NOTICE OF VIOLATION Commonwealth Edison Company Dresden Station, Units 2 and 3 Docket Nos.
50-237; 50-249 License Nos. DPR-19; DPR-25 During an NRC inspection conducted on March 16 through May 5, 1993, a violation of NRC requirements was identified.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions~" 10 CFR Part 2, Appendix C (1993), the violation is listed below:
10 CFR 50 Appendix B, Criterion V, Instructions, Procedures, and Drawings, states in part that activities affecting quality shall be prescribed by documented instructions, procedures, or drawing of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions.
Contrary to the above, instructions associated with work request Dl0760, approved on December 11, 1992, failed to specify instructions for the installation of a shunt trip device i~ the main feed breaker for motor control center 29-5/6.
As a result, the breaker did not open during logic testing on March 10, 1993.
This is a Severity Level IV violation (Supplement I).
The inspection showed that steps were taken to correct the identified violatioh and to prevent recurrence.
Consequently, no reply to the violation is required and we have no further questions regarding this matter.
Dated at Glen Ellyn, Illinois this z.G day of Mei-7 1 1993 9306090179 930526 PDR ADOCK 05000237 G
~??;4-Brent Clayton, Chief Reactor Projects Branch 1