Forwards Safety Insp Rept 50-387/89-01 & 50-388/89-01 on 890101-0204.Enforcement Conference Scheduled for 890321 to Discuss Circumstances Associated W/Exceeding Allowable Cooldown Rate After Reactor Trip on 890112
ML17156B060
Person / Time
Site: Susquehanna  
Issue date: 03/08/1989
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17156B061 List:
References
EA-89-042, EA-89-42, NUDOCS 8903210198
Download: ML17156B060 (4)


See also: IR 05000387/1989001

Text

AC CE1ZRATED

DISTKBUTION

DKMONSTRXTIO'.i

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RZDS)

ACCESSION NBR:8903210198

DOC.DATE: 89/03/08

NOTARIZED: NO

DOCKET

N

E'ACIL:50-387 Susquehanna=Steam

Electric Station, Unit 1, Pennsylva

05000387

50-388

Susquehanna

Steam Electric Station, Unit 2, Pennsylva

05000388

AUTH.NAME

AUTHOR AFFILIATION

KANEiW.F.

Region 1, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

KEISERgH ~ W

Pennsylvania

Power &,Light Co.

SUBJECT:

Forwards Safety Insp Rept 50-387/89-01

6 50-388/89-01

on

890101-0204.Enforcement

conference

scheduled for 890321.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR l

ENCL L

SIZE:

~ +J 8

TITLE: General

(50 Dkt)-Insp Rept/Notice of Viol.ation Response

NOTES:LPDR

1

cy Transcripts.

LPDR 1 cy

Transcripts.

05000387

S

05000388

RECIPIENT

ID CODE/NAME

PD1-2

PD

INTERNAL: ACRS

AEOD/DEIIB

NRR SHANKMANgS

NRR/DLPQ/PEB

11

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ZLRB12

OE LZEBERMAN J

G

ILE

0

EXTERNAL: LPDR

NSIC

NOTES:

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

2

2

RECIPIENT

ID CODE/NAME

THADANI~M

AEOD

DEDRO

NRR/DEST DIR

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC/HDS2

RGN1

FILE

01

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

h

D

NVK 'ZO ALL RIDS" RECZFGKIS:

PIZASE HELP US TO REDOCE KLSTE!

CONTACT 'IHE DOCUMERZ CONZROL DESK,

RXN Pl-37

(EZZ. 20079) K) EZJKBQQS ACR NAME PMM DISTRIBOTICN

LTST8 PDR DOCUMENTS RXJ DON~T NEZD!

S

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

27

ENCL

27

$

Docket Nos.

50-387

50-388

EA No.

89-42

Pennsylvania

Power and Light Company

ATTN:

Mr. Harold W. Keiser

Senior Vice President - Nuclear

2 North Ninth Street

Allentown, Pennsylvania

18101

Gentlemen:

Subject:

NRC Region I Combined Inspection

Report Nos.

50-387/89-01

and

50-388/89-01

This refers

to the

routine safety

inspection

conducted

by inspectors

of this

office on January

1,

1989 - February

4,

1989, at the Susquehanna

Steam Electric

Station,

Salem

Township,

Pennsylvania.

The

results

are

documented

in

the

enclosed

inspection

report.

The inspection

covered plant operations,

surveil-

lance

and

maintenance

activities for both units.

At the

conclusion

of

the

inspection,

Mr. F.

Young summarized

the inspection findings to Mr. R. Byram and

other members of your staff.

\\

Based

on the results

of this inspection, it appears

that certain plant evolu-

tions were not conducted

in full compliance with NRC requirements.

Of particu-

lar concern

were

the

circumstances

associated

with exceeding

the

allowable

cooldown rate after the reactor trip on January

12,

1989.

You did not identify

the excessive

cooldown rate until several

days later.

The failure of both the

shift crew

and your post-trip

review process

to recognize

the

cooldown rate

demonstrates

the

need for prompt evaluation

and corrective action,

especially

when

considered

collectively with several

other operating

errors that led to

recent

unplanned trips and

ESF actuations.

Although

we

are

not concerned

with your overall ability to operate

the plant

safely,

we view the

issues

associated

with these

events

to

be significant and

are

considering

further

enforcement

action.

Accordingly,

an

Enforcement

Conference

has

been

scheduled for 1:00 p.m.

on March 21,

1989, to discuss

these

matters with you in the

NRC Region I Office in King of Prussia,

Pennsylvania.

During the Enforcement

Conference,

please

be prepared

to address

(1) the safety

significance

and root

cause

of the

event,

(2) broader

implications

of this

event

and other

operational

events,

and (3) your corrective

actions

taken or

planned,

including

measures

to

prevent

recurrence.

We will

forward

an

appropriate notification of enforcement action following the conference.

gcyp3PiOi98 8

pgp

>DOCH

0>'O p~U

8

OFFICIAL RECORD

COPY

CIR SUS 89-01

0001.0.0

03/07/89

ni

Pennsylvania

Power and Light Company

2

MAR 08 lSSS

Your cooperation is appreciated.

Sincerely,

liam F.

Kan

,

iree or

Division of Reactor Projects

Enclosure:

NRC Region I Combined Inspection

Report Nos.

50-387/89-01

and 50-388/89-01

cc w/encl:

A.

R. Sabol,

Manager,

Nuclear guality Assurance

E. A. Heckman,

Licensing Group Supervisor

R.

G.

Byram, Superintendent

of Plant - SSES

S.

B. Ungerer,

Manager, Joint Generation

Projects

Department, Atlantic Electric

R. J.

Benich, Services

Project Manager,

General Electric Company

B. A. Snapp,

Esquire, Assistant Corporate

Counsel

H.

D. Woodeshick,

Special Office of the President

J.

C. Tilton III, Allegheny Electric Cooperative,

Inc.

Public Document

Room

(PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

Commonwealth of Pennsylvania

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

ORNA (w/o encl)

W. Russell,

RA

J. Allan,

DRA

J. Gutierrez,

RC

W. Kane,

DRP

J. Wiggins,

DRP

R. Blough,

DRP

J.

Lyash,

DRP

M. Kohl,

DRP

S. Juergens,

DRP

J. Durr,

DRS

J. Strosnider,

DRP

R. Gallo,

DRS

R. Bores,

DRSS

D. Holody,

EO (EA No, 89-,42)

J.

Lieberman,

OE

L. Chandler,

OGC

S.

Varga,

NRR

M. Thadani,

NRR

OFFICIAL RECORD

COPY

CIR SUS 89-01

0002.0.0

03/01/89'

Pennsylvania

Power and Light Company

3

MAR 0": 1988

RI: DRP

FYoung/mjd

03/ j /89

RI:ORP

RBlough

03/0 /89

I:DRP

JWiggins

03/+89

03/C/89

OFFICIAL RECORO

COPY

CIR SUS 89-01 " 0003.0. 0

03/01/89