Forwards Insp Repts 50-237/92-02 & 50-249/92-02 on 920113- 0302 & Notice of Violation.One non-cited Violation Also Noted During Insp
ML17177A319
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 03/12/1992
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML17177A320 List:
References
NUDOCS 9203240026
Download: ML17177A319 (2)


See also: IR 05000237/1992002

Text

. \\

UNITED StATES

NUCLEAR. REGULATORY COMMtSSION

Docket No. 50-237 .

Docket No.

50~249

. License No. DPR-19; DPR-25.

Commonwealth Edison.Company

ATTN: . Hr. Corde.11 Reed *

Senior Vic~ President*

Opus West II I

14000pus Place

Downer~ Grove, IL .60515

Dear Mr. Reed: *

. REGION Ill

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINOIS 60137

. MAR 12 1992

This refers to the inspection conducted by W. Rogers, M. Peck, H. Miller,

P. Lougheed, P. Rescheske, K. Shembarger, J. Schapker and D. Liao of this

office, and assisted by R. Zuffa of the Illinois Department of Nuclear Safety

on January 13 through March 2, 1992. *.The inspection included a review of

authorized. activities for your Dresden Nuclear Power Station.* At the*

conclusion of the insp~ition, the finding~ were discussed with those members

  • of you.r staff identified in the en_closed report.

Areas examined duririg the inspection ~re jdentified in the report. Within. *

  • these areas, the inspection consisted of a selecti~e examination of procedures

and representative *records, observations; and :interviews with personnel .

. Based on the restilts of *this inspection, certain of ~our ~ciivities were i~.

violation of NRC requirementsi as ~pecified in the enclosed Notice of

Violation (Notice)~ You are required to respond to this letter and should

follow the instructions specified in the enclosed Notice when preparing your

. response.

In your response, you should document the specific actions taken

and any additional actions you plan to prevent recurrence. After reviewing.

your response to this Notice, including* you~ proposed corrective actions and

the results of future inspections, the NRC will determine whether further NRc*

enforcement act i'on is necessary to ensure comp l 1ance with NRC Regulatory

requirements. *

Also, during this inspection, one other activity was in violation of NRC .

requirements. However; as described in the enclosed inspection report~ you

identified this violation, and to ~ncourage and support licen~ee initiatives

for self-identific~tion ahd correction of violations, the ~iolation is no~

being cited because the criteria specified in Section V.G. of the 0 General

Statement of Policy and Procedure for NRC Enforcement Action," (Enforcement*

  • Pol icy, 10 CFR Part *2, Appendix. C (1991), were satisfied). *

9203240026 920312

PDR

ADOCK 05000237

G .

PDR. **

. The responses directed by this letter and the accompanying Notice are not

.

subject to the clearance procedure~ of the Office of Management and Budget as *

  • . required by the Paperwork Reduction Act of 1980, PL 96"'.511.
  • We will gladly discuss any questions you have concerning this irispection.

Enclosure:

1. Notic~ of Violation

2. Inspection Reports

50-237/92002(0RP); and

50-249/92002(0RP)

cc w/enclosure:

. O. Galle, Vice President - BWR

Operaiions

.

. T. Kovach, Nuclear

. .

. Licensing Manager

  • *C. Schroeder, Station Manager

OCD/DCB (RIDS)

OC/LFOCB

Resident Inspectors LaSalle,

Dresden, Quad Cities

Richard Hubbard

J. W. Mccaffrey, Chief, Public

    • Utilities Division *

Robert Newmann, Office of Public

  • .

Counsel, State of 1111 noi s Center

  • Licensin~ Prriject Manager, NRR

C. J. Paperiello, Riii

J. Lieberman, OE

J. Partlow, NRR

J. Goldberg, OGC

.

'

.

~}:;}~*

.* Edward G. Greenman, Di rector,

Oivi~ion of Reactor Projects