ML17156B098

From kanterella
Jump to navigation Jump to search
Mgt Meeting Rept 50-387/89-08 & 50-388/89-08 on 890321.Major Items Discussed:Licensee Review & Lessons Learned from 1988 Refueling Outage & Plans for Upcoming Refueling Outages.List of Attendees & Presentation Matls Encl
ML17156B098
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/30/1989
From: Blough A, Young F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17156B097 List:
References
50-387-89-08-MM, 50-387-89-8-MM, 50-388-89-08, 50-388-89-8, NUDOCS 8904120503
Download: ML17156B098 (96)


See also: IR 05000387/1989008

Text

~

'r

U.S.

NUCLEAR REGULATORY COMMISSION

REGION I

Meeting

Nos ~

Docket

Nos ~

License Nos.:

Licensee:

50-387/89-'08

50-388/89-08

50-387

50"388

NPF-14

NPF-22

Pennsylvania

Power

and Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

Facility Name:

Susquehanna

Steam Electric Station

Meeting At:

USNRC,

Region I, King of Prussia,

Pennsylvania

Meeting Conducted:

March 21,

1989

Reviewed

By:jn Francis

.

Young, Senior Resident

Inspector

Susquehanna

Steam Electric Statio'n

Date

Approved By:

A. Randy

ough, Chief

Reactor

Projects

Section

No.

3B

Division of Reactor

Projects

Date

A management

meeting

was

held at

NRC

Region I

on

March 21,

1989,

to discuss

(1) the licensee's

review and lessons

learned

from the

1988 refueling outage at

Unit

2,

and

(2) the

licensee's

plans,

including

scheduled

activities

and

management

controls

to

be

applied,

for upcoming refueling outages

at Units

1

and 2.

Results:

Licensee

presentations

were

thorough

and

were responsive

to

NRC Region I needs

for information.

Based

on this presentation, it appears

that the licensee

has

performed appropriate

review of the

1988 Unit 2 outage

and is prepared

to apply

the resultant

lessons

learned

to future outages.

8904120503

890330

PDR

ADOCK 05000387

9

PDC

p

~

~

1.0

Pur ose'nd

Attendees

DETAILS'

The

meeting

was

held

to

discuss

(1) the

licensee's

review

and

lessons

learned

from the

1988

Unit

2

refueling

outage

and

(2) the

licensee's

plans,

including

scheduled

activities

and

management

controls

to

be

applied, for the

1989 refueling outages

at both units.

The meeting

was attended

by those

persons listed in Attachment

1.

2. 0 M~iS

After brief opening

remarks

by the

NRC Region:I

Reactor

Projects

Section

Chief

and

the

licensee's

Senior

Vice President

Nuclear,

the

licensee

presented

detailed

discussions

on:

licensee

management

values;

outage

lessons

learned;

1989 management

initiatives;

1989 outage plans,

scheduled

activities,

and

management

controls;

and

nuclear

safety

during

outages.

Attachment

2 contains

copies

of the

overhead projector transparencies

used

by the licensee.

Each presentation

led to detailed,

open discussions

among

the various

NRC and licensee participants.

The meeting lasted .about

two and one-half hours.

3.0

Conclusion

,The

licensee

was -well-prepared

for the

meeting

and their presentations

were

responsive

to

NRC information

needs.

The

meeting

provided

a

forum

for frank exchange

of information.

Based

on the licensee's

presentations,

it appeared

that

the

licensee

has

performed

an

appropriately

detailed

review of the

1988 Unit 2 refueling

outage

and is prepared

to apply the

resultant

lessons

learned

to future outages.

Attachments:

1.

Heeting Attendees

2.

Licensee

Presentation.

Materials

ATTACHMENT 1

'uta

e

Less'on's

L'earn'ed Meetin

'-" March'21

1989

Attendees'enns

lvania Power

and Li ht

Com an

H.

W.

R.

G.

A.

M.

J.

R.

H.

G.

E. A.

F.

S.

D.

F.

R.

L.

F.

G.

Keiser, Senior Vice President - Nuclear

Byram, Plant Superintendent

SSES

Male, Manager - Nuclear Plant Engineering

Miltenberger,

Manager - Nuclear Safety Assessment

Stanley,

Assi stant Superintendent

Outages

Heckman,

Licensing Group Supervisor

Gruscavage,

Site Supervisor

Nuclear Safety Assessment

Roth, Senior Compliance

Engineer

Doty, Supervisor - Radiological

& Environmental

Services

Butler, Manager - Nuclear Design

Atlantic Electric

L. Fink, Project Supervisor

United States

Nuclear

Re viator

Commission

J.

T. Wiggins, Chief, Reactor Projects

Branch

No. 3, Division of Reactor

Projects

(DRP)

A.

R. Blough, Chief, Reactor Projects Section,

38,

DRP

F. I. Young, Senior Resident

Inspector

SSES

J.

R. Stair,

Resident

Inspector

SSES

T. T. Martin, Director, Division of Reactor Safety

(DRS)

N. J.

Blumberg, Chief, Operations

Section,

DRS

B. Clayton,

Regional

Coordinator, Office of the Executive Director for

Operations

.

M. Thadani,

Project Manager, Office of Nuclear Reactor Regulation

ATTACHMENT 2

. OUTAGE MANAGEMENT..ATTRIBUTES.

o

OUTAGES PLANNED INDEPTH AND MELL EXECUTED

o

DYNAMIC OUTAGE MANAGEMENT PROGRAM

o

STRONG

MANAGEMENT TEAM

'I

o

FUNDAMENTAL VALUE:

LEARN FROM OUR EXPERIENCES

o

MATERIAL CONDITION IS EXCELLENT

o

'NVOLVEMENT OF ENTIRE ORGANIZATION

o

COMPREHENSIVE INDEPENDENT PRE-OUTAGE ASSESSMENTS-

~

r

~

~

~

~

NUCLEAR DEPARTMENT VALUES

~

~

r

k

MISSION:

TO ACHIEVE EXCELLENCE IN THE OPERATION,

MAINTENANCE AND

SUPPORT

OF

SUSQUEHANNA AND BY SO DOING. BE RECOGNIZED

AS

ONE OF THE BEST NUCLEAR UTILITY ORGANIZATIONS IN THE

UNITED STATES.

o

HIGH STANDARDS:

THE FOUNDATION OF EXCELLENCE

o

EMPLOYEES:

OUR MOST VALUABLE ASSET

o

IMPROVEMENT:

FROM EVENTS

AND EMPLOYEES

o

TEAMWORK:

OUR ORGANIZATIONAL CLIMATE

o

PERFORMANCE:

THE MEASUREMENT OF SUCCESS

o

RISING EXPECTATIONS:

THE CHALLENGE OF THE FUTURE

o

PLANNING

o

PEOPLE:

NAJOR THPIE FOR 1988

o

TMO EXAMPLES OF PIPLOYEE INVOLVPlENT

UNIT 2 2ND REFUEL TASK FORCE

MAINTENANCE OER

o

1989 INITIATIVES

PLANNING CYCLE

1986

1987

1988

="

