ML17177A595
| ML17177A595 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 08/14/1992 |
| From: | Beverly Clayton NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML17177A596 | List: |
| References | |
| NUDOCS 9208240078 | |
| Download: ML17177A595 (2) | |
See also: IR 05000237/1992020
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
Docket No.
50-237; 50-249
Commonwealth Edison Company
. ATTN:
Mr. Cordell Reed
Senior Vice President
Opus West II I
1400 Opus Place
Downers Grove,
IL 60515
Dear Mr. Reed:
REGION Ill
799 ROOSEVELT ROAD
GLEN ELLYN, ILLINOIS 60137
AUG l 4 b~-
This refers to the inspection conducted by W. Rogers, M~ Peck,
A. M. Bongiovanni, A. Markley, K. Riemer, and A. Vegel of this office, and by
R. Zuffa of the Illinois Department of Nuclear Safety, on July 7 through
July 31, 1992. The inspection included a review of activities authorized for
- your Dresden Nuclear Station, Units 2 and 3, facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities i~ progress.
Based on the results of this inspection, certain of your activities _appeared .
to be in violation of NRC requirements, as specified in the enclosed Notice.
Although Section 2.201 requires you to submit to this office, within 20 days
of your receipt of.this Notice~ a written statement of explanation, ~e note
that this violation had been corrected and those actions were reviewed during
this inspection. Therefore, no response with respect to the violation is
required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC Publi6 Document Room.
.
.
.
.
Any responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
9208240078 920814
ADOCK 05000237
G
r .
- *
- Commonwealth Edison Company
2
AUG 1 4 1992
We will gladly discuss any questions you have concerning this inspection.
Enclosures:
2.
Inspection Reports
No.
50-237/92020(DRP);
No.
50-249/92020(DRP)
cc w/enclosures:
D. Galle, Vice President, BWR
Operatioris
.
T. Kovach, Nuclear Licensing
Manager
C. Schroeder, Station Manager
R. Radtke, Regulatory Assurance
Supervisor *
DCD/DBC (RIDS)
OC/LFDCB .
Resident Inspectors, Dresden .
LaSalle, Quad Cities
R. Hubbard
J. Mccaffrey, Chief, Public
Utilities Division
R. Newmann, Office of Public
Counsel, State of Illinois Center
Licensing Project Manager, .NRR
State Liaison Officer
.R. DeFayette, Riii
Sincerely,
((.J. C44---.
Brent Clayton, Chief
Reactor Projects Branch 1