MONTHYEARML17158B2952017-06-0707 June 2017 Relief Request RR-001 for Extension of the 4th 10-Year Lnservice Testing Interval Project stage: Request ML17170A1732017-06-15015 June 2017 NRR E-mail Capture - Acceptance Review: FitzPatrick Proposed Alternative -Relief RR-001 for Extension of the 4th, 10-Year Inservice Testing Interval. Project stage: Acceptance Review ML17201M2892017-08-0404 August 2017 Issuance of Relief Request No. RR-001 - Alternative to Certain Requirements of the ASME Code for Extension of the Fourth 10-Year Inservice Testing Interval Project stage: Approval 2017-06-07
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000333/20230042024-02-0707 February 2024 Integrated Inspection Report 05000333/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200012/2023001 ML24037A0102024-02-0606 February 2024 Requalification Program Inspection ML24018A0012024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000333/2024010) and Request for Information ML24004A2302024-01-0808 January 2024 Project Manager Reassignment ML23356A0832024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0058 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines JAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications IR 05000333/20234012023-12-0808 December 2023 Cybersecurity Inspection Report 05000333/2023401 (Cover Letter Only) RS-23-126, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) JAFP-23-0069, Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements JAFP-23-0057, and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation JAFP-23-0064, Emergency Plan Document Revision2023-11-15015 November 2023 Emergency Plan Document Revision JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use IR 05000333/20230032023-11-13013 November 2023 Integrated Inspection Report 05000333/2023003 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000333/20230102023-10-26026 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000333/2023010 JAFP-23-0059, Registration of Spent Fuel Cask Use2023-10-24024 October 2023 Registration of Spent Fuel Cask Use IR 05000333/20233012023-10-19019 October 2023 Initial Operator Licensing Examination Report 05000333/2023301 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans JAFP-23-0050, Physical Security Plan, Revision 242023-08-31031 August 2023 Physical Security Plan, Revision 24 JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023 Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis IR 05000333/20230052023-08-31031 August 2023 Updated Inspection Plan for James A. FitzPatrick Nuclear Power Plant (Report 05000333/2023005) JAFP-23-0047, Correction to the 2022 Annual Radioactive Effluent Release Report2023-08-30030 August 2023 Correction to the 2022 Annual Radioactive Effluent Release Report ML23228A1342023-08-16016 August 2023 Licensed Operator Positive Fitness-For-Duty Test IR 05000333/20230022023-08-0707 August 2023 Integrated Inspection Report 05000333/2023002 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0043, 10 CFR 50.46 Annual Report2023-07-31031 July 2023 10 CFR 50.46 Annual Report JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2023-07-28028 July 2023 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance ML23208A1622023-07-27027 July 2023 Operator Licensing Examination Approval IR 05000333/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000333/2023402 IR 05000333/20230112023-07-25025 July 2023 Post-Approval Site Inspection for License Renewal - Phase 4 Inspection Report 05000333/2023011 IR 05000333/20235012023-07-20020 July 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000333/2023501 JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation2023-06-28028 June 2023 License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation IR 05000333/20234202023-06-26026 June 2023 Security Baseline Inspection Report 05000333 2023420 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23164A0322023-06-13013 June 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000333/2023010 ML23152A0042023-06-0101 June 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000333/2023401 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling JAFP-23-0025, 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Annual Radiological Environmental Operating Report IR 05000333/20230012023-05-0303 May 2023 Integrated Inspection Report 05000333/2023001 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI JAFP-23-0023, 2022 Annual Radioactive Effluent Release Report2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report IR 05000333/20230122023-04-13013 April 2023 Quadrennial Fire Protection Inspection Report 05000333/2023012 ML23095A3722023-04-0505 April 2023 2023 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations IR 05000333/20220042023-03-20020 March 2023 Integrated Inspection Report 05000333/2022004 JAFP-23-0010, 2022 REIRS Transmittal of NRC Form 52023-03-20020 March 2023 2022 REIRS Transmittal of NRC Form 5 ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 2024-02-07
[Table view] |
Text
Exelon Generation 200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com 10 CFR 50.55a June 7, 2017 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 James A. FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-59 NRC Docket No. 50-333
Subject:
Relief Request RR-001 for Extension of the 4th 10-Year lnservice Testing Interval Attached for your review is a relief request associated with the fourth ten-year lnservice Testing (IST) interval for the James A. FitzPatrick Nuclear Power Plant. The James A.
