Forwards Insp Repts 50-387/90-200 & 50-388/90-200 on 900813-17 & 27-31.Insp Team Identified 14 Findings
ML17157A370
Person / Time
Site: Susquehanna  
Issue date: 10/15/1990
From: Varga S
Office of Nuclear Reactor Regulation
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17157A371 List:
References
NUDOCS 9010240201
Download: ML17157A370 (8)


See also: IR 05000387/1990200

Text

ACCELERATED DISTIUBUTION DEMONSTPATION SYSTEM

aP

Cp

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9010240201

DOC.DATE: 90/10/15

NOTARIZED:

NO

,

DOCKET

FACIL:50-387 Susquehanna

Steam Electric Station, Unit 1, Pennsylva

05000387

50-388

Susquehanna

Steam Electric Station, Unit 2, Pennsylva

05000388

~

~

~

AUTH.NAME

AUTHOR AFFILIATION

ARGA,S.A.

Division of Reactor Projects

I/II (Post

870411)

RECIP.NAME

RECIPIENT AFFILIATION

KEISER,H.W.

Pennsylvania

Power

6 Light Co.

SUBJECT:

Forwards

Insp Repts

50-387/90-200

a 50-388/90-200

on

900813-17

s

27-31.No violations noted.

DISTRIBUTION CODE:

DFOID

COPIES

RECEIVED:LTR l

ENCL

l

SIZE: 0 + 5

TITLE: Direct Flow Distribution:

50 Docket

(PDR Avail)

R

D

NOTES:LPDR

1

cy Transcripts.

LPDR 1 cy

Transcripts.

05000387

3

05000388

/

RECIPIENT

ID CODE/NAME

INTERNAL: NUDOCS-ABSTRACT

EXTERNAL: NRC

PDR

NOTES:

COPIES

LTTR ENCL

1

1

1

1

2

2

RECIPIENT

ID CODE/NAME

EG FILE

01

NSIC

COPIES

LTTR ENCL

1

1

1

1

D

D

D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WA~t CONTACT THE DOCUMENT CONTROL DESK,

ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION

LINIS FOR DOCUMENTS YOU DON'T NEED!

D

D

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

6

ENCL

6

s

I~

)

~y,a aagI

(4

+

w

o

'P~

UNITED STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON, D. C. 20555

October

15,

1990

Docket Nos. 50-387

and 50-388

Mr. Harold M. Keiser, Senior Vice President - Nuclear

Pennsylvania

Power and Light Company

2 North Ninth Street

Al1entown,

Pennsylvania

18101

Dear Mr. Keiser:

SUBJECT:

ELECTRICAL DISTRIBUTION SYSTEM FUNCTIONAL INSPECTION

AT SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1

AND 2

(50-387/90-200

AND 50-388/90-200)

Me are forwarding the report of the electrical distribution system functional

inspection

(EDSFI) conducted

by the Nuclear

Regulatory

Commission

(NRC) Office

of Nuclear Reactor Regulation during August 13 through

17 and

27 through

31, 1990, at Susquehanna

Units

1 and 2.

The primary purpose of the inspection

was to determine whether the electrical distribution system

as designed,

installed,

and configured at the Susquehanna

Steam Electric Station Units

1 and

2 would be capable of performing its intended safety functions.

In addition,

an assessment

of engineering

and technical

support relative to the electrical

distribution system

was performed.

The areas

examined during the inspection

are discussed

in the enclosed

inspection report.

The results of this inspection were discussed

with members of your staff during

the exit meeting

on August 31, 1990.

The team identified 14 findings and were

specifically concerned

about inadequate

setpoints for degraded grid relays,

unqualified valve motor actuators,

inadequate

testing of dc circuit breakers,

and inoperative diesel fuel oil storage

tank indication.

Several of the

14 findings identified may have resulted from weaknesses

in the Susquehanna

discrepancy

management

program.

The high quality of engineering

associated

with recent modifications was

considered

a strength.

The Pennsylvania

Power

and Light Company

team which

interacted with the inspection

team was very well prepared,

technically

competent,

and organized.

In addition, internal

QA audits were found to be

very thorough

and to have identified

some important programmatic

concerns,

although corrective action for these

concerns

was found to be slow or lacking

in several

instances.

In accordance

with 10

CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

The finding involving the

unqualified valve motor actuators

has

been included in regional inspection

report 50-387/90-17

and 50-388/90-17.

Any other specific enforcement actions

resulting from this inspection will be identified by the Region I staff in

~

~

~

~

~

separate

correspondence.

~ '1 P(6

q01,0240201

90f00+8

PDR

ADOCIl, 0500

NV

8

Nr. Harold

W. Keiser

-2-

October

15,

1990

Please

inform us in writing, within 60 days, of the actions

planned to correct

~

~

~

~

~

these deficiencies

and the date that these actions will be completed for

followup inspection.

