enforcement Policy, and the possible basis for exercising discretion in

accordance with Section VII of the Enforcement Policy.

You will be advised by

separate correspondence of the results of our deliberations in this matter.

No response regarding these apparent violations is required at this time.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you may have concerning this inspection.

Enclosures:

Inspection Reports

No. 50-237/92033(DRP)

No. 50-249/92033(DRP)

cc w/enclosures:

M. Lyster, Site Vice President,

G. Spedl, Station Manager

J. Shields, Regulatory Assurance

Supervisor

D. Farrar, Nuclear Regulatory Services

Manager

OC/LFDCB

Resident Inspectors, Dresden

LaSalle, Quad Cities, Clinton

R. Hubbard

J. Mccaffrey, Chief, Public

Utilities Division

R. Newmann, Office of Public

Counsel, State of Illinois Center

Sincerely,

P.~~E~~~I~~~~-B-~ ~* _?* __ Gl~Ra~1:F..l~

Edward G. Greenman, Director

Division of Reactor Projects

Commonwealth Edison Company

cc w/encl osures: (Continued)

Licensing Project Manager, NRR

State Liaison Officer

Chairman, Illinois Commerce Commission

J. B. Martin, RIII

H. J. Miller, RIII

T. 0. Martin, RIII

J. E. Dyer, NRR

E. J. Leeds, NRR

M. L. Jordan, RIII

C. D. Pederson, RIII

S. Stasek, SRI, Davis Besse *

R. W. DeFayette, RIII

J. G. Partlow, NRR

J. Lieberman, OE

J. R. Goldberg, OGC

C. E. Rossi, NRR

J. W. Roe, NRR

J. A. Zwolinski, NRR

G. E. Grant, EDO

R. Hall, NRR

3

SEP u ~ 1993

~~&-.

See Attached Concurrences

E)i

f2 iJJ

RI II

.

~

De Fayette

Hausman

.fat9W: ~Forney

09/ g /93

09/DB /93

9/f/7J

09/

/93

RII I

RIII

RII I

RIII

R~f

RI~

Peterson

Brush

Hi 1 and

Clayton

p~

Gre'nman

09/

/93

09/

/93

09/

/93

09/

/93

09/

/93

09/ {\\/93

Commonwealth Edison Company

~c w/~nclosures: (Continued)

Licensing Project Manager, NRR

State Liaison Officer

Chairman, Illinois Commerce Commission

J. 8. Martin, RIII

H. J. Miller, RIII

T. 0. Martin, RIII

J. E. Dyer, NRR

E. J. Leeds, NRR

M. L. Jordan, RIII

C. D. Pederson, RIII

. S. Stasek, SRI, Davis Besse

R. W. Defayette, RIII

J. G. Partlow, NRR

J. Lieberman, OE

J. R. Goldberg, OGC

C. E. Rossi, NRR

J. W. Roe, NRR

J. A. Zwolinski, NRR

G. E. Grant, EDO

R. Hall, NRR

Rfl4v

Peterson

09/ (/93

Rf.z\\l

Brush~

09/ 1 /93

RIII~

Hffand

09/ I /93

3

R~

L, Clayton

f. 09/ "7 /93

RIII

Pawlik

09/ /93

SEP 0 9 1993

RIII

Greenman

09/ /93