FitzPatrick Nuclear Power Plant (JAFNPP) currently complies with the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants, 2001 Edition through the OMb Code-2003 Addenda. The fourth interval began on October 1, 2007, and will currently conclude on September 30, 2017.
We request your approval by August 31, 2017.
There are no regulatory commitments contained within this letter.
If you have any questions concerning this letter, please contact Mr. Tom Loomis at (610) 765-5510.
Sincerely, David T. Gudger Manager - Licensing & Regulatory Affairs Exelon Generation Company, LLC
Attachment:
Extension of the Fourth 10-Year IST Interval cc: Regional Administrator, Region I, USNRC USNRC Senior Resident Inspector, JAFNPP Project Manager USNRC, JAFNPP A. L Peterson, NYSERDA
James A. FitzPatrick Nuclear Power Plant Relief Request No. RR-001 Extension of the Fourth 10-Year IST Interval Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)
-Code Requirements Present an Undue Hardship Without a Compensating Increase in the Level of Quality or Safety-(Page 1 of 4) 1.0 ASME CODE COMPONENTS AFFECTED:
Description:
Extension of Fourth 10-Year lnservice Test (IST) Interval Component Number: All IST Components 2.0 APPLICABLE CODE EDITION AND ADDENDA:
James A. FitzPatrick Nuclear Power Plant (JAFNPP) currently complies with the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance (OM) of Nuclear Power Plants, 2001 Edition through the OMb Code-2003 Addenda.
3.0 APPLICABLE CODE REQUIREMENT:
ISTA-3120, lnservice Test Interval, (c) states, in part, that "The inservice test intervals shall comply with the following, except as modified by ISTA-3120(d) and ISTA-3120(e): ...
(2) Successive Test Intervals: 1O years following the previous test interval."
4.0 REASON FOR REQUEST:
Pursuant to 10CFR50.55a(z)(2), an alternative is proposed to the 10-year interval requirements contained within ISTA-3120(c)(2) for the fourth 10-year JAFNPP IST interval on the basis that the Code requirements present an undue hardship without a compensating increase in the level of quality or safety.
Specifically, relief is being sought to extend the current fourth IST interval an additional eight months from September 30, 2017, to May 31, 2018. Relief is required to extend the present interval since JAFNPP previously extended the IST interval for a total of 12 months, in two transmittals to the NRC: JPN-96-019, dated April 26, 1996, describing a nine-month extension, and JPN-97-015, dated April 16, 1997, describing an additional three-month extension. These letters document the twelve-month extension of the IST interval allowed by ISTA-3120(d).
Exelon Generation Company, LLC (Exelon) recently purchased the JAFNPP in early April 2017. Prior to that time, it was expected that the JAFNPP, which was operated by Entergy Operations, Inc., would be shut down prior to the start of the 5th IST interval. Therefore, no need existed to apply for relief from OM Code requirements associated with a new interval since the current interval was scheduled to end on September 30, 2017. However, since JAFNPP is to remain operating under new ownership, there is only a shortened time frame (April to September) to prepare for a new OM Code interval, develop a new IST program, and subsequently submit any necessary relief requests for timely NRC review and approval.
There is not the typical one-year review time afforded the NRC for review of relief requests.
James A. FitzPatrick Nuclear Power Plant Relief Request No. RR-001 Extension of the Fourth 10-Year IST Interval Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)
-Code Requirements Present an Undue Hardship Without a Compensating Increase in the Level of Quality or Safety-(Page 2 of 4) 5.0 PROPOSED ALTERNATIVE AND BASIS FOR USE:
Exelon is requesting an eight-month extension to prepare for the new interval, develop a new IST program applicable to the latest updated edition of the OM Code and subsequent submittal of applicable relief requests for NRG approval.
