Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-237/79-25 & 50-249/79-23.Addl Info Requested
ML17174A320
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 12/28/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML17174A321 List:
References
NUDOCS 8001100503
Download: ML17174A320 (1)


See also: IR 05000237/1979025

Text

i

~*

  • Docket No. 50-237

Docket No. 50-249

Commonwealth Edison Company

ATTM:

Hr. Cordell aeed

Vice Preaident

~.

Poat Office Box 767

Chicago, IL

60690

Gentlemen:

e

CENTR~l Ff.t,BI*

DEC 2 8 1979

This is in response to your letter dated December 7, 1979 regarding the

  • Dreaden Inspection i.eporta 237/79-25 and 249/79-23 that dealt with the

eeepage from the cooling lake. Al discussed with Hr. i. * .Janecek of your

office, the response is not coaplete in that Item 3 of the NRC letter

dated Rovember 16, 1979 bas not been fully addreaaed.

Please aubmit to

this office within 20 days your response to this Item.

With regard to your requeat for an extension for Item 2, please provide

us vi.th the 4ate you plan to *ubm.it your response to this off ice.

In addition to the above ve request you provide ua with a copy of the

HARZA Engineering report referenced in response to Item 1 which concluded

the north dike to be atable.

Your cooperation with us is appreciated.

cc: Hr. D. L. Peoplea 11 Director

of iuclear Licenaing

Mr. B. 1. Stephenson.

Station Superintendent

cc v/ltr dtd 12/7/79:

Central Files

&eproductiou Unit HRC 20b

PDR

Local PDB.

ISIC

  • NRC Form 31BA (Rm.I (5*76) NRCM 02040

Sincerely 11

Gaston Fiorelli, Chief

i.eactor Construction and

Engineering Support Branch

U. S, GOVERNMENT PRWT).~ OJ_FICEo* 1979*289*125

-

.

.

.