Mr. Robert G.
Byram Senior Vice President-Nuclear Pennsylvania Power and Light Company North Ninth Street Allentown, PA 18101
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1
AND 2, INTERIM RESPONSE TO GENERIC LETTER 94-03, "INTERGRANULAR STRESS CORROSION CRACKING OF CORE SHROUDS IN BWRS" (TAC NOS.
M90112 AND M90113)
Dear Mr. Byram:
By letter dated December 19,
- 1994, Pennsylvania Power and Light Company (PP&L) provided an interim response to Generic Letter (GL) 94-03 outlining the core shroud inspection scope and schedule for Susquehanna Steam Electric Station (SSES) Unit l.
In that submittal you indicated that the inspections to be conducted at the unit will be in accordance with BWR Owners Group guidance for Category B plants.
Specifically, welds H-3, H-4, H-5, H-6A, and H-7 will be inspected during the outage which began in March.
In discussions with NRR staff, PP8L licensing and technical staff indicated that these inspections will be ultrasonic testing examinations using the GE LD Tracker apparatus.
In addition, your staff stated that welds H-8 and H-9 will be visually inspected and that other internal examinations will include visual inspection of manway covers, and inspections of jet pump hold down beams, the guide and the core support plate.
In addition to the 30-day report on the results of the core shroud inspection, your staff indicated that it would provide a brief summary report on the results of the other internal examinations conducted during the outage.
Based on the information provided in the submittal referenced above and the information discussed with the staff, the staff finds your core shroud inspection plan for SSES Unit 1 to be acceptable.
Sincerely, Docket Nos.
50-387/388 cc:
See next page DISTRIBUTION Chester
- Poslusny, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket File PUBLIC PDI-2 Reading SVarga JZwolinski JStolz CPoslusny MO'Brien OGC JStrosnider JMedoff ACRS(4)
- JWhite, RGN-I Jl ~ /
g
<<MUVP
'e B
OFFICE PD -2 LA PDI PM I-2 D EMC HP/lg g~i /pe ',J,'ip/'=
9504140163 950410 PDR ADQCK 05000387 P
PDR'AME DATE MO Br en CPoslusn
- rb
/5 /95
/
/95 rosnider P/
/9~
JMe
/
/95 J
o z
/ 0/95 OFFICIAL RECORD COPY DOCUMENT NAME:
SU94-03.GEN
~gag REG(p(
~Cr Wp.0 0
IV)
,u
~O
+)t*w+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 10, 1995 Hr. Robert G.
Byram Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, PA 18101
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1
AND 2, INTERIM RESPONSE TO GENERIC LETTER 94-03, "INTERGRANULAR STRESS CORROSION CRACKING OF CORE SHROUDS IN BWRS" (TAC NOS.
H90112 AND H90113)
Dear Hr. Byram:
By letter dated December 19,
- 1994, Pennsylvania Power and Light Company (PPBL) provided an interim response to Generic Letter (GL) 94-03 outlining the core shroud inspection scope and schedule for Susquehanna Steam Electric Station (SSES) Unit 1.
In that submittal you indicated that the inspections to be conducted at the unit will be in accordance with BWR Owners Group guidance for Category B plants.
Specifically, welds H-3, H-4, H-5, H-6A, and H-7 will be-inspected during the outage which began in March.
In discussions with NRR staff, PPEL licensing and technical staff indicated that these inspections will be ultrasonic testing examinations using the GE LD Tracker apparatus.
In addition, your staff stated that welds H-8 and H-9 will be visually inspected and that other internal examinations will include visual inspection of manway covers, and inspections of jet pump hold down beams, the guide and the core support plate.
In a'ddition to the 30-day report on the results of the core shroud inspection, your staff indicated that it would provide a brief summary report on the results of the other internal examinations conducted during the outage.
Based on the information provided in the submittal referenced above and the information discussed with the staff, the staff finds your core shroud inspection plan for SSES Unit 1 to be acceptable.
Sincerely, Docket Nos. 50-387/388 cc:
See next page Q.~ W Chester
- Poslusny, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
'Mr~ Robert G.
Byram Pennsylvania Power L Light Company Susquehanna Steam Electric Station, Units 1 5 2
CC:
Jay Silberg, Esq.
- Shaw, Pittman, Potts 5 Trowbridge 2300 N Street N.W.
Washington, D.C.
20037 Bryan A. Snapp, Esq.
Assistant Corporate Counsel Pennsylvania Power 8 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. J.
M. Kenny Licensing Group Supervisor Pennsylvania Power 5 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mrs. Maitri Banerjee Senior Resident Inspector U. S. Nuclear Regulatory Commission P.O.
Box 35 Berwick, Pennsylvania 18603-0035 Mr. William P. Dornsife, Director Bureau of Radiation Protection Pennsylvania Department of Environmental Resources P. 0.
Box 8469 Harrisburg, Pennsylvania 17105-8469 Mr. Jesse C. Tilton, III Allegheny Elec. Cooperative, Inc.
212 Locust Street P.O.
Box 1266 Harrisburg, Pennsylvania 17108-1266 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. Harold G. Stanley Vice President-Nuclear Operations Susquehanna Steam Electric Station Pennsylvania Power and Light Company Box 467 Berwick, Pennsylvania 18603 Mr. Herbert D. Woodeshick Special Office of the President Pennsylvania Power and Light Company Rural Route 1,
Box 1797 Berwick, Pennsylvania 18603 George T. Jones Vice President-Nuclear Engineering Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Chairman Board of Supervisors 738 East Third Street
- Berwick, PA 18603