In order to recover this requested eight-month extension, the 5th ten-year IST interval that is proposed to begin on June 1, 2018, will end on September 30, 2027. Succeeding intervals will be scheduled in ten-year increments.
All previously NRG-approved JAFNPP relief requests (alternatives) for the 4th IST interval will also be extended until May 31, 2018, as a result of this proposed alternative. The JAFNPP will continue to comply with all requirements as specified in the current edition and addenda of the ASME OM Code and the approved NRG relief requests during this eight-month extended 4th IST interval time period. See Table 1, "Relief Requests Approved for JAFNPP 4th IST Interval", for the listing of Relief Requests approved for the 4th IST Interval at JAFNPP.
JAFNPP requests this additional time to allow for submittal of the necessary relief requests, NRG review and approval of the relief requests, and submittal of the IST Program for the 5th IST interval. This has the potential to result in emergent plant modifications and additional testing requirements. Based on the hardship resulting from implementing the OM Code requirements without a compensating increase in the level of quality and safety and that the relief will provide for a more manageable transition between a change in Code requirements, Exelon is requesting this proposed alternative pursuant to 10 CFR 50.55a(z)(2).
6.0 DURATION OF PROPOSED ALTERNATIVE:
Relief is requested to modify the end date of the JAFNPP fourth 10-year IST interval and start date of the 5th IST interval. The current 4th IST interval is scheduled to end September 30, 2017, and is proposed to end May 31, 2018. As a result, the 5th IST interval would commence on June 1, 2018, and end on September 30, 2027.
7.0 PRECEDENCE
- 1. Letter from NRG (W. D. Beckner) to Entergy Operations, Inc. (M. J. Meisner), "Update of lnservice Testing Programs for Arkansas Nuclear One, Units 1 and 2, Grand Gulf Nuclear Station, River Bend Station, and Waterford Steam Electric Station, Unit 3, (TAC Nos.
M94471, M94472, M94452, M94473, M94488)," dated August 27, 1996 (Accession Number 9608300001)
- 2. NRG SER, "Interim Extension of 120-Month Interval for lnservice Inspection and lnservice Testing (ISl/IST) Programs for Waterford Steam Electric Station, Unit 3, (TAC No. M89544),"
dated August 2, 1994 (Accession Nos. 9408080070 and 9408080075)
James A. FitzPatrick Nuclear Power Plant Relief Request No. RR-001 Extension of the Fourth 10-Vear IST Interval Proposed Alternative in Accordance with 10CFR 50.55a(z)(2)
-Code Requirements Present an Undue Hardship Without a Compensating Increase in the Level of Quality or Safety-(Page 3 of 4)
8.0 REFERENCES
- 1. JPN-96-019, dated April 26, 1996 (Accession Number 9605020205)
- 2. JPN-97-015, dated April 16, 1997 (Accession Number 9704240132)
James A. FitzPatrick Nuclear Power Plant Relief Request No. RR-001 Extension of the Fourth 10-Vear IST Interval Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)
-Code Requirements Present an Undue Hardship Without a Compensating Increase in the Level of Quality or Safety-(Page 4 of 4)
Table 1 Relief Requests Approved for JAFNPP 4th IST Interval Relief Request Number Description VRR-01 Withdrawn VRR-02 Traversing In-Core Probe Containment Isolation Valve Stroke Time VRR-03 Excess Flow Check Valve Exercise Testina Durina Refuelina Outaaes VRR-04 Hiqh Pressure Coolant Injection Check Valve Online Testinq VRR-05 Power-Operated System Control Valves with Safety Function VRR-06 Safety Relief Valve Testing Interval VRR-07 Pressure Isolation Valve Testinq at Aooendix J Frequency VRR-08 Solenoid Operated Valve Position Indication Testing at Appendix J Frequency PRR-01 Withdrawn PRR-02 Core Spray Pump Suction Pressure Gauge Ranae PRR-03 Emergency Service Water Pumps Use of a Pump Curve PRR-04 Residual Heat Removal Service Water and Emergency Service Water Smooth Running Pumps PRR-05 Residual Heat Removal Pump Vibration Alert Ranqe