ML17156B549
| ML17156B549 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 12/22/1989 |
| From: | Hodges M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17156B550 | List: |
| References | |
| EA-89-208, NUDOCS 9001030144 | |
| Download: ML17156B549 (5) | |
See also: IR 05000387/1989080
Text
ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM
O
~
(
e
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ESSION NBR:9001030144
DOC.DATE: 89/12/22
NOTARIZED: NO
DOCKET
FACIL:50-387 Susquehanna
Steam Electric Station, Unit 1, Pennsylva
05000387
50-388 Susquehanna
Steam Electric Station, Unit 2, Pennsylva
05000388
AUTH.NAME
AUTHOR AFFILIATION
HODGES,M.W.
Region 1, Ofc of the Director
RECIP.NAME
RECIPIENT. AFFILIATION
KEISER,H.W.
Power
& Light Co.
SUBJECT:
Forwards Enforcement
Conference
Repts 50-387/89-80
&
50-388/89-80
on 891121
DISTRIBUTION CODE:
IE42D
COPIES
RECEIVED:LTR
ENCL
SIZE
TITLE: Operator Licensing Examination Reports
NOTES:LPDR
1
cy Transcripts.
LPDR 1 cy
Tran'scripts.
D
05000387
05000388
A
RECIPIENT
ID CODE/NAME
PD1-2
COPIES
LTTR ENCL
1
1
RECIPIENT
ID CODE/NAME
THADANI,M
COPIES
LTTR ENCL
1
1
D
D
INTERNAL: ACRS
2
2
NRR SHANKMAN,S
1
1
NRR/D~LP
LOLB10
'
1
E~TLE
1
1
AEOD/DSP/TPAB
NRR/DLPQ/LHFB11
NUDOCS-ABSTRACT
RGN1
FILE
01
1
1
1
1
1
1
1
1
F
RNAL: LPDR
NOTES:
1
1
1
'1
2
2
NRC PDR
1
1
R
D
NOTE TO ALL"RIDS" RECIPIENTS;
PLEASE HELP US TO REDUCE WASTE! CONTACI'HE.DOCUMENT CONTROL DESK,
ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION
LISIS FOR DOCUMENTS YOU DON'T NEEDl
AL NUMBER OF COPIES
REQUIRED:
LTTR
16
ENCL
16
D
D
Docket Nos.
50-387
50-388
PEC P> )999
Enforcement Action No.89-208
Power
8 Light Company
ATTN: Mr. Harold
W. Keiser
Senior Vice President - Nuclear
2 North Ninth Street
Allentown, Pennsylvania
18101
Gentlemen:
SUBJECT:
ENFORCEMENT CONFERENCE
ON NON-PROFICIENT OPERATORS
PERFORMING
LICENSED DUTIES AND NOTICE OF VIOLATION (NRC INSPECTION
REPORT
NOS.
50-387/89-80
and 50-388/89-80)
i
This letter refers to the Enforcement
Conference
held
on November 21,
1989, at
the Region I Headquarters.
The conference
was conducted
by Mr. Robert Gallo
with members of your staffs
The purpose
of. the conference
was to discuss
the
apparent violation identified by the
NRC during the Training Program
Team
Inspection
conducted August 21-25,
1989.
The report documenting this inspec-
tion was sent to you by letter dated October 26,
1989.
The apparent violation
concerned
the provision in"the requalification program implementing procedure
that allowed the assignment
of licensed duties to personnel
that had failed
a
required comprehensive written examination or annual
operating test prior to
successful
retraining
and retesting.
As
a result of this inspection
and
subsequent
enforcement
ccnference,
a failure to comply with NRC regulatory
requirements
was identified.
To emphasize
the
need for adequate
controls to assure
that properly qualified
licensed
persons
are assigned
licensed duties, this office is issuing
a Notice
of Violation enclosed
as Appendix
A to this lette~.
The violation described
in
Appendix A involved
a failure to provide adequate
controls to assure
that pro-
ficient operators
licensed
pursuant to 10 CFR 55 were assigned
licensed duties.
This occurred
when
a senior reactor operator
(SRO),
who had failed an annual
operating test
and, thus, did not satisfy the requirements
per
(a)(2),
was assigned
licensed duties in January
and February
1989.
The
NRC
recognizes
that other properly qualified licensed operators
were present
in the
control
room while this
SRO was
on shift.
We note that your short term correc-
tive action to change, the implementing procedure
was appropriate.
As described
at the enforcement
conference,
your initiative to revise regulatory
based
documentation
to meet Regulatory Guide 1.8, Revision 2, is
a comprehensive,
long-term corrective action.
900l030l44 89l222
AGOCK 0'5000387
9
Power
8 Light Company
You are required to respond to this letter and should follow the .instructions
specified in the enclosed
Notice when preparing your response.
Further,
in
your response
please
confirm your commitment to us to revise regulatory
based
documentation
to meet Regulatory
Guide 1.8, Revision 2.
You are requested
to detail the scope
and schedule for implementation of your commitments to the
NRC.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of this
letter and its enclosures will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter and enclosed
notice are not subject to
.
the clearance
procedures
of the Office of Management
and Budget
as required
by
the paperwork reduction act of 1980, Public
Law No.96-511.
Your cooperation with us in this matter is appreciated.
Sincerely,
~+fzgQ,~g
~c
Enclosure:
Enforcement
Conference
Repo'rt
Marvin W. Hodges, Director,
Division of Reactor Safety
cc w/enclosure
A.
R. Sabol,
Manager,
Nuclear equality Assurance
J.
M. Kenny, Licensing Group Supervi. or
R.
G,
Bryam, Superintendent
of Plant-SSES
S.
B. Ungerer,
Manager,, Joint Generation
Projects
Department
J.
D. Decker, Nuclear Services
Manager,
General
Electric Co.
B. A. Snapp,
Esquire, Assistant
Corporate
Counsel
H.
D. Woodeshick,
Special Office of the President
J.
C. Tilton, III, Allegheny Electric Cooperative,
Inc.
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
Commonwealth of Pennsylvania
0001,1.0
OFFICIAL RECORD
COPY
HOWE/SUSg.
ENF. CONF./11/30/89-
Power 5 Light Company
bcc w/encl:
Region I Docket
Room (with concurrences)
M. Thadani,
J.
Dyer,
Chief,
OLB DLPQE,
J. Linville, DRP
P.
Swetland,
D. Holody,
ORA
S. Shankman,'HFB,
R. Conte,
A. Howe,
DRS Files (3)
bcc w/o encl.:
Management Assistant,
DRMA
DRS: RI
DRS:RI,
. RI
Howe/ajk/dmg
Conte WQ
Swetland
12/~/
12/1) /89
12/(i/89
gI/
- RI
DRS:
G lip
Johnston
12/)+89
12//jt/89
DRS:RI
Hodges
12/z-(/89
OFFICIAL RECORD
COPY
HOWE/SUSQ.
ENF. CONF./11/30/89
11/28/89