ML17139D333

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-387/85-34 & 50-388/85-30 on 851104-08.No Violations Noted
ML17139D333
Person / Time
Site: Susquehanna  
Issue date: 12/13/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17139D334 List:
References
NUDOCS 8512180303
Download: ML17139D333 (10)


See also: IR 05000387/1985034

Text

DEC 18 i985

Docket Not. 50-387/ 5 S~

50-388

Pennsylvania

Power

& Light Company

ATTN:

Mr. H.

W. Keiser

Vice President

Nuclear Operations

2 North Ninth Street

Al 1 entown,

Penn syl vani a

18101

Gentlemen:

Subject:

Inspection

Report No. 50-387/85-34

and 50-388/85-30

This refers to the routine safety inspection

conducted

by Mr. F. Paulitz of

this office on November 4-8,

1985, at the Susquehanna

Steam Electric Station,

Units

1 and 2, Berwick, Pennsylvania,

of activities authorized

by

NRC License

Nos.

NPF-14 and

NPF-22

and to the discussions

of our findings held by

Mr. Paulitz with Mr. T. Crimmins and other

members of your staff at the con-

clusion of the inspection.

Areas

examined during this inspection

are described

in the

NRC Region I

Inspection

Report which is enclosed with this letter.

Within these

areas,

the

inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

Within the scope of this inspection,

no violations were observed.

No reply to this letter is required.

Your cooperation with us in this matter

is appreciated.

Sincerely,

Or181~'818

oa Byg

Stewar

D.

E

eter, Director

ivision of Reactor Safety

I

Enclosure:

Combined

NRC Region I Inspection

Report Nos. 50-387/85-34

and

50-388/85-30

il

8512180303

851213

I

PDR

ADOCH, 05000387(

6

PDR~

Iu/

OFFICIAL RECORD

COPY CIR SUS 85-34/30 - 0001.0.0

12/02/85

Pennsylvania

Power

and Light Company

2

cc w/encl:

A.

R. Sabol,

Manager,

Nuclear guality Assurance

W.

E. Barberich,

Licensing Engineer

T.

M. Crimmins, Superintendent

of Plant-SSES

A. J. Pietrofitta,

General

Manager,

Power Production

Engineering

and Construction

Atlantic Electric

R. J.

Benich, Services

Project Manager,

General

Electric Company

B.

D. Kenyon, Senior Vice President-Nuclear

William Matson

Public Document

Room (PDR)