Should you have

any questions

concerning this inspection,

please

contact the

NRR project manager,

Mohan Thadani, or the inspection

team

leader, Jeffrey Jacobson.

Messrs.

Thadani

and Jacobson

can be reached at

(301) 492-1419

and (301) 492-0996, respectively.

S incere ly,

'Qftgl08t signed by

Steven

A. Varga, Director

Division of Reactor Projects I/II

Office of Nuclear Reactor Regulation

Enclosure:

Inspection Report 50-387/90-200

and 50-388/90-200

cc:

See

page

3

Distribution:

See

page

4

SIB:DRIS

C:

'S

RAGramm

WDL

ing

10/1~90

10/I /90

RSIB:D

S

~B:6RIS

JBJacq

n:bt t/fVAthavale

10/Ig

10/lx /90

es

10/I9./9~0 )~

DRIS

I

Almond

10/ig/90

Var

0

fr

AEOD

ion I

olliffe

Lara

/O /90

10/ix /90

gon I

KMathew

10/I2 /90

d

d

r

~

<< ',

<<

'

I

<<

I

d

i<<

II

<<

l I

I'

~

II

<< I

It<<

I'

. ~ '

II<<

I

1

  • 4>>

~ ~'

<<,I r<<><<d I

<<p

II

I

'L

<<<<<<I j

'l<<d $ 'hril ~ 'dr

I "dh I dII (>>"

3

d

r I>>r II

II

d

I,I

I

~

I '"I<<

'I

.<<V>>

I ~

d I

II

~ V'0 ~ d

ldll

Il

<<d I<<t,

,,x>>

Mr. Harold

W. Keiser

Pennsylvania

Power

& Light Company

-3-

Susquehanna

Steam Electr ic Station

Units

1

& 2

CC:

Jay Silberg,

Esq.

Shaw, Pittman, Potts

& Trowbridge

2300

N Street

N.W.

Washington,

D.C.

20037

Bryan A. Snapp,

Esq.

Assistant Corporate

Counsel

Pennsylvania

Power

& Light Company

2 North Ninth Street

Al1 entown, Pennsylvania

18101

Mr. J.

M. Kenny

Licensing

Group Supervisor

Pennsylvania

Power

& Light Company

2 North Ninth Street

Al 1 entown,

Pennsy1 vania

18101

Mr. Scott Barber

Senior

Resident

Inspector

U. S. Nuclear Regulatory

Commission

P.O.

Box 35

Berwick, Pennsylvania

18603-0035

Mr. Thomas

M. Gerusg, Director

Bureau of Radiation Protection

Resources

Commonwealth of Pennsylvania

P.O.

Box 2063

Harrisburg,

Pennsylvania

17120

Mr. Jesse

C. Tilton, III

Allegheny Elec. Cooperative,

Inc.

212 Locust Street

P.O.

Box 1266

Harrisburg,

Pennsylvania

17108-1266

Mr. S.

B. Ungerer

Joint Generation

Projects

Department

Atlantic Electric

P.O.

Box 1500

1199 Black Horse Pike

Pleasantville,

New Jersey

08232

Regional Administrator, Region I

U.S. Nuclear Regulatory

Commission

475 Allendale Road

King of Prussia,

Pennsylvania

19406

Mr. Harold G. Stanley

Superintendent

of Plant

Susquehanna

Steam Electric Station

Pennsylvania

Power and Light Company

2 North Ninth Street

Allentown,

Pennsy 1vani a

18101

Mr. Herbert D. Woodeshick

Special Office of the President

Pennsylvania

Power

and Light Company

1009 Fowles Avenue

Berwick, Pennsylvania

18603

Mr. Robert

G. Byram

Vice President-Nuclear

Operations

Pennsylvania

Power and Light Company

2 North Ninth Street

Allentown, Pennsy

1 vani'a

18101

I

J

I

I

l

~

8.

Hr. Harold W. Keiser

October

15,

1990

Distribution:

~

~

ODD

"53:387

5 ~5D.388

RSIB R/F

DRIS R/F

TEHurley,

NRR

FJNiraglia,

NRR

WTRussell,

NRR

JGPartlow,

NRR

BKGrimes,

NRR

BDLiaw, NRR

WDLanning,

NRR

JBJacobson,

NRR

RAGramm,

NRR

RLSpessard,

AEOD

SAVarga,

NRR

WRButler,

NRR

NCThadani,

NRR

MBO'Brien,

NRR

PDSwetland,

RI

GSBarber,

SRI Susquehanna

Regional Administrators

Regional Division Directors

Inspection

Team

LPDR

PDR

ACRS (3)

OGC (3)

1S Distribution

a '

a

s

I

f

I