DEC 18 i985
Docket Not. 50-387/ 5 S~
50-388
Power
& Light Company
ATTN:
Mr. H.
W. Keiser
Vice President
Nuclear Operations
2 North Ninth Street
Al 1 entown,
Penn syl vani a
18101
Gentlemen:
Subject:
Inspection
Report No. 50-387/85-34
and 50-388/85-30
This refers to the routine safety inspection
conducted
by Mr. F. Paulitz of
this office on November 4-8,
1985, at the Susquehanna
Steam Electric Station,
Units
1 and 2, Berwick, Pennsylvania,
of activities authorized
by
NRC License
Nos.
NPF-14 and
and to the discussions
of our findings held by
Mr. Paulitz with Mr. T. Crimmins and other
members of your staff at the con-
clusion of the inspection.
Areas
examined during this inspection
are described
in the
NRC Region I
Inspection
Report which is enclosed with this letter.
Within these
areas,
the
inspection consisted
of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observations
by the inspector.
Within the scope of this inspection,
no violations were observed.
No reply to this letter is required.
Your cooperation with us in this matter
is appreciated.
Sincerely,
Or181~'818
oa Byg
Stewar
D.
E
eter, Director
ivision of Reactor Safety
I
Enclosure:
Combined
NRC Region I Inspection
Report Nos. 50-387/85-34
and
50-388/85-30
il
8512180303
851213
I
ADOCH, 05000387(
6
PDR~
Iu/
OFFICIAL RECORD
COPY CIR SUS 85-34/30 - 0001.0.0
12/02/85
Power
and Light Company
2
cc w/encl:
A.
R. Sabol,
Manager,
Nuclear guality Assurance
W.
E. Barberich,
Licensing Engineer
T.
M. Crimmins, Superintendent
of Plant-SSES
A. J. Pietrofitta,
General
Manager,
Power Production
Engineering
and Construction
Atlantic Electric
R. J.
Benich, Services
Project Manager,
General
Electric Company
B.
D. Kenyon, Senior Vice President-Nuclear
William Matson
Public Document
Room (PDR)
Local Public Document
Room ( LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
Commonwealth of Pennsylvania
bcc w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encl)
DRP Section Chief
J. Grant,
RI:DRS
Paulitz/mjd
12/tl /85
,)4 Q
RI:DRS
Anderson
RI:DRS
Durr
RI: DRS
Ebneter
I2/i~/85
12hr /85
C
cpa
OFFICIAL RECORD
COPY CIR
SOS 85-34/30
0002.0.0
12/02/85
Documents
Reviewed
~Desi
n
APPENDIX A
Design Description Report Diesel Generator
"E" Facility, proposed
Revision
2, dated
September
23,
1985
Design Basis
Document Diesel
Generator
"E" Facility, Revision
1, dated
March 23,
1984
Design Input Technical Specification Diesel Generator
"E" Facility, G-1001,
Revision 2, dated
June 8,
1984
Design Assessment
and gualification of Seismic Category I Equipment Support
for Seismic
and Hydrodynamic
Loads,
G-1024,
Revision
1, dated
May 4,
1984
Procurement
Specification for Diesel
Generator
and Associated
Equipment,
M-1082,
Revision
1
Specification for Transfer Panels
(Safeguards),
E-1026,
Revision
2, dated
March 21,
1985
Specification for Medium Voltage Metal-Clad Switchgear,,
E-1022,
Revision
2, dated
December
28,
1984
Procedure
Plant Modification Design Control Procedure
AD-gA-411, Revision 8, dated
July 29,
1985,
Safety Evaluation Plant Modification Request,
PMR 83-812,
4. 16
KV and
Control
System Modification for "E" Diesel Generator
Tie to Diesel
Generators
"A", "B", "C" & "D", dated June
17,
1985
Bus Cable
& Wire Changes for PMR 83-812 to "A" Diesel Generator
during
Technical Specification
LCO
Revision
1,
Revision 0,
Revision 0,
Revision 0,
Revision 0,
Revision 0,
Revision 0,
Revision