. 1989

UNIT 'nv

UNIT 2 1sT

UNIT 1 3RD

UNIT 2 2so

UNIT 1 0z4

UNIT 2 3Rn

OUTAGE CRITIQUE

QOOFAOE CRIIIQ

FORCE

PLAHNIHG

CONFERENCE

0

SALP REPORT

PLANING

CONFEllENCE

PLANNIH6

CONFERENCE

SALP REPORT

PLANNING

COHFEREN

INPO RE

.INPO REPORT

IATIVE

D

NEM INITIATIVES AND

SOURCES

OF

INFORMATION

INTERNAL

DEFICIENCY CONTROL

PROGRAMS

o

SOOR

. o

NCR

o,

LER

NQA

o

SURVEILLANCES

o

AUDITS

NSAG

o

ROUTINE REVIEWS

o

SPECIAL REVIEWS

PERFORMANCE

ENHANCEMENT TEAMS

OUTAGE CRITIQUES

TASK SPECIFIC

REVIEMS

ANNUAL ASSESSMENTS

o

SRC

o

NUCLEAR SERVICES

EXTERNAL

NRC

o

INSPECTIONS

o

SALP

INPO

o

SOERs

o

ROUTINE

o

. OUTAGE.

o

ASSISTANCE'NSURANCE

COMPANIES

NSAG

NQA

PETs

NRC

INITIATIVES

TASK

REVIEWS

INPO

OUTAGE

CRITIQUE

ANNUAL

ASSESSMENTS

~

PLANNING

o

PEOPLE:

MAJOR THEME FOR 1988

o

TWO EXAMPLES OF

EMPLOYEE INVOLVEMENT

UNIT 2 2ND REFUEL TASK FORCE

MAINTENANCE OER

o

1989 INITIATIVES

PEOPLE:MAJOR

THEME FOR 1988

EMPLOYEE

I

N V 0 L V E

M E

N T

EMPLOYEE

DEVELOPMENT

,1988. EMPLOYEE

= INVOLVEMENT/DEVELOPMENT INITIAT!VES

o

MANAGEMENT/SUPERVISORY TRAINING

o

DEPARTMENT PERFORMANCE

ENHANCEMENT TEAM

o

TASK SPECIFIC

PERFORMANCE ENHANCEMENT TEAMS

o

ORGANIZATIONAL EFFECTIVENESS

REVIEWS

. MANAGEMENT/SUPERVISORY TRAINING. PROGRAM

0

LEADERSHIP SKILL TRAINING

0

ALL DEPARTMENT SUPERVISION

(SR. V.P,

TO FOREMEN)

0

SENIOR

MANAGEMENT PILOT PROGRAM

0

SENIOR

MANAGEMENT CLASS

LEADS

17

GROUPS

0

275

DEPARTMENT SUPERVISORS

0 i INSTRUCTORS

MERE EXPERTS

IN THEIR FIELD

0

CURRICULUM

DEPARTMENT MISSION AND VALUES

COMMUNICATION

COACHING

INTERPERSONNEL SKILLS

TEAM WORK & EMPLOYEE INVOLVEMENT

~

PLANNING

~

PEOPLE;

MAJOR THPlE FOR 1988

o

. TMO EXAMPLES OF EMPLOYEE INVOLVEMENT.

UNIT 2 2ND REFUEL TASK FORCE

MAINTENANCE .OER

o

1989 INITIATIVES

.::; UNIT'2:.-2ND .REFUEL. TASK; FORCE',

OBJECTIVE:

COMPREHENSIVE ANALYSIS OF ACTIVITIES THAT DID NOT

MEET MANAGEMENT EXPECTATIONS.

SCOPE:

FORTY TWO UN'IQUE ACTIVITIES

METHODOLOGY:

o

DEVELOP STATION ROOT CAUSE

PROCESS

AND APPLY TO

SCOPE,

o

EMPHASIS

ON GENERIC CAUSAL FACTORS.

TASK FORCE COMPOSITI.ON,,,

...-

I&C SUPERVISOR

LEADER

SR.

ENGINEER QC

SR.

ENGINEER OPERATIONS

ASST.

FOREMAN I&C

SR,

ENGINEER NSAG

UNIT SUPERVISOR

UNIT COORDINATOR

ASST.

FOREMAN MAINTENANCE

CONSTRUCTION SUPERVISOR

SR.

HEALTH PHYSICIST

SR.

COMPLIANCE ENGINEER

MAINTENANCE PLANNING & SCHEDULING SUPERVISOR

RESULTS

, ~

o

SAME WORK MANAGEMENT STRATEGY

OUTAGE VS NON-OUTAGE

o

ACCOUNTABILITY

WORK GROUP/FUNCTION

INDIVIDUAL

o

COMMUNICATION OF

MANAGEMENT EXPECTATIONS TO THE

INDIVIDUALWORKER

o

ADOPTrON OF

ROOT

CAUSE METHODOLOGY AS STANDARD

.o

RESPONSIVENESS

TO ENGINEERING ISSUES

~

~

~ '

~

PLANNIN6

e

PEOPLE:

MAJOR THPIE FOR 1988

o

TWO EXAMPLES OF

EMPLOYEE INVOLVEMENT

UNIT 2 2ND REFUEL TASK FORCE

MAINTENANCE OER

o

1989 INITIATIVES

BACKGROUND

I

I

~

- MAINTENANCE OPERATIONAL EFFECTIVENESS

REVIEW

0

OVER THE YEARS,

MAINTENANCE AT SUSQUEHANNA HAS BEEN

PERFORMED

BY THREE SEPARATE ORGANIZATIONS,

PLANT STAFF

EES

CONSTRUCTION

GPA

CONTRACTOR (CATALYTIC)

0

QUALITY OF MAINTENANCE WORK BY ALL GROUPS

IS EXCELLENT,

MATERIAL CONDITION OF

PLANT

OPERATING

RECORD

OF UNITS

0

INDIVIDUALORGANIZATIONS EACH HAVE A UNIQUE CULTURE,

PROVIDING THEM WITH DIFFERENT SETS

OF POSITIVE

ATTRIBUTES,

ORGANIZATIONS ARE INDIVIDUALLYEFFECTIVE

=0

FUNCTIONAL EFFICIENCY OF THREE ORGANIZATIONS WAS AN

OBVIOUS OPPORTUNITY FOR STUDY AND ENHANCEMENT.

=... MAINTENANCE OPERATIONAL EFFECTIVENESS

REVIEM,

OBJECTIVE:

IDENTIFY OPPORTUNITIES

FOR

IMPROVING EFFICIENCIES

IN OUR MAINTENANCE FUNCTION.

SCOPE

MAJOR SITE GROUPS

PERFORMING PHYSICAL MAINTENANCE,

METHODOLOGY:

EXTENSIVE AND COMPREHENSIVE CUSTOMER/WORKER

INTERVIEWS.

THOROUGH REVIEW OF FUNCTIONAL ANALYSIS REPORTS.

