NRR-PMDAPEm Resource From: Mahoney, Michael Sent: Thursday, June 15, 2017 3:12 PM To: 'dustin.yang@duke-energy.com' Cc: Carrie Wilson; Cecil Fletcher

Subject:

Catawba Nuclear Station, Units. 1 and 2 - Acceptance of Requested Licensing Action Re: Relief Request 17-CN-001, Limited Volumetric Examinations for the Third Ten-Year Inservice Inspection Plan (CAC Nos. MF9807-8)

Dustin, By letter dated May 25, 2017, Duke Energy submitted a relief request (RR) 17-CN-001 for the Catawba Nuclear Station, Units 1 and 2. RR 17-CN-001 request relief from certain requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI associated with Category B-J pressure retaining welds in piping for branch pipe connection welds of nominal pipe size 4 inches or larger.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 130 hours5.417 days <br />0.774 weeks <br />0.178 months <br /> to complete. The NRC staff expects to complete this review in approximately 11 months, which is May, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, or unanticipated addition of scope to the review.

If you have any questions, please contact me.

Thanks Mike Michael Mahoney McGuire and Catawba Project Manager, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Desk: (301)-415-3867 1

Email: Michael.Mahoney@NRC.GOV 2

Hearing Identifier: NRR_PMDA Email Number: 3570 Mail Envelope Properties (9740db56dd7b4b9b8a6f9ba5060ca17c)

Subject:

Catawba Nuclear Station, Units. 1 and 2 - Acceptance of Requested Licensing Action Re: Relief Request 17-CN-001, Limited Volumetric Examinations for the Third Ten-Year Inservice Inspection Plan (CAC Nos. MF9807-8)

Sent Date: 6/15/2017 3:12:00 PM Received Date: 6/15/2017 3:12:01 PM From: Mahoney, Michael Created By: Michael.Mahoney@nrc.gov Recipients:

"Carrie Wilson" <Carrie.Wilson@duke-energy.com>

Tracking Status: None "Cecil Fletcher " <Cecil.Fletcher@duke-energy.com>

Tracking Status: None

"'dustin.yang@duke-energy.com'" <dustin.yang@duke-energy.com>

Tracking Status: None Post Office: R4PWMSMRS03.nrc.gov Files Size Date & Time MESSAGE 2843 6/15/2017 3:12:01 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: