ML17156A439
| ML17156A439 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 03/14/1988 |
| From: | Wiggins J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17156A440 | List: |
| References | |
| NUDOCS 8803210021 | |
| Download: ML17156A439 (4) | |
See also: IR 05000387/1988004
Text
ACCEIZMTED
DISTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ESSION NBR:8803210021
DOC.DATE: 88/03/14
NOTARIZED: NO
DOCKET
ACIL:50-387 Susquehanna
Steam Electric Station, Unit 1, Pennsylva
05000387
50-388
Susquehanna
Steam Electric Station, Unit 2, Pennsylva
05000388
AUTH.NAME
AUTHOR AFFILIATXON
WIGGINS,J.T.
Region 1, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
KEISER,H.W.
Power
& Light Co.
SUBJECT:
Forwards Safety Insp Repts 50-387/88-04
& 50-388/88-03
880104-0213
DISTRIBUTION CODE: IEOID
COPIES
RECEIVED: LTR
J
ENCL J
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of VioTation Response
NOTES:1cy NMSS/FCAF/PM.
LPDR 2cys Transcripts.
1cy NMSS/FCAF/PM.
LPDR 2cys Transcripts.
on
R
Zk l3
05000387 ~
05000388 8
RECIPIENT
ID CODE/NAME
PD1-2
INTERNAL: ACRS
DEDRO
NRR/DLPQ/PEB11B
NRR/DOEA DIR11E
NRR/DREP/RPB10A
e
NRR/PMAS/ILRB12
OGC 15-B-18
RES/DRPS
DXR
EXTERNAL: LPDR
NOTES:
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
2
2
1
1
1
1
1
1
2
2
1
1
RECIPIENT
ID CODE/NAME
THADANI,M
NRR MORISSEAU,D
NRR/DLPQ/QAB10A
NRR/DREP/EPB10D
NRR/DRIS DIR9A2
XZ,J
REG FIL
02
G
FXLE
01
NRC PDR
COPIES
LTTR ENCL
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sj
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
28
ENCL
28
MAR 14 1988
Docket Nos."50:-'387
50-388
Power 5 Light Company
. ATTN:
Mr. H.
W. Keiser
Vice President
Nuclear Operations
2 North Ninth Street
Al 1 entown,
Penn syl vani a
18101
Gentlemen:
Subject:
Routine Resident
Inspection
Report
Nos. 50-387/88-04;
50-388/88-03
This
refers
to
the
routine
resident
safety
inspection
conducted
by Messrs.
F.
Young and J. Stair of this office on January
4,
1988 - February
13,
1988, at
the
Susquehanna
Steam
Electric
Station,
Salem
Township,
The
inspection
covered
plant
operations,
surveillance,
maintenance,
system
walkdown,
and licensee
events.
Based
on the results of this inspection, it appears
that one of your activities
was not conducted
in full. compliance with NRC requirements,
as set forth in the
Notice of Violation, enclosed
herewith
as
Appendix
A.
Specifically,
in
one
instance
there
was
a failure to properly post
a high radiation
area.
You are
required
to
respond
to this letter;
and,
in
so
doing
you
should
follow the
instructions
in Appendix A.
Your cooperation with us is appreciated.
Sincerely,
James
T. Wiggins, Chief
Reactor Projects
Branch
No.
3
Enc l o
sure's',!~b;'.
Appendix.'A, Notice of Violation
2.
Combined
NRC inspection
Report Nos. 50-387/88-04;
50-388/88-03
OFFICIAL RECORD
COPY
CIR SUS 88 04/03
0001
0 0
8803220021
8803i4
ADOCK 05000387
O
Power
& Light Company
MAR ie 1888
cc w/encls:
A.
R. Sabol,
Manager,
Nuclear Quality Assurance
E. A. Heckman,
Licensing Group Supervisor
R.
G. Byram, Superintendent
of Plant
W.
H. Hirst, Manager, Joint Generation
Projects
Department, Atlantic Electric
R. J. Benich, Services
Project Manager,
General
Electric Company
B.
D. Kenyon, Senior Vice President - Nuclear
B. A. Snapp,
Esquire, Assistant
Corporate
Counsel
H.
O. Woodeshick,
Special Office of the President
J.
C. Tilton III, Allegheny Electric Cooperative,
Inc.
Public Document
Room (PDR)
Local Public Document
Room (LPOR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
Commonwealth of Pennsylvania
bcc w/encls:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encls)
A. Blough,
ORP
L. Ooerflein,
ORP
R. Bores,
DRSS
Qj"
RI:ORP
SYoung/mjd
3/ I//88
RI:DRP
RBlough
3/ Jg /88
OFFICIAL
RI:DRSS
MShanbaky
~5
3////88
RECORD
COPY
RI: DRP
JWig ins
3/i
88
CIR SUS 88-04/03 " 0002.0.0
03/11/88
APPENDIX A
Power
and Light Company
Susquehanna
Units No.
1 and
2
Oocket
Nos.
50-387;
50-388
License
Nos.
As
a result of an inspection
conducted
on January
12,
1988,
and in accordance
with the
NRC Enforcement Policy ( 10 CFR 2, Appendix C), the following violation
was identified:
Technical
Specifications
Section
6. 12. 1 states
that "... each high radia-
tion area
in which the intensity of radiation is greater
than
100 mrem/hr
but less
than
1000 mrem/hr shall
be barricaded
and conspicuously
posted
as
a high radiation area...".
Contrary to the
above,
on January
12,
areas
with dose
rates of up to 400
mr/hr, which constitute
were not posted
as required.
Specifically,
those
areas
immediately adjacent
to the
main turbine front
standards
for both Units
1 and
2 were not posted.
This is
a Severity Level
IV Violation (Supplement
IV).
Pursuant
to the
provisions
of
Power
and Light is
hereby
required
to
submit to this office within
30
days
of the date of the
letter transmitting this Notice,
a written statement
or explanation
in reply,
including:
(1)
the
reason
for the violation if admitted;
(2) the corrective
~ steps
which have
been
taken
and the results
achieved;
(3) the corrective
steps
which will be
taken
to avoid further violations;
and (4) the date
when full
compliance will be achieved.
Where
good
cause
is
shown,
consideration will be
given to extend this response
time
h
+1
I
f
,JQ
+vs
8803210023
8803l4
ADOCK 05000387
O
OFFICIAL RECORO
COPY
CIR SUS 88-04/03
0003.0.0
03/14/88