Arr Ac/I M&IVT..3 250 V_DC ELECTRTCJ\\L SYSTEM DOP 6900-1 Re.vision* 3 July 1979 The purpose of this procedure is to outline the u*ethod. used to.
pl:tce 'the battery,J1.1i-gcr i.n sci-vice, operate it norrn:1lly, trans-ferr:i.ng to an alternate poh*er source,.:ind rc*rnov.ing the battet*y chn.q;er from ~;*~rvi.ce *an the 250 VDC electrical system.
B.
REFERF:Ncr:s
- 1.
- . None.
- 1.
None.
D..
PRECAUTIONS
- 1.
None.
E.
. LIMITATIONS AND ACTIONS
- 1.
From and after the date that one of the two 125/250 VDC battery systems is made or found to be inoperabl~ for any reason, continued reactor operation is permissible only during the succeedi.ng seven days unless such battery system is ~ooner made operable.
F.
PROCEDURE
- 1.
Placing Charger in Service.
- a.
CLOSE the charger 480-V suppli breaker (MCC 28-2 fo~
2 charger, MCC 29-2 or 39-2 for 2/3 charger, ~nd MCC.
38-2 for 3 charger).
- b.
The supplies for the 2/3 charger are key interlocked
- so that only one may be closed.
- c.
CLOSE the a-c breaker at the charger. cabinet.
- d.
CLOSE the d-c breaker at the charger cabinet.
- e.
CLOSE the d-c breaker CHARGER to BATTERY BUS 2(3) at 250 VDC turbine building MCC 2(3).
- 2.
Nonnal. operation.
- 3.
- :a~::_;.;_<;rite charger control will be in.FLOAT.
Verify t_hat
- ~~ttery ~oltage is being maintained, and the charger is at 260.4 volts.
.-APPROVED SEPl 1 '79 1
nnc.D
. a*
- b.
Equalizing battery
- DOP 6900-1 Revision 3 (1)
Verify tfiat the eleetrolyte levels in the cells_
are between the low level 3nd hieh level marker~.
Fill with water if low.
Avoid spilling ~ater
. o.n top of cells.
If any is_ spilled, wipe it dry.to avoid shurti.ng cells.
(2)
Turn dial on battery chareer to 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> equalize.
Repeat St1?p 6 two adMti1)nal tir.1es.
The charger should re<Id 270.0 volts during the equalize charge.
(3)
- Battery is to be equalized for at lc;ist 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
(4)
Giv~ the time of $tart of cqu3lizing charge to the Shift Engineer so he can record it and passA. pp. ROVE it on to the following ~hifts.
~
(5)
Verify periodically' the electrolyte levels.
SEP 11 '79 (6)
After appro~imately 23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br /> of charging ti.me,
- D.O.S.R.
turn the timer dial up again to 24 hot.lrs.
(7)
After approximately 69 hours7.986111e-4 days <br />0.0192 hours <br />1.140873e-4 weeks <br />2.62545e-5 months <br />. of chargirig time turn dial up to at least 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.
(8). When cha_rging current has tapered and stabilized.*
(no further ieduction for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />), continue charging until there is no further increase in_
the lowest cell voltage.
Perform this by doing:
the following at t~e end of the 66th, 67th, 6~th; 69th, 70th, 7lst and.72nd hours:
(a)
With a voltmeter, find the lowest cell v6ltage-and record on attachment A.
(b)
Read the charging current off the battery
- charger_ and record on attachment A.
(9)
If no changes in the readings are noted, terminate equalization.
If there is a change, continue steps. i~ (6) until no chang~ is found.
(a)
Terminate equalizing by turning equalizer timer dial to zero.
Place the.charger in the.EQUALIZE mode for the condit;ions listed below.
- 1;i:.
(1)
(2)
The temperature corrected specific gravity of any R~11 is less than 1.205.
(10 points below full charge value).
When any.cell has a voltage less than 2.13 voi'ts~
~olts below nominal voltage of 2.17 volts).
(.04 (3)
When the battery has received an emergency discharge lasting 15 minutes or more.
2
(4)
Before a battery discharge test
- nor 6900,...1 Revision 3*
(5)
Monthly, r.~gar<lless of.the conditions 011tlim~d ;11:11we.
- c.
Observe nonr..11 bus *voltage 1luring operilti.on.
- 4.
- .Transfer 250 VDC *reactor buildi.ng MCC to alternate source.
- a.
OPEN the reactor huildi.ng ~iCC fcc<l brL'<.1ker. from th!:! cipposite nni*
turbine bui. lding :-tCC :rnd tag it OUT-OF--SEi\\VICE.
- b.
Verify that the rr;Ktor building MCC frcd brl!<lker from the respective u11it turbine building MCC is* open, and tag it OUT-OF-SERVICE *.
- c.
Remove the copper links from their present location*
and insert them in the altern;ite feed location.
- d.
Clear the OUT-OF-SERVICE cards and CLOSE, the reactor building MCC feed b~eaker from the respective turbine building Mee.
- 5.
Removing a charger from service.
- a.
Verify that another* charger is connected to the ba~tery bus.
. b.
. OPEN the CHARGER TO BATTERY BUS breaker at the 250. *.
VDC turbine building MCC 2(3).
- c.
OPEN the charger d-c breaker.
d~
OPEN the charger a-c breaker.
- e.
OPEN the charger supply breaker at the 480 volt r.iOt'ot control center.
(MCC 28-2 Unit 2, MCC 38-2 Unit 39
- f.
Rack out the breaker and place cards as required.
G.
CHECKLISTS
- 1.
Checklist A.
H.
TECHNICAL SPECIFICATION REFERENCES
. 1.
Section 3.9.
2~
Section 4.9.
.APPROVED SEPl 1 '79 D.O.S.R.
3
CHECKLIST A uur> li;J00-1 Revision 3
- . *:,i~~=; ~\\~J=~~:~~~~r:Cll,:R:~~j-~R~:=
67
*------.--------*~ **--------*--**------*-*--**---
68 69
. -- ----*-------- *--,----*------------------1--------------------
.,__ 70 71 72 Unit ---------,--------
Battery ___________ --'--____
Operator __________ __;_
- Z. ( f i na 1)
APPROVED
&Pl 179 D.0.S.R.
I.