Local Public Document

Room ( LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

Commonwealth of Pennsylvania

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

DRP Section Chief

J. Grant,

DRP

RI:DRS

Paulitz/mjd

12/tl /85

,)4 Q

RI:DRS

Anderson

RI:DRS

Durr

RI: DRS

Ebneter

I2/i~/85

12hr /85

C

cpa

OFFICIAL RECORD

COPY CIR

SOS 85-34/30

0002.0.0

12/02/85

Documents

Reviewed

~Desi

n

APPENDIX A

Design Description Report Diesel Generator

"E" Facility, proposed

Revision

2, dated

September

23,

1985

Design Basis

Document Diesel

Generator

"E" Facility, Revision

1, dated

March 23,

1984

Design Input Technical Specification Diesel Generator

"E" Facility, G-1001,

Revision 2, dated

June 8,

1984

Design Assessment

and gualification of Seismic Category I Equipment Support

for Seismic

and Hydrodynamic

Loads,

G-1024,

Revision

1, dated

May 4,

1984

Procurement

Specification for Diesel

Generator

and Associated

Equipment,

M-1082,

Revision

1

Specification for Transfer Panels

(Safeguards),

E-1026,

Revision

2, dated

March 21,

1985

Specification for Medium Voltage Metal-Clad Switchgear,,

E-1022,

Revision

2, dated

December

28,

1984

Procedure

Plant Modification Design Control Procedure

AD-gA-411, Revision 8, dated

July 29,

1985,

PORC Mtg. No.85-116

Safety Evaluation Plant Modification Request,

PMR 83-812,

4. 16

KV and

Control

System Modification for "E" Diesel Generator

Tie to Diesel

Generators

"A", "B", "C" & "D", dated June

17,

1985

Bus Cable

& Wire Changes for PMR 83-812 to "A" Diesel Generator

during

Technical Specification

LCO

TP-024-023,

TP-024-034,

TP-024-025,

TP-024-026,

TP-024-027,

TP-024-028,

TP-024-029,

TP-024-030,

TP-024-031,

Revision

1,

Revision 0,

Revision 0,

Revision 0,

Revision 0,

Revision 0,

Revision 0,

Revision

1,

Revision 0,

for OB-516

MCC

for OC-521A Control

Panel

for OC-577A Control

Panel

for OC-519A Control

Panel

for OC-520A Switchgear

Panel

for TE-01115A

ESW Temp at

DG

for

ESW Valves

for 2A20104

4KV Bkr

for Retest to demonstrate

design

adequacy

OFFICIAL RECORD

COPY CIR SUS 85-34/30 - 0012.0.0

12/02/85

Appendix A

Dravo Constructors,

Inc. (DCI) Construction Site Procedure

(CSP) 4.5

Preventive

Maintenance,

Revision

1, dated

June

27,

1984

DCI-CPS 7.7 Storage

and Handling of PP&L Supplied Equipment,

Revision

1,

dated August 26,

1985,

(See

Note 1)

DCI-CSP 8.5 Turnover of Diesel

Generator

"E" Facility from DCI to

Pennsylvania

Power and Light (PP&L), Revision

1, dated

September

27,

1985,

(See

Note 2)

PP&L Cable

and Wire Installation Procedure

A-187208, Revision

18

PP&L Conduit and Cable Tray Notes

and Details A-107198,

Revision

20

Note 1:

This document is being revised to include more stringent

storage

PM

requirements

and

new installation procedures

(November 6,

1985)

Note 2:

This document is being revised to include procedures

for Document

Turnover (November 6,

1985)

ualit

Records

DCI-CPS

7 Monthly Inspection

Log Diesel Generator

and Auxiliaries, dated

October

18,

1985

DCI-CPS

7 Weekly Inspection

Log Diesel Generator

and Auxiliaries, dated

October 25,

1985

DCI Preventive

Maintenance

Record

(PRM) Transfer

Panel

Termination Cabinets

Identifier OTC 512 A/C, B/D Weekly from August 30,

1985 to November

1,

1985

DCI-PMR Ventilation Fan,

Supply Air, Identifier OV512E1, Weekly from

August 30,

1985 to November

1,

1985

DCI-Non-Conformance

Report

(NCR)

198 dated October 23,

1985,

125 Volt DC

Distribution Panel

Interference with Anchor Bolts

DCI-NCR 166 dated

September

23,

1985, Ashcroft Switch,

DG Aux Skid Damage

PP&L OQA Surveillance

Log Emergency

Diesel Generator Project,

NQAP Form

12.5-5,

Revision

1, from Surveillance Activity No.

(SAN)84-086 dated

August 9,

1984 to

SAN 85-155 dated

November

1,

1985

PP&L NCR No. 85-0293 dated

May 7,

1985,

Emergency Diesel Generator

"E"

Project,

Location Dravo Laydown Area

OFFICIAL RECORD

COPY CIR SUS 85-34/30 - 0013.0.0

12/02/85

t

~

Appendix A

PP&L Audit Plan for Audit 85-064 from July 16-22,

1985

PP&L Audit Report 85-064

DCI Control of Material Storage,

Preventive

Maintenance

and Housekeeping,

Audit date July 16-22,

1985, Letter to DCI

PCLDC-373 dated July 26,

1985

DCI Response

to

PP&L Audit Report 85-064 Letter DCI-5021-S-155,

dated

August 1,

1985

PP&L Closeout of DCI Corrective Action for Audit Report 85-064 Items,

Letter PCLDC-419, dated August 22,

1985

PP&L Letter

PCLDC-528 to DCI, dated

November

1,

1985,

Advance Transmittal

of Surveillance

Findings from PLNgA Surveillance of Diesel Generator

Installation

and Assembly

No.85-139

PP&L NCR 85-0375 dated July 12,

1985 T.

F.

Cope Cable Tray

PP&L NCR 85-0454 dated October 25,

1985 T.

F.

Cope Cable Tray

~onawin

s

Executive

Summary Fifth Diesel

Schedule

Diesel Generators

Fuel Oil System modified for 5th

DG

Schematic

Diagram Switch Contact

Development Transfer

Panel

OC512A,

B,

C,

D, E107172

Sh.

11, Revision

0

Diesel Generator

"E" Building Equipment

Foundation Detail

No.

103 thru

119,

E198389,

Revision

6

Diesel

Generator

"E" Building General

Arrangement

Plans,

E198216

Sh.

1,

Revision

0

Diesel Generator

"E" Building General

Arrangement Sections,

E198216

Sh.

2, Revision

0

Schematic

Diagram

ESW Diesel

Cooler Valves

Loop A Common,

E146 Sh.

9,

Revision

13,

Sh.

10, Revision

12,

Sh.

11, Revision

14

Mounting of Switchgear

and Transfer Panel,

C904 Sh.

