Forwards Insp Repts 50-387/96-10 & 50-388/96-10 on 960910- 1021 & Notice of Violation
ML17158B858
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/12/1996
From: Pasciak W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17158B859 List:
References
NUDOCS 9611190016
Download: ML17158B858 (5)


See also: IR 05000387/1996010

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9611190016

DOC.DATE: 96/11/12

NOTARIZED: NO

FACIL:50-387 Susquehanna

Steam Electric Station, Unit 1, pennsylva

50-388

Susquehanna

Steam Electric Station, Unit 2, Pennsylva

AUTH.NAME

AUTHOR AFFILIATION

PASCIAK,W.J.

Region

1 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

BYRAMPR.G ~

Pennsylvania

Power

a Light Co.

DOCKET

g

05000387

05000388

T

05000387 E

NOTES

SUBJECT:

Forwards insp repts

50-387/96-10

& 50-388/96-10

on 960910-

1021

a notice of violation.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR g ENCL

~

SIZE: '0) 9 7

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

RECIPIENT

ID CODE/NAME

PD1-2

PD

INTERNAL: ACRS

AEOD/TgC

CE TER

NRR DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN1

FILE

01

RNAL: LITCO BRYCE,J

H

NRC PDR

NOTES:

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

POSLUSNY,C

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS2

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

2

D

E

N

NOTE TO ALL."RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

November 12,

1996

Mr. Robert G. Byram

Senior Vice President

- Nuclear

Pennsylvania

Power 5, Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

SUBJECT:

NRC INSPECTION REPORT 50-387/96-10, 50-388/96-10; AND

NOTICE OF VIOLATION

Dear Mr. Byram:

This refers to the inspection conducted from September

10 through October 21, 1996, at

the Susquehanna

Steam Electric Station

1 tk 2 reactor facilities. The purpose of the

inspection was to determine whether activities authorized by the license were conducted

safely, in accordance

with NRC requirements.

At the conclusion of the inspection, the

findings were discussed

with members of your staff.

During the six week period covered by this inspection, your staff's conduct of activities

was generally characterized

by safe operation and conservative

decision making.

Unit 1

refueling and post-outage

restart activities were well controlled and conducted

by

operations.

An exception to your good maintenance

practices was identified during control

rod drive replacements.

Unit 2 operations were performed well including response

to the

unexpected

closure of a turbine combined intercept valve.

In the area of plant support, we found that you continued to maintain an effective

radiological controls program.

This was evidenced

by your extensive planning and

effective implementation of radiological controls for outage work.

Based on the results of this inspection, the NRC has determined that violations of NRC

requirements occurred.

The violations are cited in the enclosed

Notice of Violation

(Notice), and the circumstances

surrounding them are described

in detail in the subject

inspection report.

One violation involved the partial disassembly

of the wrong control rod

drive assembly under the unit

1 reactor vessel. This violation is of concern because

it

should have been prevented

by your corrective action for weaknesses

in the control,rod

drive replacement activities identified by the NRC just prior to the event.

The error

constituted

a significant increase

in risk of draining the reactor vessel and/or having an

uncontrolled local reactivity addition.

Another violation involved multiple examples of the

failure to properly post and barricade high radiation areas in your units.

This violation is of

concern due to the repetitive nature of these events,

and the ineffectiveness of previous

corrective actions.

You are required to respond to this letter and should follow the instructions specified in the

enclosed

Notice when preparing your response.

In your response,

you should document

9biii900ib 96iii2

PDR

ADQCK 05000387

8

PDR

Mr. Robert G. Byram

t

2

the specific actions taken, and any additional actions you plan, to prevent recurrence.

The

NRC will use your response,

in part, to determine whether further enforcement action is

necessary

to ensure compliance with regulatory requirements.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter,

its enclosure(s),

and your response

will be placed in the NRC Public Document Room

(PDR). To the extent possible, your response

should not include any personal privacy,

proprietary, or safeguards

information so that it can be placed in the PDR without

redaction.

The responses

directed by this letter and the enclosed

Notice are not subject to the

clearance procedures

of the Office of Management

and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No. 96.511.

Sincerely,

ORIGINAL SIGNED. BY:

Walter J. Pasciak, Chief

Projects Branch 4

Division of Reactor Projects

Docket No. 50-387; 50-388

License No. NPF-14, NPF-22

Enclosures:

1.

Notice of Violation

2.

Inspection Report

Mr. Robert G. Byram

cc w/encl:

G. T. Jones,

Vice President - Nuclear Engineering

G. Kuczynski, Plant Manager

J. M. Kenny, Supervisor,

Nuclear Licensing

G. D. Miller, Manager - Nuclear Engineering

R. R. Wehry, Nuclear Licensing

M. M. Urioste, Nuclear Services Manager, General Electric

C. D. Lopes, Manager - Nuclear Security

W. Burchill, Manager, Nuclear Safety Assessment

H. D. Woodeshick, Special Office of the President

J. C. Tilton, III, Allegheny Electric Cooperative,

Inc.

Commonwealth of Pennsylvania

Mr. Robert G. Byram

Distribution w/encl:

Region

I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

K. Gallagher,

DRP

D. Screnci, PAO

NRC Resident Inspector

PUBLIC

Distribution w/encl: (Via E-Mail)

W. Dean, OEDO

C. Poslusny, Project Manager,

NRR

J. Stolz, PDI-2, NRR

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

R. Frahm, Jr., NRR

DOCUMENT NAME: ai96

O.sus

To receive a copy of this docu

t. i dicate in the box: "C" ~

py

ithout attachment/enclosure

6

~ Copy with attachment/enclosure

N

~ No copy

OFFICE

RI/D

NAME

PSw

a

RI/D

WPa

ci,

DATE

11/'

11

J96

R

P