IDENTIFY ORGANIZATIONAL EFFICIENCY IMPROVEMENTS.

'COMPOSITION -OF. TEAN ...

h

IRC SUPERVISOR

RESIDENT ENGINEERING SUPERVISOR

PRA SUPERVISOR

MAINTENANCE SERVICES

SUPERVISOR

ASST.

FOREMAN MECH MAINTENANCE

SUPV.-FIELD COST

AND SCHEDULE

CONSTRUCTION PRODUCTION SUPERVISOR

CONSTRUCTION

FOREMAN

CONSTRUCTION SUPERVISOR

RESOURCES

& TRAINING

SUPERVISOR

OF MAINTENANCE -,SUNBURY

CONSTRUCTION SUPERVISOR

0

SINGLE MAINTENANCE MANAGER

0

ORGANIZE BY FUNCTION

0

RETAIN OUTAGE ORGANIZATIONAL STRATEGY FOR

NON-OUTAGE

0

RECOGNIZE LIMITATIONS ON

CHANGE IMPOSED BY A

TWO REFUEL OUTAGE YEAR

0

PHASED

IMPLEMENTATION OVER FIVE YEARS

ORGANIZATIONAL

PROCESS

SUPPORT

0

PHASE I

COMPLETED JANUARY 15,

1989

0

COMPLETION OF OER

AND RESULTANT CHANGES ARE THE

FIRST STEP

OF

A MULTI-YEAR EFFORT

TO DEVELOP

A

MAINTENANCE FUNCTION THAT IS

A LEADER IN OUR

INDUSTRY.

~

PLANNING

o

PEOPLE:

MAJOR THEME FOR 1988

~

TWO EXAMPLES OF

EMPLOYEE INVOLVEMENT

UNIT 2 2ND REFUEL TASK FORCE

MAINTENANCE OER'

1989 INITIATIVES

1989

INITIATIVES

~, ~

'

'0

" REINFORCE ACCOUNTABILITY':"

ESTABLISHED OUTAGE TEAM FOR CONSECUTIVE OUTAGES

IMPLEMENTED PHASE I

OF MAINTENANCE OER

0

PROMULGATION OF

MANAGEMENT EXPECTATIONS

MROTE/REVISED STATION POLICIES

IDENTIFIED INDIVIDUALEXPECTATIONS

EXTENSIVE DISSEMINATION AND TRAINING

EXAMPLES

PROCEDURE

ADHERENCE

DEFENSE

IN DEPTH

CONTAMINATION CONTROL

'

STATUS

CONTROL

0

ADJUST EXISTING MORK PROCESSES

STATUS

CONTROL

MAINTENANCE PLANNING

PANEL ACCESSIBILITY

0

ENHANCE THE CORRECTIVE ACTION AND,ENGINEERING RESOLUTION

PROCESS

ROOT CAUSE METHODOLOGY

ROOT CAUSE TRAINING

IMPLEMENTED ECO

OUTAGE MANAGEMENT ATTRIBUTES

J

0

o

OUTAGES

PLANNED INDEPTH AND MELL EXECUTED

o

DYNAMIC OUTAGE MANAGEMENT PROGRAM

o

STRONG

MANAGEMENT TEAM

o

FUNDAMENTAL VALUE:

LEARN FROM OUR EXPERIENCES

o

MATERIAL CONDITION IS EXCELLENT

o

iINVOLVEMENT OF ENTIRE ORGANIZATION

E

o

COMPREHENSIVE

INDEPENDENT PRE-OUTAGE ASSESSMENTS

1989.OUTAGE 'REVIEM

.

o.

HOM ME PREPARE

FOR

OUTAGES

o

IMPROVEMENTS FOR 1989

OUTAGES

o

DESCRIPTION

OF l989 OUTAGES

OUTAGE PLANMNG MILESTONES

1987

1988'989

U1-4TH

D

J'

~

H

U1-3RD

U2-2ND

V2-3RD

~

<

~

.. REFUELING OUTAGE SCHEDULE DEVELOPHENT

MAJOR

GU IDELINES

1

1)

TECHNICAL SPEC IF ICATION REQUIREMENTS

A.

ECCS

B.

CORE COOLING

C,

CORE CIRCULATION

D,

CORE ALTERATIONS

E.

SECONDARY CONTAINRENT

F.

PRIMARY CONTAINMENT

2)

MODIF ICATIONS

A.

SYSTEM IMPACT/ACCESS

B,

WORK PACKAGE DEVELOPMENT

C,

DURATION

D.

RETEST

REQUIREMENTS

3)

ESTABLISHED THRU VESSEL CRITICAL PATH ACTIVITIES

A.

SHUTDOWN

B,

CAVITY FLOOD I NG

C.

CORE

& INVESSEL WORK

D.

VESSEL

RESTORATION

0)

WATER RELATED PROBLEMS

A.

VESSEL CLARITY

B,

WATER MANAGEMENT

C.

FUEL POOL

COOl ING

5)

-- DIVISIONAL WORK

A.

RHR

.. B'., CS

C','

ELECTRICAL"SYSTEtrtS

6)

SURVEILLANCE SPECIFIC

A.

LLRT'S

B.

NAJOR

INTEGRATED TESTS

C,

LOGIC FUNCTIONALS

D.

DG TESTING

7)

MAINTENANCE WORK DOCUNENTS

A.

WA'S

B,

PN'S

C.

BULK SURVEILLANCES

8)

PERNI TS

A.

SYSTEM PERNITS

B.

INDIVIDUALPERNITS

9)

OVERALL SCHEDULE EVALUATION

A.

CRITICAL PATH

B.

BULKS

C.

NANPOWER

":;; '.:.'::.'..

"HP* PLANNING

o.

DEDICATED HP

SCHEDULER/PLANNER

o

SCHEDULE CAN BE SORTED BY HP

CONTROL POINT

o

ALARA CONCERNS

ARE FACTOR

INTO OUTAGE SCHEDULE

o

STAGING OF SHIELDING

o

INCREASED DECON ACTIVITIES

I~~

if~< ~

~.Q

~

z

~cl

glib~ >j<>

IBRHtlNE Ietc41UR LfsTIIS

l.

OUTA6E XODENT PLANNING CUR!E

2,

PRE-OUTA6E XCLI%¹ PLANNIN6 CURVE

3,

PRE-OUTA6E MANHOUR BUf50FF CURVE

PERSt3NNEL

ACCESS

PROCESSING

PLANNING ClNE

5,

WA MATERIAL PROCUREMENT TREND CURVE

6.

NE MA%RIAL PROCURPE¹

TREND CURE

7,

OUTAGE PINING ACTIVITYPROGRESS

PLOTS (P/2)

8,

OUTA6E PLANNING MILESTONE INDICATORS

9.

OUTAGE RESOURCE PLAN OVERVIEW PLOT

10,

INDIVIDUALWORK GROUP

RESOURCE PLOTS

11,

DOCù PLANNING STATISTICS (VARIOUS TABULAR REPORTS)

UNIT 1 FOURTH REFUELING L INSPECTION OUTAGE

WORK DOCUMENT TREND FORECASTS

4000

$ 74 0.