1, Revision 6,

Pages

2, 3,

4 & 5

Diesel Generator Building (A, B,

C,

D) Miscellaneous

Steel

Sections

and

Details,

C917,

Sh.

1, Revision

6

OFFICIAL RECORD

COPY CIR SUS 85-34/30 - 0014.0.0

12/02/85

Appendix A

Diesel Generator Building (A, B,

C,

D) Miscellaneous

Steel

Sections

and

Details,

C917, Interim Drawing Change,

pages

2,

3 & 4, Revision

0

Mounting of Switchgear

& Transfer Panel,

Interim Drawing Change Notice,

CIP 0094,

pages

5, 6, 7,

20 & 21, Revision

0

Drawing X-43-3, X-44-3, Interim Drawing Change Notice,

PMR No. 83-812A,

Drawing No. X-101, Sh.

4, Revision

9

Technical

S ecification

Transmittal

PP&L to NRR, PLA-2346,

Proposed

Amendment

Nos.

58 to NPF-14

and No.

13 to NPF-22,

ER 100450, File 841-8

Transmittal

PP&L to NRR, PLA-2514,

Proposed

Amendment

Nos.

58 to NPF-14

and

No.

13 to NPF-22,

ER 100450/100508,

File 841-8

Transmittal

PP&L to

NRR, PLA-2523, Proposed

Amendment

Nos.

58 to NPF-14

and

No.

13 to NPF-22,

ER 100450/100508,

File 841-8

Transmittal

PP&L to

NRR, PLA-2524,

Proposed

Amendment

Nos.

58 to

NPF-14

and

No.

13 to NPF-22,

ER 100450,

File 841-8

OFFICIAL RECORD

COPY CIR

SUS 85-34/30 - 0015.0.0

12/02/85

'

PURPOSE

APPENDIX 8

EDG 'E'ENERATOR

LEADS ADEQUACY VERIFICATION

The following calculations

are to verify the adequacy

of the generator

power

leads for ampacity

and voltage drop.

INPUTS

generator

load 4,556

KM

3 phase

60 Hertz

0.8 Power Factor

2 cables

per phase

1000

MCM cable size

cable

raceway,

conduit and reinforced concrete

duct bank

4 feet earth cover over duct bank

d-c ohmic resistance

at 25 degree'C

per

1000 feet of 100

MCM cable is

R=O. 01079

ohms

inductive impedance

at 60 Hertz per

1000 feet length of 1000

MCM cable is

X=0.0326

ohms

Conductor temperature

90 degree

C

3 circuits per duct

circuit length

700 feet

ASSUMPTIONS

earth resistivity factor is 90 with 20 degree

C earth temperature

and load

factor of 100

REFERENCE

Insulated

Power Cables

Engineers Association Publication

No. P-46-426,

Page

238

SSES Specification for Diesel

Generator

M-1082, Appendix A, Sheet

5 of 6

General Electric Technical

Data Manual

EB3 Page

51

DESCRIPTION

Calculate

phase current:

4556

KM divided by (1.73

x 4, 160 volts x 0.8 power factor) = 790 ampere

OFFICIAL RECORD

COPY CIR SUS 85-34/30

0016.0.0

12/10/85

Appendix

B

The ampacity from IPCEA P-46-426,

Page

238 for 1000

MCM triplex rubber

8

KV cable,

three circuits per duct with the assumptions

noted

above

= 479 ampere'ince

there

are

two conductors

per phase,

this is 958 amperes.

The cables

wi 1 1

be

loaded for the worst case to 82% of the derated

design

ampacity.

Calculate

voltage drop

The correction factor for conductor temperature

of 90 degree

C to be applied

to the

25 degree

C d-c ohmic resistance

is 1.256

0.01079R

x 1.256

= 0.01355

ohms per

1000 feet corrected

to 90 degree

C

The total

Impedance

Z = Square

root of (R squared

+ x squared)

= 0.03530

ohms

per

1000 feet

Since the circuit length is 700 feet, this is further corrected to (0.03530

x

700 divided by 1000)

= 0.02471

ohms

Since there are

two circuits per phase,

this is further reduced to (0.02471

divided by 2) = 0.01235 total

ohms

The voltage drop is equal

to I x Z = 0.01235

ohms

x 790 amperes

= 9.76 volts

This represents

6% of the

maximum voltage drop between

the 4, 160 volt bus

and

the

4000 volt nominal

equipment rating

CONCLUSION

The inspector did not identify any deficiencies with respect

to the cable size

selected

by the licensee

considering

the cable ampacity

and voltage drop

OFFICIAL RECORD

COPY CIR SUS 85-34/30

0017.0.0

12/10/8'5