Forwards Insp Repts 50-387/97-09 & 50-388/97-09 on 971021-1208 & Nov.Violation Concerns Adequacy of Procedures Used to Control Maint on RCS Valve Bonnet Veny Line
ML17159A116
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/31/1997
From: Anderson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17159A117 List:
References
50-387-97-09, 50-387-97-9, 50-388-97-09, 50-388-97-9, NUDOCS 9801140382
Download: ML17159A116 (4)


See also: IR 05000387/1997009

Text

MLLE NA'VW1.

Cs

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9801140382

DOC.DATE: 97/12/31

NOTARIZED: NO

DOCKET

FACIL:50-387 Susquehanna

Steam Electric Station, Unit 1, Pennsylva

05000387

~

~

50-388

Susquehanna

Steam Electric Station, Unit 2, Pennsylva

05000388

AUTH.NAME

AUTHOR AFFILIATION

ANDERSON,C.J.

Region

1 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

BYRAM,R.G.

Pennsylvania

Power

& Light Co.

SUBJECT: Forwards insp repts

50-387/97-09

R 50-388/97-09

on

971021-1208

Ec NOV.Violation concerns

adequacy of procedures

used to control maint on

RCS valve bonnet veny line.

DISTRIBUTION CODE: IEOIF

COPIES

RECEIVED: LTR

( ENCL

(

SIZE: 3

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

E

05000387(

RECIPIENT

ID CODE/NAME

PD1-2

PD

INTERNAL: ACRS

AEOD/TTC

ENTER

PECB

NUDOCS-ABSTRACT

OGC/HDS2

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

NERSES,V

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN1

FILE

01

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

'

1

1

TERNAL: LITCO BRYCE,J H

NRC PDR

NOTES:

1

1

1

1

NOAC

1

1

NUDOCS FULLTEXT

1

1

"g0>>gr-'g <BOFF

(Q~RC FLG, ~P~

NOTE TO ALL "RZDS" RECZP1ENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LZS.

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTR(

DESK

tDCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

December 31, 1997

Mr. Robert G. Byram

Senior Vice President - Nuclear

Pennsylvania Power 5 Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-387/97-09, 50-388/97-09 AND

NOTICE OF VIOLATION.

Dear Mr. Byram:

On December 8, 1997, the NRC completed

a routine resident inspection at your

Susquehanna

Steam Electric Station facility. The enclosed report presents the results of

that inspection.

In addition, this report contains the results of a physical security

inspection conducted by inspectors from the NRC Region

I office.

Your conduct of activities at the facility during this period was characterized

by safe

operation and generally conservative decision making. The physical security inspection

concluded that you have maintained an effective security program and that your provisions

for land vehicle control satisfy regulatory requirements and previous PPtkL commitments.

Several issues identified during this inspection regarding PP8cL's strategy for resolving

deficiencies with the containment isolation configuration for feedwater penetrations

are of

concern.

Although more information is required for the NRC to make conclusions regarding

potential enforcement actions, we believe these issues have not been adequately

communicated to the NRC or evaluated by PPSL for regulatory compliance.

Based on our

December 19, 1997, conference call with Mr. J. Kenny of PPRL, we understand that PP5L

willsubmit a letter in January 1998 to provide information regarding the deficiencies,

compliance with applicable design requirements,

and plans for corrective action.

This

information will be used to evaluate the unresolved items identified in the enclosed

inspection report, and to determine whether further NRC action is required.

I

ll[lllllllfllilllllljiff(g(f

(/ggf

>~'ased

on the other results of this inspection, the NRC has determined that one violation of

NRC requirements occurred.

This violation is cited in the enclosed Notice of Violation

(Notice), and the circumstances

surrounding the violation are described in detail in the

enclosed report.

The violation concerns the adequacy of procedures

used to control

maintenance

on a reactor coolant system valve's bonnet vent line. The procedures were

inadequate to ensure that the vent line was supported in accordance with its design

configuration and consequently

a vent line weld failed due to cyclic fatigue while in

service.

Please note that you are required to respond to this letter and should follow the

instructions specified in the enclosed Notice when preparing your response.

The NRC will

use your response,

in part, to determine whether further enforcement action is necessary

to ensure compliance with regulatory requirements.

PDR

ADQCK 050003

6

Mr. Robert G. Byram

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of this letter

and its enclosures will be placed in the NRC Public Document Room.

The responses

directed by this letter and the enclosed Notice are not subject to the clearance procedures

of the Office of Management and Budget as required by the Paperwork Reduction Act of

1980, Public Law No. 96.511.

Clifford J. Anderson, Chief

Projects Branch 4

Division of Reactor Projects

Docket Nos.: 50-387;50-388

License Nos:

NPF-14, NPF-22

Enclosures:

1

~ Inspection Report 50-387/97-09, 50-388/97-09

2. Notice of Violation

cc w/encl:

G. T. Jones, Vice President - Nuclear Operations

G. Kuczynski, General Manager

J. M. Kenny, Supervisor, Nuclear Licensing

G. D. Miller, General Manager - Nuclear Engineering

R. R. Wehry, Nuclear Licensing

M. M. Urioste, Nuclear Services Manager, General Electric

C. D. Lopes, Manager - Nuclear Security

A. Male, Manager, Nuclear Assessment

Services

H. D. Woodeshick, Special Assistant to the President

J. C. Tilton, III, Allegheny Electric Cooperative, Inc.

Commonwealth of Pennsylvania

Mr. Robert G. Byram

Distribution w/encl:

Region

I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

H. Miller, RA

P. Swetland, DRP

A. Linde, DRP

NRC Resident Inspector

PUBLIC

Distribution w/encl: (Via E-Mail)

W. Dean, OEDO

C. Poslusny, Project Manager, NRR

J. Stolz, PDI-2, NRR

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

F. Talbot, NRR

.

DOCDESK

DOCUMENT NAME: GABRANCH4iSUS9709.INS

To receive a copy of this document, indicate ln the box: "C" = Copy without attachment/enciosure

"E" -" Copy with attachment/enclosure

"N"= No

copy

OFFICE

RI/DRP

CAnderson

C &

DATE

12/31/97

12/

/97

12/

/97

12/

/97

12/

/97

OFFICIAL RECORD

COPY