$ 400.

$ 440

$ 000

$rdo

i NOIE: TARGET PLACED AT 2850 DOCUMENTS

ENTERING OUTAGE BASED ON

FINAL DOCUMENT FORECAST

2850

I

UI-CURIO

S

6

G~.

~ .. ~...

'.

~

~

~

~

0

~

~

~

~

~

~

~

~

~

~

~

2.

3420

Co

I

IQ>

$ 4oo

2

$440.

$ 000.

O

1rdo

IQdl

X

14OO

K

1440

1000

r40.

400

$ 40

S

e

iO

l

ps

~t~ 0

/

7/

o/

l.l

0 jl-~

I

~

~ ~

S ~

S ~

~

S ~

S ~

Sf

S

~ ~ ~

~ F

Si

S

~

~ ~

SS

S ~

~

~ S

~ ~

S ~

S

S

S ~

S ~

~ ~

~

~ ~

~ S

S ~

bEPTEMbEII

OOTObER

NOVEMbER

DEOEMbER

JANUARY

FEbllUARY

MAROH

1 ~ $ $

10$ ~

0

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~ ~

~ ~

~ 1

~

AS

ST

ST

I

APRII.

MAY

'Legend

6 IDENTIFIED

=.'0 PLANNED

ssssssssssss

0 STAGED

.'

ACT IDENT

., Q ACT PLANNED

m ACT STAGED

STATUS: MAR 15, 1989

8 ~

IMPROVEMENTS FOR

UPCOMING OUTAGES

MISSION OF

OUTAGE HANAGEPIENT

o

SCHEDULE CONTROL

o

SCOPE

CONTROL

o

COMMUNICATION PLAN FOR

PREPARATION

AND CONDUCT

o

INTEGRATE LINE.NANAGEMENT PLANS 8 SCHEDULES

o

LEVELIZE RESOURCES

o

CONTINUOUSLY EVALUATE OUTAGE OBJECTIVES

o

KEEPS

ALL LEVELS OF NANAGENENT INFORNED

.THE KEY CONCEPT

OF THE NEW MAINTENANCE ORGANIZATION IS CLEAR

ACCOUNTABILITYOF THE LINE ORGANIZATION FOR

OUTAGE AND NON-OUTAGE

WORK.

THIS IS ACCOUNTABILITYFOR SAFETY.

PRODUCTION.

SCHEDULE

AND COST.

WE HAVE COMMITTED'THE PLANT STAFF

MANAGEMENT RESOURCES

TO

IMPLEMENT THIS CONCEPT.

~ ~

r ~

'I

1

FUNCTIONAL TEAPI ORGANIZATION

p

~

o

LINE NANAGENENT ACCOUNTABILITY

o

INTEGRATION OF VARIOUS WORK GROUPS

UNDER SINGLE LINE NNAGER

o

SCHEDULING

o.

ENGINEERING SUPPORT

o

ALARA SPECIALIST ASSIGNED

E

UNIT 1

FOURTH REFUEL 4

INSPECTION OUTAGE

RESOURCE

PLAN OVERVIEH

CURRENT

RESOURCE

PLAN

TARGET

OELTA

TURBINE/GENERATOR

SNUBBERS

ISI

VALVES

HEAT- EXCHANGER

CONOENSER

CIRC MATER

MAJOR EqUIPMENT

EXPENSE MINOR MOOS

RP V/CRO/818

'THER

19,000

20,900

17,240

60,790

3,430',900

10,160

4,760

7,040

15,300

59,010

16,300

20,900

14,500

61,500

6,300

5,500

11,400

8,700

11,500

13,800

59,600

2,700

0

2,740

(710)

(2,870)

(1.240)

(3,940)-

(4,460)

1,500

(590)

CAPITAL

SUBTOTAL 08Ã

223,530

22,580

230,0M

(6,470)

(27,420)

TOTAL

246,110

280,000

(33,890)

s jd/trb1495i

++ TOTAL ++

ALL DIAECT AESOUAcEs

ArTACHHENT I

USAGE

60000

x

54000

300000

O

270000

240000

O

~

~

42000

210000

36000

180000

150000

120000

90000

0

16

APA89

23

30

21

HAY89

0

WEEKLY

5084

45058

52119

46256

42998

27751

15054

10354

3100

780

CUHUTVE

5084

50142

102261

148517

191515

219265

234320

244674

247773

248554

a~TIVE ~uss

ae

ltSACK

~.ATlVE US@K

KQAfKC 09.00

~

A MfKE 99.M

l1ll) Cl II fC I'o~> icos ri nH

ESF

ACTUATION .PREVENTION PLAN

o

SPECIALTY SCHEDULES

TO PREVENT ESF

ACTUATIONS

RPS

MSIV

SDC

(LOSS

OF DECAY HEAT REMOVAL)

818'AD MONITOR

o

COMMUNICATION PLAN WITH ALL SITE PERSONNEL

TO STRESS

THE

EXPECTATIONS OF

INCREASED AWARENESS

AND

TAKE TWO

TO STOP

AND THINK OF

WHAT WE ARE DOING.

CONNUNICATIONS PLAN

PLANT MANAGENENT MILL CONDUCT

A SERIES

OF NEETINGS

ONE MEEK PRIOR

TO

EACH OUTAGE THAT COVERS

STATION POLICY.

AND NANAGEMENT

EXPECTATIONS.

ALL STATION PERSONNEL WILL ATTEND.

THIS

CONUNICATION WILL COVER THE FOl LOWING TOPICS:

0

0

0

p

0

0

0

PERSONAL SAFETY

ALARA

CONTANINATION CONTROL

NUCLEAR SAFETY

PROCEDURE

ADHERANCE

STATUS

CONTROL

VERIFICATION

PROBLEN IDENTIFICATION AND CORRECTIVE ACTION

ESF

ACTUATIONS

RADIOLOGICAL SHUTDOW PLAN

o

PREVENT AIRBORNE ACTIVITY IN TURBINE BUILDING AFTER BREAKING

VACUUM.

o

PREVENT AIRBORNE ACTIVITY ON 818'HEN

REMOVING THE VESSEL

HEAD.

o

OPERATION Of

RHR IN SHUTDOWN COOLING TO PREVENT HIGH RAD

LEVELS.

o

PREVENT AIRBORNE ACTIVITY WHEN HAIN TURBINE HOODS

ARE

REMOVED.

o

MINIMIZE REACTOR VESSEL CONDUCTIVITY SPIKE DURING SHUTDOWN.

....HP

IMPROVEMENTS'

INCREASED PERMANENT MANPOMER

FIRST LINE SUPERVISOR

HP SPECIALIST

TECHNICIANS

o

IMPROVED QUALITY OF

CONTRACT. TECHNICIANS

o

INCREASED USAGE OF

PERSONNEL

CONTAMINATION MONITORS

o

INCREASED USAGE OF

REAL TIME AIRBORNE RADIOACTIVITYMONITORS

o

LEVELIZED RESOURCES

INSIDE CONTAINMENT

UNIT i FQU'RTI-I REFUFLING Ai~D IJ'ASPECTIQJ'~ G<3 J~G:

MAN-REM GOALS BY TASIl'

~

>wl~

J

I

1

I

.I

I

I

1

1

vs

e

'Il

I

I

J

I

I

J

J

gng

22

1+

g,,0:i~

'j,ghJ W-

,,\\

"ig

. ',i~,,",P

.

