James M. Welsch Pacific Gas and Electric Company Vice President, Nuclear Generation Diablo Canyon Power Plant Mail Code 104/6 _
June 21, 2017 PG&E Letter DCL-17-055 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2-P. 0. Box 56 Avila Beach, CA 93424 805. 545. 3242 Internal: 691. 3242 Fax: 805. 545.4884 10 CFR 50.90 Response to NRC Request for Additional Information Regarding License Amendment-Request 16-04. "Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01. Revision 6. 'Development of Emergency Action Levels for Non-Passive Reactors"'
References:
- 1. PG&E Letter DCL-16-099, License Amendment Request 16-04, "Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, 'Development of Emergency Action Levels for Non-Passive Reactors,"' dated October 25, 2016 (ADAMS Accession No. ML16315A184)
- 2. E-mail from NRC Project Manager Balwant K. Singal, "Request for Additional Information (RAI) - Revised Emergency Action Level Schemes Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6 (CAC Nos. MF8528 and MF8529)," dated April 12, 2017
Dear Commissioners and Staff:
License Amendment Request (LAR) 16-04, "Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, 'Development of Emergency.
Action Levels for Non-Passive Reactors,"' dated October 25, 2016, was submitted by Pacific Gas and Electric (PG&E) Letter DCL-16-099 (Reference 1).
In Reference 2, the NRC requested additional information required to complete the review of LAR 16-04. PG&E's responses to the Staff's questions are provided in. contains a list of changes made to the Emergency Action Levels (EALs) not associated with nor discussed in the request for additional information response.
These changes consist of: minor edits, clarifications, additional definitions, or technical basis document clarifications.
- ~ K LJ. S N~i:
A member of the STARS Alliance Callaway
- Diablo Canyon
- Palo Verde*
- Wolf Creek
Document Control Desk June 21, 2017 Page2 PG&E Letter DCL-17-055 contains a clean copy of the "Diablo Canyon Power Plant Emergency Plan, Appendix D-Emergency Action Level Technical Basis Document," that reflects the changes associated with this submittal.
Additionally, as previously discussed with NRC Project Manager Balwant K. Singal, PG&E is requesting a 365 day period for implementation of the license amendment
- after issuance.
PG&E makes no regulatory commitments (as defined by NEI 99-04) in this letter.
This letter includes no revisions to existing regulatory commitments.
If you have any questions, or require additional information, please contact Mr. Hossein Hamzehee at (805) 545-4720.
I state under penalty of perjury that the foregoing is true and correct.
Executed on June 21, 2017.
Sincerely,
_LfV\\-~
\\JJmes M. Welsch Vice President, Nuclear Generation armb/4743/50521100 Enclosures cc:
Diablo Distribution cc/enc:
Kriss M. Kennedy, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Gonzalo L. Perez, Branch Chief, California Department of Public Health Balwant K. Singal, NRC Project Manager A
member of the STARS Alliance Callaway
- Diablo Canyon
- Palo Verde*
- Wolf Creek