ML17164A150
From kanterella
Jump to navigation
Jump to search
ML17164A150 | |
Person / Time | |
---|---|
Site: | Ginna |
Issue date: | 05/31/2017 |
From: | Exelon Generation Co |
To: | Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
Shared Package | |
ML17164A149 | List: |
References | |
NMP1L3158 | |
Download: ML17164A150 (12) | |
Similar Documents at Ginna | |
---|---|
Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24103A2042024-04-12012 April 2024
[Table view]Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML22234A1692022-08-22022 August 2022 R. E. Ginna Nuclear Power Plant, Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) RS-22-086, R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam.2022-08-10010 August 2022 R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam. ML22124A3162022-05-27027 May 2022 Summary of Combined Regulatory Audit in Support of Risk Informed Completion Times in Technical Specifications LAR and to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power ML22108A2482022-04-18018 April 2022 R.E.. Ginna Nuclear Power Plant - License Amendment Request to Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML22052A0132022-02-21021 February 2022 Application to Revise R. E. Ginna Technical Specification 3.1.8, Physics Tests Exception - Mode 2 RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments ML21287A0062021-10-14014 October 2021 Supplemental Information No.1 for R.E. Ginna Nuclear Power Plant to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, - Risk-Informed Categorization and Treatment of Structu JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21140A3242021-05-20020 May 2021 R. E. Ginna Nuclear Power Plant - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML21141A0092021-05-20020 May 2021 R. E. Ginna Nuclear Power Plant - Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments ML20056E9582020-02-25025 February 2020 R. E. Ginna Nuclear Power Plant, License Amendment Request to Add a One-Time Note for Use of Alternate Residual Heat Removal Methods RS-20-002, Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSl-191 Issues2020-02-0606 February 2020 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSl-191 Issues RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19045A2822019-02-15015 February 2019 R. E. Ginna Nuclear Power Plant - License Amendment Request (LAR) to Revise Technical Specification (TS) 5.5.15, Containment Leakage Rate Testing Program, for Permanent Extension of Type a Leak Rate Test Frequencies ML18158A1292018-06-0505 June 2018 License Amendment Request: Revised Commitment Associated with Implementation of NFPA 805, 2001 Edition RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)2018-03-0101 March 2018 Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) ML17321A1072017-11-16016 November 2017 R. E. Ginna, License Amendment Request to Revise Technical Specifications for Selected Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation Channels to Incorporate Bypass Test Capability ML17304A9842017-10-31031 October 2017 R. E. Ginna Nuclear Power Plant - License Amendment Request to Revise Technical Specifications Surveillance Requirement SR 3.8.4.3, DC Sources - Modes 1, 2, 3, and 4, to Allow for a Modified Performance Discharge Test ML17186A2332017-06-30030 June 2017 License Amendment Request - Revised Commitment Associated with Implementation of NFPA 805, 2001 Edition ML17164A1482017-05-31031 May 2017 Enclosure 3C - EAL Basis Document for R.E. Ginna Nuclear Power Station ML17164A1502017-05-31031 May 2017 Enclosure 3D - EAL Front Matter for R.E. Ginna Nuclear Power Station ML17164A1512017-05-31031 May 2017 Enclosure 3E - Procedure Matrix for R.E. Ginna Nuclear Power Station ML17164A1472017-05-31031 May 2017 Enclosure 3B - EAL Red-Line Basis Document for R.E. Ginna Nuclear Power Station RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process2017-03-28028 March 2017 Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process ML16280A4022016-10-0606 October 2016 License Amendment Request - Supplement Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. ML16236A3002016-08-22022 August 2016 License Amendment Request and 10 CFR 50.12 Exemption Request for the Use of Optimized Zirlo Fuel Rod Cladding ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. ML16168A2612016-06-16016 June 2016 Supplement No. 2 to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Rev. 3).... ML16035A0152016-02-0404 February 2016 Application to Revise Technical Specifications to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. ML15210A3142015-07-29029 July 2015 License Amendment Request to Revise the Emergency Plan