Cr .'11++i<<

r p

=4qk-

A.g~~.

<<"-Fp

~ ~

S

i'h

~

h

hfhtf

<<g

~

~ J~

, ('(

1~

J,~>>"

.;v"

-j";,~

PPXO

)P

'

V'nh

tg

'.~L

SJ

ICS

~

+SJ4

a ~

La

[" 44La

~

~

I ~

!

t

I

~ I',M'i

~~ II

r

&Is "l

'~

~

I

1

r r

I

I

I

I

-n)

ct

1

r

I

i

I

I

I

~

I

..>qg

I

I tr

II 1

I:>>

l a. ~ II

~wI~aa

l~p

I

Q

I

L I,

1~ I.

@Jr

h

PI

IV

(0

~

1

( u,raa

..a

~

hI'I'r'.

(

~

.~ EP

0

a'.

I \\tr I

~

I

Qh',

Q t+

a ~

1

I,l.q J

a

f .)Xv-

~

I ~

I':I l. gC

L<NlT

1 FOLIRTI-I RE- LIFLII'l', AND INSPECTS ".'

" ":. E

MANREM

h

~

~

~

~

~

~

DESCRIPTION

OF

UPCONI NG OUTAGES

Ul-4R&IO

APRIL 1

JUNE 2,

1989

U2-3R&IO

SEPTENBER

9 NOVE%ER 10'989

NAJOR

SCOPE ACTIVITIES FOR THE OUTAGE INCLUDE:

1)

REACTOR VESSEL:

Ul ORRIO

U2 3RaIO

228

NEW FUEL BUNDLES

OFF-LOAD SCHEME

2Q CRD'S

15

LPRN STRINGS

200

NEM FUEL BUNDLES

OFF-LOAD SCHEME

20 CRD'S

20

LPRN STRINGS

2)

. BULK SURVEILLANCES:

APPROXIMATELY 350

SURVEILLANCES MILL BE PERFORMED

ON

BOTH UNIT'S INCLUDING AN INTEGRATED LEAK RATE TEST.

4 ~

/

l

'I

~

0

~

3)

INSERVICE INSPECTIONS:

o

APPROXIMATELY 500 (UNIT I)

AND 050

(UNIT 2)

EXAMINATIONS (INCLUDING VISUAL> SURFACE,

VOLUMETRIC, INSPECTION Of 15

CLASS 1,2i

AND 3

SYSTEMS),

4)

NAJOR PROJECTS/SPECIAL

.

~

~

e

~ \\

~

U1 4RRIO

'U2'RRIO

o

LOSS

OF OFFSITE

POWER

o

APPENDIX

R

NODS

o

HEAT EXCHANGER REPLACENENT

ECCS

ROON COOLERS

PIPE TUNNEL COOLERS

RECIRC

tttG SET

LO COOLERS

o

125 VOLT BATTERY REPLACENENT

o

CIRC

WATER EXPANSION JOINT C/0

o

T/G MAINTENANCE %DS

o

DRYMELL COOLING

o

GENERATOR SPAN PROTECTION

,

o

VALVE UPGRADE PROJECT

o

RHR

WATERHANNER CLOSEOUT

(HPCI

CUT & CAP PANEL L/0

8 CABLE DETERMS)

o

RECONBINER PLUG VALVE

X

X

X-C

X

X-C

X

X

X

~

X

X

X

X

X

X

X

X

X

X

,X

X

NOTE:

X-C DENOTES

CONTINGENCY WORK

.

'

5).

..NAJOR NAINTENANCEWORK'I

4RRIO

U2 3RRIO

0

0

0

0

0

0

0

0

0

VALVE INSPECTION,

REPAIR

OR

CHANGEOUT

RCIC TURBINE SHAFT SEAL REWORK

HPCI TURBINE INSPECTION

INSTALL VENTS

AND DRAINS ON

HV151F015ASB

(CONTINGENCY)

INSPECT

AND CLEAN ONE

RHR

HEAT EXCHANGER

RENOVE AND REINSTALL 16 NSRV'S

FOR TESTING

AND NAINTENANCE

VERIFY SEIS

DATA BASE

TUBE SHEET COATINGS

. FEEDWATER PUNP

ALIGNMENT

X

X

X

X

X

X

X

X

X

X

X

X

~4

6)

BULK CWORK

P

"..."...: .:; -::...0 -;

.RELEASE.:AND 'CONPLETION OF:AN .ESTIMATED'3;420....:,

RELATED MORK DOCUNENTS

(END OF OUTAGE TOTAL).

0

IMPLEMENTATION OF

APPROVED

NOD IFICATIONS.

UNIT 1

CONTAINS 55

APPROVED

NODS,

OF MHICH 8

ARE

CLASSIFIED AS CONTINGENCY.

UNIT 2 CONTAINS 47

MODS,

OF MHICH 3 ARE CLASSIFIED AS CONTINGENCY.

UNIT 1

4RRIO

.

TlTLE:

CRITICAL PATHS

CP-1

WEEK 1

WEEK 2

WEEK 3

WEEK 4

WEEK 5

WEEK 6

WEEK 7

WEEK 8

WEEK 9.

SHUTDOWN

CG

VESSEL DISASSEMBLE

STARTUP

CIOSE

C NT~NME

1DSEOUT R TEST

I

I

I

I

I

I

I

I

I

I

'ORE OnmAO

VBSSEL REASSENSfX

I

LPRM CHANGEOUT

RIIR TESTING

I

I

I

I

7

RIIR DIV I MAINTdc MODS

I

I

I

I

RHR DIV II MAINTR MODS

I

I

I

I

I

I

I

I

I

I~CRD fRICOON 'IXSTING

I

I

RIIR DIYII

RESIRATION

0

P

I

CORE REIDAD

1ST CRITICAL PATH

2ND CRITICAL PATH

RESOURCE

PLAN

'OTH OUTAGES

275,000

MHRS DIRECT-EXPENSE

50,000

NHRS DIRECT CAPITAL

MAJOR CHALLENGES

o

SCOPE

CONTROL

o

MSIV REPAIRS

. o

SNUBBER TESTING RESULTS

o

MEETING GOALS OF:

IjNIT I

I]NIT 2

MAN-REM

390

295

LOST, TIME ACC IDENTS

0

0

NO LOST TIME ACCIDENTS

0

0

PERSONAL CONTANINATION REPORTS

60

60

ESF

ACTUATIONS

OVERTIME

35X

SUNNARY

o.

