Category:Meeting Briefing Package/Handouts
MONTHYEARML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML22231B1762022-09-0707 September 2022 Pre-Submittal Meeting - 10 CFR 50.69 and TSTF-505 License Amendment Requests (EPID L-2022-LRM-0065) (Slides) ML21314A0642021-11-10010 November 2021 Pre-submittal Presentation: River Bend Nuclear Station, Unit 1 Relief Request to Adopt Performance Based Testing for Pressure Isolation Valves (Pivs); November 10, 2021 ML21309A0622021-11-0909 November 2021 NRC Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21312A0342021-11-0909 November 2021 Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21266A1122021-08-16016 August 2021 August 16 Predecisional Enforcement Conference Redacted License Slide - September 22, 2021 ML21200A1792021-07-31031 July 2021 Scale/Melcor Non-LWR Source Term Demonstration Project - High Temperature Gas-Cooled Reactor ML21013A0022021-01-25025 January 2021 Public Meeting Slides - River Bend Waste LAR Pre-Sub 1-25-2021 ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20262H2662020-09-22022 September 2020 Pre-Submittal Meeting - Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Offsite Exercise Requirements Due to COVID-19 Pandemic ML19346C9042019-12-17017 December 2019 Pre-Submittal Meeting - Proposed License Amendment Request - Incorporate Tornado Missile Risk Evaluator (TMRE) Into the River Bend Licensing Basis December 17, 2019 ML18275A2722018-09-13013 September 2018 Enclosure 2 - River Bend Station Spent Fuel Pool Criticality Analysis of Boraflex Storage Racks with NETCO-SNAP-IN Rack Inserts ML18283B9402018-09-13013 September 2018 Revised Proprietary Identification for Gnf Pre-Submittal Meeting Presentation on River Bend Station Spent Fuel Pool Criticality Analysis of Boraflex Storage Racks with NETCO-SNAP-IN Rack Inserts ML18228A7432018-08-23023 August 2018 Pre-Submittal Meeting Proposed License Amendment Request Spent Fuel Pool Neutron Absorber Inserts and Criticality Safety Analysis ML18107A7642018-04-17017 April 2018 Additional Topic for the April 18, 2018 Public Telephone Conference with Entergy on River Bend Station, Unit 1 License Renewal Application ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18099A2362018-04-0909 April 2018 Topics for the April 10, 2018 Public Call with Entergy on River Bend Station, Unit 1 License Renewal Application ML17283A3102017-10-12012 October 2017 10/12/2017, Meeting Slide Regarding NRC Pre-application Meeting River Bend Station Spent Fuel Pool Inserts and Criticality Safety Analysis ML17293A5032017-09-12012 September 2017 License Renewal Application Review Public Scoping Meeting 9-19-2017 ML17142A3552017-05-25025 May 2017 05/25/2017 River Bend Station (RBS) License Renewal Application (LRA) NRC Presentation ML17074A3522017-03-29029 March 2017 3/29/2017, Entergy Presentation for River Bend Station Pre-submittal Meeting for Control Building Air Conditioning New Technical Specification License Amendment ML16119A3422016-04-28028 April 2016 Summary of Regulatory Conference to Discuss Safety Significance of River Bend Station Control Building Chilled Water System Apparent Violation ML16092A0342016-04-0101 April 2016 Evaluation of RBS Remote Shutdown Panel Rooms ML16092A0292016-04-0101 April 2016 Technical Paper on Loss of AC Bus Initiator for RBS ML16092A0362016-04-0101 April 2016 Calc Control Sheet Attachment 22 ENTR-078-CALC-003, Rev 4 Page 216 of 219 ML16092A0322016-04-0101 April 2016 PRA Change Summary for Reg Conf Letter 3-22 Final ML16092A0302016-04-0101 April 2016 Response to NRC Concern with Temperature Effects on Safety-Related Electronics in Main Control Room ML16092A0372016-04-0101 April 2016 Potential Greater than Green (a)(4) Violation ML12275A5492012-10-0101 October 2012 Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML1117901522011-05-20020 May 2011 Summary of Annual Performance Assessment Meeting for River Bend Station ML1029403512010-10-19019 October 2010 10/182010 Summary of Public Meeting with Entergy Operations to Discuss Initiatives to Improve Plant Reliability ML0935201272009-12-18018 