ML17164A777
| ML17164A777 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 09/04/1998 |
| From: | Ruland W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Byram R PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17164A778 | List: |
| References | |
| 50-387-98-09, 50-387-98-9, 50-388-98-09, 50-388-98-9, NUDOCS 9809140221 | |
| Download: ML17164A777 (6) | |
See also: IR 05000387/1998009
Text
CATEGORY.2
I
REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)
t
ACCESSION NBR:9809140221
DOC.DATE: 98/09/04
NOTARIZED: NO
FACIL:50-387 Susquehanna
Steam Electric Station, Unit 1, Pennsylva
50-388
Susquehanna
Steam Electric Station, Unit 2, Pennsylva
AUTH.NAME
AUTHOR AFFXL1ATION
RULAND,W.H.
Region
1 (Post
820201)
RECIP . NAME
RECIPXENT AFFXLIATION
BYRAM,R.G.
Power
&, Light Co.
DOCKET
05000387
05000388
SUBJECT:
Forwards insp repts
50-387/98-09
& 50-388/98-09
on 980729-
0807.Eight apparent violations identified
& being considered
for enforcement action. Deficiencies
found in fire protection
brigade'embers.
DISTRIBUTION CODE: IEOIF
COPIES
RECEIVED:LTRj
ENCL J
SIZE:
C'3
7 /Q
TXTLE: General
(50 Dkt)-Xnsp Rept/Notice of Violation Response
E
NOTES:
05000387G
RECXPXENT
ID CODE/NAME
PD1-2
INTERNAL: ACRS
AEOD/TTC
DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS2
TERNAL: LITCO BRYCE,J H
NRC PDR
NOTES:
COPIES
LTTR ENCL
1
.
1
2
2
1
1
1
1
1
1
1
1'
1
1
1
1
1
RECIPIENT
ID CODE/NAME
NERSES,V
AEOD/SPD/RAB
DEDRO
NRR/DRCH/HOHB
NRR/DRPM/PERB
OE DIR
RGN1
FXLE
01
NOAC
NUDOCS FULLTEXT
COPIES
LTTR ENCL
1
1
> .)Q
C
l.OAQEO PBOE
ELE~Omc RUB
E
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE-HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
September
4,
1998
Mr. Robert G.
Byram
Senior Vice President - Generation
and Chief nuclear Officer
Pennsylvania power and Light Company
2 North Ninth Street
Allentown, PA 18101
SUBJECT:
NRC SPECIAL INSPECTION REPORT NOS. 50-387 and 50-388/98-09
Dear Mr Byram:
This refers to the inspection conducted on July 29 - 31, 1998, at the Susquehanna
Steam
Electric Station.
The purpose of the inspection was to review the results of the Fire protection
Functional Inspection, and your response to the issues raised therein, dated July 20, 1998.
The enclosed report presents the results of this inspection.
The results of the inspection were discussed
in a telephone conference on August 7, 1998.
The additional information your staff provided at that time has been taken into consideration
during our deliberations.
Based on the results of this inspection, eight apparent violations were identified and are being
considered for enforcement action in accordance with the "General Statement of Policy and
Procedure for NRC Enforcement Actions" (Enforcement Policy), NUREG-1600. We have found
deficiencies
in your fire protection program relating to control of combustible materials,
physical examinations for fire brigade members, availability of piping system keepfill in the
post-fire environment,
ability of your safe shutdown methodology to achieve the safe
shutdown goals described
in Appendix R to 10CFR50, design and installation of the fire
detection and suppression systems at the site, and emergency lighting provided to perform
post-fire shutdown actions.
We note that your positions with regard to these matters are
delineated in your letter of July 20, 1998.
In addition, please
be advised that the number and characterization of apparent violations
described
in the enclosed inspection report may change
as a result of further NRC review.
You will be advised by separate
correspondence
of the results of our deliberations on this
matter.
e
980914022i
980904
ADOCK 05000387
8
R. Byram
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its
enclosure willbe placed in the NRC Public Document Room (PDR).
Sincerely,
ORIGINAL SIGNED BY:
William H. Ruland, Chief
Electrical Engineering Branch
Division of Reactor Safety
Docket No. 50-387, 50-388
Enclosure:
Inspection Report 60-387 and 60-388/98-09
cc w/encl:
R. F. Saunders,
Vice President - Site Operations
G. T. Jones, Vice President - Engineering and Support
G. Kuczynski, General Manager - SSES
J. M. Kenny, Supervisor, Nuclear Licensing
G. D. Miller, General Manager - Nuclear Engineering
R. R. Wehry, Nuclear Licensing
F. P. Ar'cury, Nuclear Services Manager, General Electric
C. D. Lopes, Manager - Nuclear Security
A. Male, Manager, Nuclear Assessment
Services
H. D. Woodeshick, Special Assistant to the President
J. C. Tilton, III, Allegheny Electric Cooperative, Inc.
Commonwealth of Pennsylvania
i
R. Byram
Region I Docket Room (with concurrences)
Nuclear Safety Information Center (NSIC)
H. Miller, RA/W. Axelson, DRA (1)
C. Anderson, DRP
D. Florek, DRP
R. Junod, DRP
R. Fuhrmeister, DRS
W. Ruland, DRS
NRC Resident Inspector
PUBLIC
C. Miskey, DRS
.It III
B. McCabe, OEDO
V. Nerses, Project Manager, NRR
D. Brinkman, NRR
Inspection Program Branch, NRR (IPAS)
R. Correia, NRR
F. Talbot, NRR
M. Campion, ORA
D. Screnci, PAO
DOCDESK
DOCUMENT NAME: GAEEBiFUHRMEISiSSES9809.INS
To recehre a copy of this document, Indicate In the box:
C
~ Copy without attachment/enclosure
E
~ Copy with attachment/enclosure
"N'
No
copy
OFFICE
RI/DRS
NAME
RFuhrmeister
DATE
09/03/98
RI/DRS
RI/DRP
CAnderson
09/cj/98
WRuland
09/
/98
OFFICIAL RE
ORD COPY
09/
/98
09/
/98