WE HAVE PREPARED

SAFELY WITH ALARA

o

WE HAVE MADE IMPROVEMENTS

o

WE ARE READY

o

INDEPENDENT REVIEW

OUTAGE SAFETY

NUCLEAR SAFETY ASSESSMENT

GROUP

(NSAG)

PHILOSOPHIC OVERVIEW

SPECIFIC

EXAMPLES

PPRL

APPROACH IS DEFENSE

IN DEPTH

SAFETY IS BUILT INTO AN OUTAGE BY SCHEDULING KEY ACTIVITIES TO

NEET SAFETY REQUI RENENTS;

o

TECHNICAL SPECIFICATIONS

o

PPaL

POLICIES

SAFETY IS

A LINE FUNCTION,

o

OUTAGE PLANNING

o

OPERATIONS

NSAG PROVIDES

AN INDEPENDENT REVIEM AND OVERSIGHT.

o

OUTAGE PLAN

o

OUTAGE EXECUTION

SAFETY LIMITS

COND ITION 4

CONDITION 5

TEMPERATURE

PRESSURE

LEVEL

POWER

200

F

1325

PSIG

ABOVE TOP

OF

ACTIVE FUEL

SHUTDOWN MARGIN

140

F

15 PSIG

ABOVE TOP

OF

ACTIVE FUEL

SHUTDOWN MARGIN

0.38

'

0.28

K

0,38

K

0.28

K

CONTAINMENT SECONDARY CONTAINMENT REQUIRED

WHEN POSSIBILITY

EXISTS OF RELEASE OF RADIOACTIVITYTO THE PUBLIC.

o

WHEN HANDLING IRRADIATED FUEL

o

WHEN CORE ALTERATIONS ARE IN PROGRESS

o

WHEN OPERATIONS WITH POTENTIAL FOR DRAINING THE REACTOR

VESSEL

ARE IN PROGRESS

(OPDRVs)

BASIC REQUIREMENTS

CORE

COOI ING

o

MEANS OF

REMOVING DECAY HEAT MUST ALWAYS EXIST,

o

MEANS OF CIRCULATING WATER IN THE REACTOR VESSEL

MUST

ALWAYS EXIST.

MAKEUP WATER

o

.

MEANS OF ADDING WATER MUST ALWAYS EXIST:

ECCS

SYSTEM OR SYSTEMS

OR

VOLUME IN CAVITY SPENT

FUEL POOL

COMPLEX

CONTROL OF REACTIVITY

o

CONTROL RODS

o

SLC SYSTEM

o

SHORTING BARS IN SRMs,

ETC.

SECONDARY CONTAINMENT

o

BUILDING MUST BE INTACT

o

SGTS

MUST BE OPERATIONAL

FUNDAMENTAL PPRL POLICIES

I,

WORK WILL BE DONE BY DIVISIONS

2.

CORE COOLING:

o

REQUIRED SYSTEMS

PLUS

ONE

o

ABNORMAL METHODS TESTED PRIOR TO DISABLIt'lG THE PRIMARY

SYSTEM

CORE COVER:

o

REQUIRED

ECCS

SYSTEMS

PLUS

ONE

o

OPDRVs STRICTLY CONTROLLED

o

GATES TO REACTOR CAVITY AND TO CASK STORAGE PIT IN PLACE

WHEN POSSIBLE

o

BLANK FLANGES

ON

OPEN

COMPONENTS

o

DOWNCOMER COVERS

REMOVED

REACTIVITY CONTROL

o

COMPtETE

CORE OFFLOAD NO SHUFFLE

o

RELOAD PLAN CHECKED STEP

BY STEP

FOR

SHUTDOWN MARGIN

o',

CORE VERIFICATION BEFORE

NEW FUEL IS

ADDED

o

COMPREHENSIVE REACTIVITY CONTROl

INSTRUCTION

5.

NO FUEL HANDLING WHEN MAIN STEAM LINES ARE PRESSURIZED

6,

CRITICAL FUNCTIONS

SHOWN

ON

A DETAILED OUTAGE SCHEDULE

o

CORE

COOLING

.o

ECCS

o

SECONDARY CONTAINMENT

7.

COMPREHENSIVE

INDEPENDENT REVIEW

Rx

SHU

COND

COND

DOMN

IV,

V

FUEl

HEAD

NSL

CAVITY

GAl i

OFF-

OFF

PLUGS

FLOODED

OUT

LOADED

SERVICE

GATES

MATER

GATES

FUEL

IN

OUT

OUT

LOAD

200

F

100

F

SDC 2

CONDENSER

+ I

=

SRV/CS/SPC

+ /

HPCI/RCIC/SPC

/7

I.

I

'CCS

NOT

REQ

SDC

1

CS/SRV/SPC

CONDENSER

FLOODING

BOILING

SDC

1

FLOODING

BOILING

SDC

1

A

FPC-OUT

+'PC-OPR

RHR OUT FPA

RHR OPR

FPA

BOILI%

ONLY TS

LINIT

IS

22'VER

SPENT

FUEL

DESIGN

'125

F

ADNIN

110

F

I

I

I

COND V

140

F

FPC-OUT

rl

FPC-OPR

~ l

RHR OPR-FPA

BOILING

FPC-OPR

fl

RHR OPR-FPA

+ ]

BOILING

SDC 2

0

FPC-OPR

+ I

RHR OUT-FPA

RHR OPR-FPA

REtCYABI.E khTER TIGHT GATES

~IT 2 ~NI CAVITY

lhIT 2 OeBT I SEIARATINfm

IjHIT 2 $I EHT Fm POGI.

Qgg $TGRAGE PIT

UHn l Sme FuEL Pm

lan

1 Recne Q.vITT

lhn i DImII / $EI AIIATIN

818'LEVATION

REFUEL ING FLOOR

SPENT FUEL POOLS CONNECTED VIA THE CASK'TORAGE PIT

FIGURE 5.

J

HEAT El<CHANGER

FUEL .POOL

COOLING

PUMP

F I 6 .

4 .

SPENT

FUEL POOL

A-5

~TA OFFICE "I'"D tEMPORARY BRIDGE FUEL POOL. TEMPS

AND 'RVICE SVATER TEMPERATURE

haaaa0>>

Nl

NOl MNGli.>

95

4Q

~ 4

S5

LJ

CL

75

ARNL

6Q

Legend

STA OFFICE POOI. TEMP

BRIDGE TEMPORARY T C PGQL

SER'!ICE MATER TCMP

25

24

25

26

27

MARCH

28

29

50

3)

1

KEEP

CORE

COVERED

'i%>

l CR

~

~

(

I

I

I

I

l

1

j

i

I

(

(

l

~

(

(

(

(

r

(

(

(

I

I

(

(

~

I

(

~

I

l

(

l

(

~

I

~,

(

~

I

4

4

)

Ql

I

4

4

I

I

~

4

~

I

)

I

~

I

i j,

~

4

I

I

I

i

)

I

I

4

)

t

4

4

4I

I

I

4

(

"

i

I

I

I

i

4

I

~

~

i

I

~

I

t

KEY ELENENTS

1.

IDENTIFY AND CONTROL DRAINAGE PATHS

2.

