Informs That Completion of Review Re Util Proposed Tech Specs Concerning Operability of Scram Discharge Vol Vent & Drain Valves by 870905 Impossible,Due to Generic Nature of Proposal & Lack of Clarity in Generic Safety Evaluation
ML17146A929
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/01/1987
From: Thadani M
Office of Nuclear Reactor Regulation
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
References
TAC-65169, TAC-65170, NUDOCS 8709080331
Download: ML17146A929 (7)


Text

Q

<P,R RfgI pC~

+

0 ly y

pX

++**+

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 September 1> l987 Docket Nos.

50-387/388 Mr. Harol d W.

Kei ser Vice President Nuclear Operations Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101

Dear Mr. Keiser:

SUBJECT:

REQUEST FOR TECHNICAL SPECIFICATION CHANGES FOR SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVE SURVEILLANCE {TAC NOS.

65169 AND 65170)

RE:

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS I AND 2 In the subject request, you proposed a change to the Technical Specifications for the Susquehanna Steam Electric Station (SSES)

Units I and 2 with respect to the Scram Discharge Volume (SDV) surveillance requirements.

Specifically, you requested that operability of the SDV vent and drain valves be demonstrated during reactor shutdown conditions instead of the current requirement of less than or equal to 50% control rod density.

We have reviewed your request and also compared the Technical Specifications for SDV surveillance for several Boiling Water Reactors (BWR) with designs similar to SSES, Units I and 2.

We find that, among the BWRs reviewed, the requirements are inconsistent relative to the conditions that must exist when conducting the SDV surveillance.

The subject surveillance requirements were addressed in the staff's Generic Safety Evaluation Report for BWR Scram Discharoe

System, dated December I, 1980.

However, the report did not prescribe the required surveillance conditions.

Since, the changes you have requested have generic impact on other
BWRs, and because the applicable generic safety evaluation is unclear, your request has been forwarded to our Technical Specification Improvements Staff for their review and action.

The additional reviews needed will delay PDR

@DOCK 05 DR gy08033$ 87090 P

~

I 1

I V

N H ~

J y

completion of our action on your request.

Therefore, we will be unable to complete our review prior to your requested date of September 5,

1987.

Please call me if you wish to discuss this matter further.

Sincerely, cc:

See next page Mohan Tha ani, Project Manager Project Directorate I-P.

Division of Reactor Projects I/II

Mr. Harold W. Keiser Pennsylvania Power 5 Lioht Company Susquehanna Steam Electric Station Units 1

5

~

CC:

Jay Si>berg, Esq.

Shaw, Pittman, Potts 5 Trowbridge 2300 N Street N.W.

Washington, D.C.

20037 Bryan A. Snapp, Esn.

Assistant Corporate Counsel Pennsylvania Power 5 Light Company 2 North Ninth Street Al 1 entown, Pennsyl vani a 18101 Mr. E. A. Heckman Licensing Group Supervisor Pennsy'.vania Power 5 Light Companv 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. Loren Plisco Resident Inspector P.O.

Box 52 Shickshinny, Pennsylvania 18655 Mr. R. J.

Benich Services Project Manaqer General Electric Company 1000 First Avenue King of Prussia, Pennsylvania 19406 Mr. Thomas M. Gerusky, Director Bureau of Radiation Protection Resources Commonwealth of Pennsylvania P. 0.

Box 2063 Harrisburg, Pennsyl vania 17120 Robert W. Alder, Esquire Office of Attorney General P.O.

Box 2357 Harrisburg, Pennsylvania 17120 Mr. Jesse C. Tilton, III Allegheny Elec. Coorperative, Inc.

212 Locust Street P.O.

Box 1266 Harrisburg, Pennsylvania 17108-1266 Mr. W. H. Hirst, Manager Joint Generation Projects Department Atlantic Electric P.O.

Box 1500 1199 Black Horse Pike Pleasantville, New Jersey 08232 Regional Administrator, Reoion I U.S. Nuclear Regulatory Commission 631 Park Avenue Ki'ng of Prussia, Pennsylvania 19406

completion of our action on your request.

. Therefore, we will be unable to complete our review prior to your requested date of September 5, 1987.

Please call me if you wish to discuss this matter further.

Sincerely,

/s/

Mohan Thadani, Project Manager Project Directorate I-2 Division of Reactor Projects I/II cc:

See next page PDI-2: D WButler g

~:87 DISTRIBUTION C~J NRCPDR/LPDR PDI-2 Reading SVarga/BBoger MO'Brien MThadani/DFischer OGC - Bethesda EJordan JPartlow

. ACRS (10)

EButcher I-2: PM MThadani:ca

/ '

'87

'q" ~g I I,I I

p I

1 h ~

P

~

Tt I

l 11 p Q Q )

llf F

"i >Fi~j