December 2009 Nrc/Entergy Operations, Inc., Management Meeting ML0920907732009-07-28028 July 2009 July 28, 2009 Meeting Slides from Entergy Operations(River Bend Station) to Discuss Ri ISI ML0812801922008-05-0606 May 2008 04-29-2008 River Bend End-of-Cycle Meeting Summary ML0712005272007-04-30030 April 2007 Nrc/Entergy Operations, Inc. Management Meeting to Discuss the Performance of Arkansas Nuclear One, Cooper, Grand Gulf, River Bend and Waterford, Unit 3 ML0712005252007-04-30030 April 2007 Summary of Annual Performance Assessment Meeting for River Bend Station ML0514501982005-05-25025 May 2005 Summary of Annual Performance Assessment Meeting for River Bend Station ML0510304092005-04-13013 April 2005 Summary of Meeting with Entergy Operations, Inc. River Bend Station Performance and Improvement Initiatives ML0328101732003-09-25025 September 2003 Entergy Operations, Inc.'S Presentation for Management Meeting Held on 09/25/2003. See ML032801514 for Cover Letter and Attendance List ML0323705292003-08-22022 August 2003 Summary of Nrc/Entergy Operations, Inc. Management Meeting ML0229700492002-10-0808 October 2002 Handouts of Meeting with Entergy Operations, Inc., Re Alternative Souce Term License Amendment Application ML0208107562002-03-19019 March 2002 Operator Licensing Workshop Meeting Summary 2023-12-14
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML22231B1762022-09-0707 September 2022 Pre-Submittal Meeting - 10 CFR 50.69 and TSTF-505 License Amendment Requests (EPID L-2022-LRM-0065) (Slides) ML22164A8012022-06-13013 June 2022 Entergy Fleet (GGNS, RBS, and WF-3) - Code Case N-752 RR 6-14-22 Pre-Submittal Public Meeting Presentation Slides ML21319A2452021-11-15015 November 2021 Natrium Energy Island Decoupling Strategy - 11-17-2021 ML21314A0642021-11-10010 November 2021 Pre-submittal Presentation: River Bend Nuclear Station, Unit 1 Relief Request to Adopt Performance Based Testing for Pressure Isolation Valves (Pivs); November 10, 2021 ML21306A3162021-11-0909 November 2021 Digital IC Presentation 11/09/2021 ML21309A0622021-11-0909 November 2021 NRC Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21312A0342021-11-0909 November 2021 Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21266A1122021-08-16016 August 2021 August 16 Predecisional Enforcement Conference Redacted License Slide - September 22, 2021 ML21200A1792021-07-31031 July 2021 Scale/Melcor Non-LWR Source Term Demonstration Project - High Temperature Gas-Cooled Reactor ML21013A0022021-01-25025 January 2021 Public Meeting Slides - River Bend Waste LAR Pre-Sub 1-25-2021 ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20262H2662020-09-22022 September 2020 Pre-Submittal Meeting - Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Offsite Exercise Requirements Due to COVID-19 Pandemic ML19346C9042019-12-17017 December 2019 Pre-Submittal Meeting - Proposed License Amendment Request - Incorporate Tornado Missile Risk Evaluator (TMRE) Into the River Bend Licensing Basis December 17, 2019 ML18283B9402018-09-13013 September 2018 Revised Proprietary Identification for Gnf Pre-Submittal Meeting Presentation on River Bend Station Spent Fuel Pool Criticality Analysis of Boraflex Storage Racks with NETCO-SNAP-IN Rack Inserts ML18275A2722018-09-13013 September 2018 Enclosure 2 - River Bend Station Spent Fuel Pool Criticality Analysis of Boraflex Storage Racks with NETCO-SNAP-IN Rack Inserts ML18228A7432018-08-23023 August 2018 Pre-Submittal Meeting Proposed License Amendment Request Spent Fuel Pool Neutron Absorber Inserts and Criticality Safety Analysis ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18075A1232018-03-20020 March 2018 Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations ML17283A3102017-10-12012 October 2017 10/12/2017, Meeting Slide Regarding NRC Pre-application Meeting River Bend Station Spent Fuel Pool Inserts and Criticality Safety Analysis ML17293A5032017-09-12012 September 2017 License Renewal Application Review Public Scoping Meeting 9-19-2017 ML17249A2502017-09-0606 September 2017 Updated Entergy Handout for