PRESERVE

RHR INTERLOCKS

CONTROL THE GATES

DOMNCONER COVERS

RENOVED

PROCEDURE AD-QA-326 OPERATIONS MITH POTENTIAL FOR DRAINING THE

REACTOR VESSEL/CAVITY.

SHUTDOWN ISSUES

1,

OFFGAS

SYSTEMS.

2.

LEAKING FUEL

o

GAS

(XENON)

o

CRUD

o

IODINE

3.

AUXILIARYBOILERS

BOTH IN SERVICE.

RADIATION EFFECTS

OF

PROTRACTED OPERATION.

5.

RETENTION OF

RWCU IN SERVICE.

6.

WATER CLARITY/RADIATIONON 818.

7.

NECHANICAl

VACUUM PUMP.

8.

IF COOLING IS LOST

SECONDARY CONTAINMENT MUST BE

ESTABLISHED,

9.

PURGE

OF

REACTOR VESSEL - HEAD DRYHELL HEAD CONES OFF.

10.

RADIATION EFFECTS

OF FUEL ELEMENT FAILURES.

SUNNARY

1.

PP8L

APPROACH IS DEFENSE

IN DEPTH.

2.

SAFETY IS BUILT INTO AN OUTAGE BY SCHEDULING KEY ACTIVITIES

TO NEET THE SAFETY REQUIRENENTS.

POLICIES

HAVE EVOLVED TO ENHANCE SAFETY.

'SATISFYING THE TECHNICAL SPECIFICATIONS IS NOT ENOUGH TO

ENSURE

OUTAGE SAFETY.

5.

SAFETY IS

A LINE FUNCTION.

6.

NSAG FUNCTION IS TO OBSERVE

AND REFLECT.

OUTAGE READINESS

A RADIOLOGICAL PERSPECTIVE

ANNUAL

ASSESSMENTS

OUTAGE PERFORMANCE

REVIEWS

PROJECT

AND

DESIGN

REVIEWS

OUTAGE READINESS

REVIEWS

ANNUAL EXPOSURE

ESTIMATES/GOALS

EARLY VIEWS AND REVIEWS

o

PROJECT

REVIEWS

PRELIMINARY EVALUATIONS

F I NA'L EVALUATIONS

o

DESIGN

REVIEWS

ZONE Z WORK

EXPECTED

CUMULATIVE DOSE

> 10 MAN-REM

ON

REQUEST

YEAR IN PREVIEW

ANNUAL EXPOSURE ESTIMATE AND GOAL

o

REVIEW OF

PLANNED WORK

o

REVIEW OF

JOB

HISTORY

BUILD ON PREVIOUS

ALARA INITIATIVES

o

DISCUSSIONS

WITH WORK GROUPS

o

DEVELOPMENT OF DRAFT ESTIMATE/GOAL

o

DISCUSSIONS

WITH WORK GROUPS

o

REVIEW WITH STATION ALARA COMMITTEE

o

,,

CONCURRENCE

OF STATION AND CORPORATE

MANAGEMENT

1989 NN-REM EXPOSURE ESTINKS AND GOALS

ROUTINE OPERATIONS

'PLANT OPERATIONS

ROUTINE NINTENANCE

DECONTNINATION

RADWASTE OPERATIONS

FORCED OUTAGES

NN-REN

ESTINTE

45

97

18

13

ALARA GOAL

40

88

10

16

13

TOTAL

185

167

NON-OUTAGE MODIFICATIONS

UNIT 1 OUTAGE ACTIVITIES

tmIT 2 OUTAGE ACTIVITIES

25

430

'30

23

390

295

TOTAL 1989 ESTINIE:

ALARA GOAL:

TLD GOAl:

970

NN-REN

'75

NN-REN

720

NN-REN

OUTAGE IN PREVIEM

o

DISCUSSIONS

ABOUT WORK PLANNING AND WORK'SCOPE

CHANGES

o

REVIEWS WITH STATION ALARA COMMITTEE

o

OUTAGE READINESS MEETING

o

POTENTIAL GOAL REVISION - MEEK 1

UNIT

1

FOURTH REFUELING

& INSPECTION

OUTAGE

MAN-REM GOAL

BY TASK

TASKS

MAN-REM GOAL

5

OF

GOAL

ISI ACTIVITIES

85

22

SNUBBER TESTING

54

14

VALVE REPACKS

8I

REWORKS

53

14

GENERA

ENTRY

5

WORK

50

13

DW SUPPORT

SERVICES

CRD

5

UNDERVESSEL

WORK

MODIFICATIONS

45

33

21

REFUEL

FLOOR ACTIVITIES

22

MISC MAINTENANCE

L IMITOR(UE TESTING

5

REPAIRS

RWCU

WORK

10

LLRT'S

3

HEAT EXCHANGER INSPECTIONS

1.5

TURBINE WORK

0.5

TOTAL

390

UNIT

1

FOURTH

REFUELING

AND INSPECTION

OUTAGE

MAN-REM GOAL

BY

COST

AREA

COST

AREA

DEPARTMENT

MAN-REM

GOAL

PERCENT

OF

GOAL

430

451

452

460

461

462

463

464

465

467

468

471-480

551-555

VARIOUS

EQUALITY'SSURANCE/CONTROL

NUCLEAR SERVICES (ISI)

NUCLEAR TRAINING

INSTRUMENTATION 5

CONTROL

HEALTH PHYSICS

TECH

GROUP

MAINTENANCE

LABOR SUPPORT

(DECON)

OPERATIONS

'PLANT MANAGEMENT

OUTAGE

MANAGEMENT

INSTALLATION ENGINEERING

NPE

( INCL RESIDENT

ENG)

EKS

CONST

( INCL CATALYTIC)

OTHER

12

20

0.1

31

28.

0.1

0.1

260

8.6

.03

0.5

1.5

.03

.03

.25

.25

67

2.5

TOTAL

390

IN-PROGRESS

REVIEW

o

DAILY RWP

STATUS

REVIEW

o

DEVELOPMENT OF GRAPHICS-EXPOSURE

BY COST

AREA AND BY TASK

o

DISCUSSIONS

WITH STATION ALARA COMMITTEE

1989

MAN-REM GOAL BY COST AREA

~ DATA AS OF FEBRUARY 28,

1898.

ACIUAL

PERCENTAGE OF

MAN-REM

MAN-REM GOAL

430

451

452

459

460

471-479

551-555

VARIOUS

23. 000

NUCKZAR SERVICES

( ISI )

30. 000

NUCLEAR TRAINING

PERSONNEL

Ec ADMIN

INC

HEALTH PHYSICS

CHEMISTRY

TECH GROUP

0. 400

0.400

25.000

95. 000

6. 000

6.000

MAINTENANCE

60.000

DECONTAMINATION

OPHVZIONS

45.000

38.000.