Requalification Training Frequency for Emergency Response Organization Personnel ML15166A0752015-06-0404 June 2015 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) RA-14-057, License Amendment Request Regarding the Cyber Security Plan Implementation Schedule for Milestone 82014-08-29029 August 2014 License Amendment Request Regarding the Cyber Security Plan Implementation Schedule for Milestone 8 ML13228A2652013-08-14014 August 2013 Independent Spent Fuel Storage Installations Application for Preemption Authority Pursuant to Section 161A of the Atomic Energy Act & License Amendment Request ML13232A1562013-08-0606 August 2013 ISFSI, Nine Mile Point, Units 1, 2 and ISFSI and R.E. Ginna, and ISFSI, Application for Order Approving Transfer of Operating Authority and Conforming License Amendments. Part 1 of 2 ML13093A0642013-03-28028 March 2013 License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) ML11138A1592011-05-12012 May 2011 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 & 2, R.E. Ginna, Application for Approval of Indirect Transfer of Control of Licenses ML1020404732010-07-16016 July 2010 R. E. Ginna - Request for Approval of the Constellation Energy Nuclear Group Cyber Security Plan ML0926800602009-09-18018 September 2009 R. E. Ginna - License Amendment Request: Administrative Revision of Inservice Test Program Technical Specification ML0920905382009-07-23023 July 2009 R. E. Ginna - License Amendment Request: Improvement to the Definition of Operations Involving Positive Reactivity Changes (TSTF-286) ML0908901912009-03-23023 March 2009 R. E. Ginna - License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions for TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0906304262009-02-26026 February 2009 R. E. Ginna and Calvert Cliffs, Units 1 & 2 and Independent Spent Fuel Storage Installation - Supplement to Application for an Order Approving License Transfers and Conforming License Amendment Request ML0835308062009-02-23023 February 2009 R. E. Ginna Nuclear Power Plant - Amendment Re Revised Methodology for Determining Reactor Coolant System Pressure and Temperature and Low Temperature Over-Pressure Limits ML0903302752009-01-22022 January 2009 R. E. Ginna - Amendment to Application to Revise Technical Specification Limiting Conditions of Operation (Lcos) 3.3.2, 3.3.4, and 3.8.1 2024-04-12 Category:Emergency Preparedness-Emergency Plan MONTHYEARRS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024
[Table view]Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML22215A0032022-08-0303 August 2022 R. E. Ginna Nuclear Power Station - Nuclear Radiological Emergency Plan Document Revision. Includes EP-AA-1012, Addendum 3, Appendix 1, Revision 2, R.E. Ginna EAL Wallboard ML19017A1362019-01-15015 January 2019 License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements ML18117A0102018-04-19019 April 2018 Attachment 1 - 10 CFR 50.54(q)(5) Change Summary Analysis ML18065A2042018-03-0606 March 2018 Co., Emergency Plan Revision Summary Analysis and Revision 29 to EP-AA-1000, Exelon Nuclear Standardized Radiological Emergency Plan. ML17164A1472017-05-31031 May 2017 Enclosure 3B - EAL Red-Line Basis Document for R.E. Ginna Nuclear Power Station ML17164A1512017-05-31031 May 2017 Enclosure 3E - Procedure Matrix for R.E. Ginna Nuclear Power Station ML17164A1502017-05-31031 May 2017 Enclosure 3D - EAL Front Matter for R.E. Ginna Nuclear Power Station ML17164A1482017-05-31031 May 2017 Enclosure 3C - EAL Basis Document for R.E. Ginna Nuclear Power Station ML15309A1312015-11-0404 November 2015 Supplemental Response for License Amendment Request to Revise the Emergency Plan Requalification Training Frequency for Emergency Response Organization Personnel ML15210A3142015-07-29029 July 2015 License Amendment Request to Revise the Emergency Plan Requalification Training Frequency for Emergency Response Organization Personnel ML15205A3182015-07-16016 July 2015 ERDS Data Point Library Update - R.E. Ginna Nuclear Power Plant ML15012A4602015-01-0505 January 2015 Revised Nuclear Emergency Response Plan ML0933702152009-11-30030 November 2009 R. E. Ginna Nuclear Power Plant - License Amendment Request: Proposed Changes to the Emergency Plan ML0532604802005-11-0101 November 2005 Enclosure H, Pages 45-50 of the Ginna Station Emergency Plan, Appendix G, Analysis of Evacuation Travel Times, of the Ginna Station Emergency Plan, and Ginna Station Discretionary Actions for Emergency Conditions, Effective April 28, 2005 ML0513000402005-04-28028 April 2005 R. E. Ginna Nuclear Power Plant, Emergency Response Plan, Revision 24 2024-07-12 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML17164A150&oldid=660214"