River Bend and NRC Public Conference Call on September 11, 2017, to Discuss Technical Specification Task Force Traveler 542 ML17187A0462017-08-0202 August 2017 License Renewal Pre- Application Coordination Meeting 1 River Bend Nuclear Generating Station Unit 1 - Summary of Meeting Held on April 25, 2017 ML17187A0272017-08-0202 August 2017 License Renewal Application, NRC Presentation Summary of Meeting Held on May 25, 2017 ML17142A3552017-05-25025 May 2017 05/25/2017 River Bend Station (RBS) License Renewal Application (LRA) NRC Presentation ML17074A3522017-03-29029 March 2017 3/29/2017, Entergy Presentation for River Bend Station Pre-submittal Meeting for Control Building Air Conditioning New Technical Specification License Amendment ML16119A3422016-04-28028 April 2016 Summary of Regulatory Conference to Discuss Safety Significance of River Bend Station Control Building Chilled Water System Apparent Violation ML12275A5492012-10-0101 October 2012 Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML1134706402011-12-13013 December 2011 Predecisional Enforcement Conference Summary NRC Investigation Report 4-2010-064 ML1117901522011-05-20020 May 2011 Summary of Annual Performance Assessment Meeting for River Bend Station ML1032601252010-11-19019 November 2010 Presentation Slides for the RBS Decommissioning Pec Public Meeting ML1029403512010-10-19019 October 2010 10/182010 Summary of Public Meeting with Entergy Operations to Discuss Initiatives to Improve Plant Reliability ML0935201272009-12-18018 December 2009 Nrc/Entergy Operations, Inc., Management Meeting ML0920907732009-07-28028 July 2009 July 28, 2009 Meeting Slides from Entergy Operations(River Bend Station) to Discuss Ri ISI ML0719002022007-07-0909 July 2007 Summary of Meeting with Entergy Operations, Inc., Regarding Discussion of River Bend Station Plans for Improving Human Performance and Corrective Action Program ML0617802712006-03-0707 March 2006 RIC 2006 Presentation - T2E - Vincent Coulehan - Use of Operating Experience (Regulator/Operator/Licensee) ML0615902322006-03-0707 March 2006 2006/03/07- - RIC 2006 Presentation - T1F - Garry G. Young - License Renewal ML0615901582006-03-0707 March 2006 03/07/2006 - RIC 2006 Presentation - T1E - John F. Mccann - License Renewal ML0607204302006-03-0101 March 2006 March 1, 2006 Public Meeting Slides for Proposed Generic Letter Post-Fire Safe-Shutdown Circuit Analysis Spurious Actuations. ML0532206852005-11-17017 November 2005 Nrc/Entergy Operations, Inc. Management Meeting 11/10/05 ML0514501982005-05-25025 May 2005 Summary of Annual Performance Assessment Meeting for River Bend Station ML0510304092005-04-13013 April 2005 Summary of Meeting with Entergy Operations, Inc. River Bend Station Performance and Improvement Initiatives ML0422602762004-08-12012 August 2004 Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback ML0323705292003-08-22022 August 2003 Summary of Nrc/Entergy Operations, Inc. Management Meeting ML0318902592003-07-0202 July 2003 Summary of Regulatory Conference with Entergy Operations, Inc. River Bend Station ML0314003602003-04-17017 April 2003 Meeting Summary for Annual Performance Assessment for River Bend Station 2023-12-14
[Table view] |
Text
River Bend Station (RBS)
License Renewal Application (LRA)
NRC Presentation May 25, 2017
Agenda
Introductions
2
Introductions
- Bill Maguire - Site Vice President
- Steve Vercelli - General Manager Plant Operations (Management Sponsor for the Project)
- Marvin Chase - Director - Regulatory Assurance and Performance
- Mark Runion - Sr. Manager - Site Projects & Maintenance Services
- Tim Schenk - Manager - Regulatory Assurance
- Jeff Sowa - NRC Sr. Resident Inspector
- Thomas Broussard - RBS LR Project Manager
- Danny Williamson - RBS LR Project Regulatory Assurance Lead
Overview of LRA 4
Overview of LRA GENERAL
- The LRA is a summary of an integrated plant assessment (IPA), time-limited aging analyses (TLAA) evaluations, and an environmental review
Guide 4.2 & NUREG-1437 - environmental review
