Forwards Enforcement Conference Repts 50-387/86-06 & 50-388/86-04 on 850530 Re Operation of Unit 1 for Approx 8 Months W/Two Inoperable Transmitters.Evaluation of Appropriate Action Will Be Sent Under Separate Ltr
ML17146A424
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/19/1986
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17146A426 List:
References
NUDOCS 8606260252
Download: ML17146A424 (2)


See also: IR 05000387/1986006

Text

Jun x9 1886

Docket Nos.

50-387

'0-388

License

No. NPF-14/NPF-22

Pennsylvania

Power

5 Light Company

ATTN:

Mr. H.

W. Keiser

Vice President

Nuclear Operations

2 North Ninth Street

Al 1 entown,

Pennsylvania

18101

Gentlemen:

Subject:

Enforcement

Conference for Inspection 50-387/86-06,

50-388/86-04

This letter refers to the enforcement

conference

held

on May 30,

1986,

in the

Region I office, to discuss

the findings addressed

in the Susquehanna

Inspec-

tion 50-387/86-06;

50-388/86-04

regarding

the operation of Unit

1 for about

8

months with two scram discharge

volume level transmitters

inoperable

due to

closed isolation valves.

Conference details are described

in the report enclosed

(Enclosure

1) with this

letter.

Also enclosed is the PAL presentation

which was given at the con-

ference

(Enclosure II).

You will be notified of our evaluation of appropriate

action

by separate

letter.

Your cooperation with us in this matter is greatly appreciated.

Sincerely,

Original. Signing p .

Enclosures:

1.

NRC Region I Enforcement

Conference

Report

2.

Pennsylvania

Power

and Light

Presentation

Richard

W. Starostecki,

Director

Division of Reactor=Projects

8606260252

860619

.,

pgp

~ADOCK 05<><><~~~

PDR ~

OFFICIAL RECORD

COPY

301STROSNIDER6/12/86

0001.0. 0

06/12/86~ gg (

cc w/encl:

A.

R. Sabol,

Manager,

Nuclear guality Assurance

W. E. Barberich,

Licensing Engineer

T.

M. Crimmins, Superintendent

of Plant-SSES

A. J. Pietrofitta, General

Manager,

Power Production Engineering

and

Construction Atlantic Electric

R. J. Benich, Services

Project Manager,

General Electric Company

B.

D. Kenyon, Senior Vice President-Nuclear

Bryan A. Snapp,

Esquire, Assistant Corporate

Counsel

William Matson, Allegheny Electric Cooperative

Public Document

Room (PDR)

Local Public Document

Room (LPOR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

Commonwealth of Pennsylvania

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

ORP Section Chief

I:DRP

Strosnider

6//7/86

~RP

Kist r

6//'mw/86

OFFICIAL RECORD

COPY

R:P

P

Starostecki

6/ig/86

301STROSNIOER6/12/86

0002.0. 0

06/12/86