ML17156B341
| ML17156B341 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 09/01/1989 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17156B342 | List: |
| References | |
| NUDOCS 8909130283 | |
| Download: ML17156B341 (4) | |
See also: IR 05000387/1989018
Text
I
REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)
SSION NBR:8909130283
DOC.DATE: 89/09/01
NOTARIZED: NO
FACIL:50-387 Susquehanna
Steam Electric Station, Unit 1, Pennsylva
50-388
Susquehanna
Steam Electric Station, Unit 2, Pennsylva
AUTH.NAME, 'UTHOR AFFILXATION
DURR,J.P.
Region 1, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
KEISER,H.W.
Power
& Light Co.
SUBJECT: Forwards Insp Repts 50-387/89-18
& 50-388/89-16
on 890710-14
& notices of violation
& deviation.
DISTRIBUTION CODE
IE01D
COPIES, RECEIVED LTR
ENCL g
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vio ation Response
DOCKET
N
05000387
05000388
gc CELEBRATED
Dl.'~~BUTTON
DEMONSTRATION
. SYSTEM
NOTES:LPDR 1
cy Transcripts.
LPDR 1 cy
Transcripts.
05000387 j
05000388
RECIPIENT
ID CODE/NAME
PD1-2
INTERNAL: ACRS
AEOD/DEIIB
DEDRO
NRR SHANKMAN,S
NRR/DLPQ/PEB
NRR/DREP/EPB
10
NRR/PMAS/ILRB12
OQ~~BE
G~
02
GN1
FILE
01
EXTERNAL: LPDR
'OTES
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1'
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
RECIPIENT
ID CODE/NAME
THADANX,M
AEOD/TPAD
LOIS, ERASMIA
NRR/DEST DIR
NRR/DOEA DIR ll
NRR/DREP/RPB
10
NUDOCS-ABSTRACT
OGC/HDS2
RES MORISSEAU,D
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
NOXK K) ALL "RXDSn RECXPZERIS
PLEASE HELP US IO REDOCB HASTE!
CXÃ3[RCZ '%HE DOCUMEÃZ CXNZRDL DESK,
RXN Pl-37
(EXT. 20079) m EZiQGMGR KKR MME HKH DIPI%GBQTZCN
LTSXS MR DOCUMENIS~ DCK~T NEED)
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
28
ENCL
28
0 i )989
Docket Nos.
50-387
50"388
Power 5 Light Company
ATTN:
Mr. Harold W. Keiser
Senior Vice President - Nuclear
2 North Ninth-Street
Al 1 entown,
Pennsyl vani a
18101
Gentlemen:
Subject:
Inspection
Report Nos. 50-387/89-18
and 50-388/89-16
This letter refers to the routine inspection
conducted
by Mr. E.
H. Gray of
this office on July 10-14,
1989 of activities at the Susquehanna
Nuclear
Power
Plant.
Mr. Gray discussed
the results of the inspection with Mr.
R.
G.
Byram
at the conclusion of the inspection.
Areas examined during this inspection are described
in the
NRC Region I
Inspection
Report which is enclosed with this letter.
Within these
areas,
the
inspection consisted
of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and observations
by the inspector.
Based
on the results of this inspection, it appears
that one of your activities
was not conducted
in full compliance with NRC requirements,
as set forth in the
Notice of Violation, enclosed
herewith as Appendix A.
Specifically, valve
034038D
on the diesel
generator
D2 outlet air receiver line was not properly
locked in the
open position.
This violation has
been categorized
by severity
level in accordance
with the "General
Statement
of Policy and Procedure for NRC
Enforcement Actions,"
10 CFR Part 2, Appendix
C {Enforcement Policy).
In
addition,
the level of fuel maintained in the emergency diesel
generator
(EDG)
day tanks
was noted to be less
than that required in the
FSAR.
This deviation
is set forth in the Notice of Deviation, Appendix B.
You are required to respond to this letter and in doing
so you should follow
the instructions provided in Appendices
A and B.
We request that your response
include
a discussion
of any actions you may consider appropriate
to further
improve reliability of the emergency diesel
generators
based
on observations
made in Section 3.2 of the enclosed report.
In addition,
we suggest that your
FSAR should
be updated
to clearly state
the amount of usable'uel
in the
day tanks.
8909130283
890901
ADOCK 05000387
O
OFFICIAL RECORD
COPY
CIR SUSQUEHANNA 89"16/18 - 0001.0.0
09/01/89
If
Power 4 Light Company
SEP 01
$989
Your cooperation with us in this matter is appreciated.
Sincerely,
Origia81 Signed BF:
Clifford J, ~eT's~
Jacque
P. Ourr, Chief
Engineering
Branch
Division of Reactor
Safety
Enclosures:
l.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
3.
NRC Region I Inspection
Report Numbers 50-387/89-18
and 50-388/89-16
cc w/encls:
A.
R. Sabol,
Manager,
Nuclear Quality Assurance
E. A. Heckman,
Licensing Group Supervisor
R.
G ~ Bryam, Superintendent
of Plant-SSES
S.
B. Ungerer,
Manager, Joint Generation
Projects
Department
J.
O. Decker,
Nuclear Services
Manager,
General Electric Co.
B. A. Snapp, 'Esquire, Assistant Corporate
Counsel
H.
D. Woodeshick,
Special Office of the President
J.
C. Tilton, III, Allegheny Electric Cooperative,
Inc.
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
Commonwealth of Pennsylvania
bcc w/encls:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encl)
R. Blough,
J.
Lyash,
ORP
PAO 10 (SALP) Reports
Only
J. Wiggins,
M. Kohl,
ORP
M. Thadani,
J.
Dyer,
EOO
RI: DRS
Gray/gcb/rw
Nr~.
RI:ORS
Strosnider
RI:DRS
Durr
8/1 /89
8/9 /89
8/QJ89
OFFICIAL RECORD
COPY
CIR SUSQUEHANNA 89-16/18 " 0001.1.0
08/04/89