Overview of LRA LRA Main Sections 1.0 Administrative Information 2.0 Scoping and Screening Methodology for Identifying Structures and Components Subject to Aging Management Review and Implementation Results 3.0 Aging Management Review Results 4.0 Time-Limited Aging Analyses Appendix A - Updated Safety Analysis Report Supplement Appendix B - Aging Management Programs and Activities Appendix C - Response to BWRVIP Action Items Appendix D - Technical Specification Changes - None Appendix E - Environmental Report (with Att. D SAMA Results) 6
Overview of LRA Aging Management Program (AMP) Breakdown
- 43 AMPS: 32 existing programs/11 new programs
- 24 programs - consistent with GALL
- 5 programs take exception to GALL*
- 17 programs have enhancements to meet GALL*
- 1 program is plant specific
- 4 programs contain enhancements & exceptions
- LRA contains 29 commitments in Appendix A 7
Overview of LRA Time-Limited Aging Analyses
- Reactor Vessel Neutron Embrittlement
- Environmental Qualification (EQ) Analyses of Electric Equipment
- Concrete Containment Tendon Pre-stress
- Containment Liner Plate, Metal Containments, and Penetrations Fatigue Analysis
- Other Plant-Specific TLAAs
- Postulation of HELB Locations
- Fluence effects for Reactor Vessel Internals
- Crane Load Cycle Analysis 8
Site Information 9
Site Information
- General Electric (NSSS) - Stone and Webster (constructor)
- BWR-6, Mark III containment
- General Electric turbine generator
- Original licensed thermal power - 2894 MWt
- Current licensed thermal power - 3091 MWt (after uprates in 1999
& 2003)
- Staff complement: approximately 680 10
Site Information Major Plant Modifications/Improvements
- Circulating water pipe coating
- Recirculation pump seal upgrades
- Instrument air system (IAS) dryers
- RWCU piping replacement (to address FAC) 11
Site Information Risk Significant Systems/Components*
- Safety-related 4160kV power
- Safety-related 480V power
- From PRA, Rev 5, System Risk Ranking 12
Lessons Learned 13
Lessons Learned General
- Lessons learned from previous Entergy and other industry license renewal projects utilized in the RBS LRA
- During LRA preparation, Entergy LR team incorporated experience gained from on-going participation in NEI, NRC, and other industry license renewal activities
- Entergy LR team incorporated experience gained from participation in peer reviews of other recent LRAs into the RBS LRA (e.g., Fermi 2; WF3) 14
Lessons Learned Procedural & Logistical Lessons Learned
- Entergy will use the Certrec document portal to make license renewal documentation and information available to the NRC electronically with remote access capability
- Frequent coordination calls between site and corporate project teams-
- Bi-weekly status calls pre-LRA submittal
- Weekly status calls post-LRA submittal
- Additional calls conducted as needed 15
Lessons Learned Procedural & Logistical Lessons Learned
- Entergy procedure provides guidance on preparation for NRC audits/inspections based on previous LR projects
- Entergy conducts refresher training for site program owners and other personnel supporting the audits/inspections
- Entergy will use a database to track and respond to NRC questions and requests during audits/inspections
- During audits/inspections, detailed schedules updated daily are used to track NRC requests for breakout sessions, walk downs, and information 16
Lessons Learned Procedural & Logistical Lessons Learned
- RAI Content and Logistics
- RAI responses will be developed using Entergy procedures
- Initial draft responses typically prepared by experienced LR team members, then sent to the site SMEs and Regulatory Assurance for final approval and concurrence
- RAI response progress is tracked at all stages of development:
including receipt to draft preparation, final review to certification, and then submittal to NRC - to help ensure timely responses 17
Conclusion 18
Conclusion
- RBS LRA planned to be submitted to the NRC by 5/30/2017
Guide 4.2 & NUREG-1437 - environmental review
- LRA submittal begins a 22 - 30 month period of reviews, audits/inspections, RAI responses and other NRC interface activities 19