RW HKCKSSING PERSONNEL

9.000

IEG

NPE (ALLEÃXU%)

NPE - RE

0.300

0.300

3.000

2.000

2.000

~

EErS CONSTRUCTION (ALL)

525.000

5.300

0. 531

0.575

0;000

0.066

1.443

6.323

0.851

0.141

6.340

3.263

2.843

0.295

0.000

0.005

0.220

0.315

0.309

7.628

0.000

2.31

1.92

0. 00

16. 50

5.77

'.66

14.18

2.35

10.57

7.25

7.48

3.28

0.00

1.67

7.33

15.75

15.45

1.45

0. 00

'OTALS

875.000

31.148

NOIE:

ALL DATA BASED ON SRD EXP'OSURE

CLICJUUOO WWfCN10 OCR

COP 1tCAW. IL0

OCR CO CCa ICOaaaCV CL CaOS

~

4',P

~'yand

~ ~edaC

~H

EXPOSURE

BREAKDOMH BY TASK - I 5 C

Job Descri tion

~Februar

Man-Rem

X of Total

Man-Rem

Year To DateI of

Total

Man-Rem

Man-Rem

Gen Entry/Inspection

0.054

IIlC Surveillances

0.380

(485 Rack,

Scram Disc Vol.,

Smoke Detectors)

10

75

0.164

ll

0.700

49

Misc. Valve Work

IRMs

Other Misc. work

0.005

0.000

0.070

0

r ~

14

0.005

0.489

0.085

0.509

1.443

YEAR IN REVIEW

o

PARTICIPATION IN OUTAGE CRITIQUES

IDENTIFICATION OF

NEW INITIATIVES

PLANNING FOR,

TRACKING OF INITIATIVES

DEVELOPMENT OF

ISSUES

FOR STATION ALARA COMMITTEE

o

ANNUAL ALARA ASSESSMENT

PERSONNEL

EXPOSURE

TASK ANALYSIS

700

700

BOO

1988 COLLECTIVE MAN-REM EXPOSURE

638

600

600

0K

400

C

~~I 300

E

O

200

100

0

Legend

ALARAGOAL

ACTUAL

II

II

I

I

I

I

I

I

I

I

I

I

616

600

K

400

C

8

~~

300

e

E

O

200

100

0

J

F

M

A

M

J

UNIT 2-2RIO

J

A

S

0

. N

0

1200

1137

COLLECTIVE RADIATIONEXPOSURE

BWR AVERAGE

1200

1000

1003 .-

Legend

GG INDUSTRY

FEB SUSQUEHANNA

1000

800

L

CL

E

eoo

IC

400

784

553

622

414

521

547

258

~~

800

L

G.

E

coo

KIC

tg

4O0

200

200

1983

1984

1985

Year

. 1986-

'I987

1988

0

12

COLLECTIVE RADIATIONEXPOSURE

THREE YEAR AVERAGE DISTRIBUTION FOR BWRs

785-6 88

12

I ~

10

8

C

7

0

lD

6

Z

4

Best

Quartile

356

Susquehanna

l

328

>l

7ll

Median

584

I

I

I

4

25 Units

10

8

~ 0t:

7

0

LS

6

4 Z

0

0

0

0

0

0

200

400

BOO

800

1000

00"

1800

180

1200

14

0

2000

Man-Rem Per Unit

Inn

Sr'VERAGE

0.379

0.88

ALIKEEXPOSUIK PER NRIK( (%EN)

1987

IM)USIRY

AUERA6E

410

WORKERS WmI REPORlH) EXPOSSK:

68EATER RAN 10 %PI.

700

700

600

~<

00

Rl

2000-2600

p nItj

2600-2000

100-

0

Cumulative Exposure (mrem)

PORjLATIN EXPOSUIK TRENDS

LESS THAN 10 rem

10 TO 200 mm

NEATER TNN 2 ~

1788

1501

1518

CRD

IMPROVEMENT ITEMS

FOR UNIT 1

SECOND

AND UNIT 2 FIRST:

MOCK-UP TRAINING IN TEAMS

USE

OF DEDICATED EXPERIENCED

CREWS

IMPROVED UNDERVESSEL

DECON

RESOLVED EQUIPMENT PROBLEMS

CAROUSEL WINCH AND SHOOT

OUT

STEEL

CART

SCHEDULING CHANGES

COMPLETE TESTING PRIOR

TO REINSTALLATION

. OF

INTERFERENCES

COMMUNICATION UNDERVESSEL

CAMERA

R

IMPROVED HEADSETS

FOR UNIT 1 THIRD AND UNIT 2

SECOND:

CRD FLANGE SHIELDS

CHANGES

IN THE UNCOUPLING SCHEDULE

REMOTE UNDERVESSEL TOOLING (ALSO CHANGED MOCK-UP AT TRAINING

CENTER)

REBUILD ROOM

UPGRADES

FIRST

OUTAGE

SECOND

THIRD

RENOVAL/REILACENENT

UNIT 1

UNIT 2

1.68

0.97

0.95

0.67

0.59

REBUILD

UNIT 1

UNIT 2

. 0.35

0.27

0.35

0.27

0.33

TOTAL

UNIT 1

UNIT 2

2.03

1.24

1.30

0.94

0,92

HEALTH PHYSICS

READINESS

o

PEOPLE

INCREASED

PERMANENT MANPOWER

LOW TURNOVER)

SEASONED STAFF

CONTRACTOR TECHNICIANS-SUFFICIENT NUMBERS

AND ONSITE

o

TRAINING

HIGH PRIORITY

IMPROVED CONTRACTOR TECHNICIAN TRAINING

TRAINING CENTER

CONTROL POINT

o

PROGRAMS

AND PROCEDURES

PLANNING FOR

PPRL

LEAD TECHS

AT CONTROI

POINTS

PROCEDURES

REVIEW COMPLETED

CONTROL POINT CONDUCT PROCEDURES

IN-PLANT OVERSIGHT EMPHASIS

ASSISTANT FOREMEN

SPECIALISTS

RESOURCE

SCHEDULING UPGRADE

RADIOLOGICAL PERFORMANCE

STANDARDS TRAINING-EACH SECTION

CONTAMINATION CONTROL

RADWASTE MINIMIZATION

HOT PARTICLE CONTROLS

REFUEL. FLOOR

o

FACILITIES AND EQUIPMENT

PERSONNEL

AND TOOL CONTANINATION NONITORS

ALARMED UNAUTHORIZED ACCESS

POINTS

DAM PROCESSING

TRAILER

UNIT 2

ACCESS

STRUCTURE

IN CONSTRUCTION

DRYMELL AND OTHER AIR NONITORING

o

ALARA

SHUTDOWN PLAN

FLUSHES

SHIELDING

INCLUDES GENERIC DRYMELL SHIELDING

PREJOB

REVIEMS-

IN PROGRESS

REVIEWS

'

SUMMARY

o

ACHIEVEMENTS IN PROJECTS

PLANNING

o

LESSONS

LEARNED FROM SITE EXPERIENCE

o

AVAILABILITYOF

INDUSTRY COMPARISONS

o

RELATIONSHIPS WITH WORK. GROUPS

o

.AWARENESS

OF

WORK PRACTICES

AND INITIATIVES