1,
Revision 0,
for OB-516
for OC-521A Control
Panel
for OC-577A Control
Panel
for OC-519A Control
Panel
for OC-520A Switchgear
Panel
for TE-01115A
ESW Temp at
for
ESW Valves
for 2A20104
4KV Bkr
for Retest to demonstrate
design
adequacy
OFFICIAL RECORD
COPY CIR SUS 85-34/30 - 0012.0.0
12/02/85
Appendix A
Dravo Constructors,
Inc. (DCI) Construction Site Procedure
(CSP) 4.5
Preventive
Maintenance,
Revision
1, dated
June
27,
1984
DCI-CPS 7.7 Storage
and Handling of PP&L Supplied Equipment,
Revision
1,
dated August 26,
1985,
(See
Note 1)
DCI-CSP 8.5 Turnover of Diesel
Generator
"E" Facility from DCI to
Power and Light (PP&L), Revision
1, dated
September
27,
1985,
(See
Note 2)
PP&L Cable
and Wire Installation Procedure
A-187208, Revision
18
PP&L Conduit and Cable Tray Notes
and Details A-107198,
Revision
20
Note 1:
This document is being revised to include more stringent
storage
requirements
and
new installation procedures
(November 6,
1985)
Note 2:
This document is being revised to include procedures
for Document
Turnover (November 6,
1985)
ualit
Records
DCI-CPS
7 Monthly Inspection
Log Diesel Generator
and Auxiliaries, dated
October
18,
1985
DCI-CPS
7 Weekly Inspection
Log Diesel Generator
and Auxiliaries, dated
October 25,
1985
DCI Preventive
Maintenance
Record
(PRM) Transfer
Panel
Termination Cabinets
Identifier OTC 512 A/C, B/D Weekly from August 30,
1985 to November
1,
1985
DCI-PMR Ventilation Fan,
Supply Air, Identifier OV512E1, Weekly from
August 30,
1985 to November
1,
1985
DCI-Non-Conformance
Report
(NCR)
198 dated October 23,
1985,
125 Volt DC
Distribution Panel
Interference with Anchor Bolts
DCI-NCR 166 dated
September
23,
1985, Ashcroft Switch,
PP&L OQA Surveillance
Log Emergency
Diesel Generator Project,
NQAP Form
12.5-5,
Revision
1, from Surveillance Activity No.
(SAN)84-086 dated
August 9,
1984 to
SAN 85-155 dated
November
1,
1985
May 7,
1985,
"E"
Project,
Location Dravo Laydown Area
OFFICIAL RECORD
COPY CIR SUS 85-34/30 - 0013.0.0
12/02/85
t
~
Appendix A
PP&L Audit Plan for Audit 85-064 from July 16-22,
1985
PP&L Audit Report 85-064
DCI Control of Material Storage,
Preventive
Maintenance
and Housekeeping,
Audit date July 16-22,
1985, Letter to DCI
PCLDC-373 dated July 26,
1985
DCI Response
to
PP&L Audit Report 85-064 Letter DCI-5021-S-155,
dated
August 1,
1985
PP&L Closeout of DCI Corrective Action for Audit Report 85-064 Items,
Letter PCLDC-419, dated August 22,
1985
PP&L Letter
PCLDC-528 to DCI, dated
November
1,
1985,
Advance Transmittal
of Surveillance
Findings from PLNgA Surveillance of Diesel Generator
Installation
and Assembly
No.85-139
PP&L NCR 85-0375 dated July 12,
1985 T.
F.
Cope Cable Tray
PP&L NCR 85-0454 dated October 25,
1985 T.
F.
Cope Cable Tray
~onawin
s
Executive
Summary Fifth Diesel
Schedule
Diesel Generators
Fuel Oil System modified for 5th
Schematic
Diagram Switch Contact
Development Transfer
Panel
OC512A,
B,
C,
D, E107172
Sh.
11, Revision
0
Diesel Generator
"E" Building Equipment
Foundation Detail
No.
103 thru
119,
E198389,
Revision
6
Diesel
Generator
"E" Building General
Arrangement
Plans,
E198216
Sh.
1,
Revision
0
Diesel Generator
"E" Building General
Arrangement Sections,
E198216
Sh.
2, Revision
0
Schematic
Diagram
ESW Diesel
Cooler Valves
Loop A Common,
E146 Sh.
9,
Revision
13,
Sh.
10, Revision
12,
Sh.
11, Revision
14
Mounting of Switchgear
and Transfer Panel,
C904 Sh.
1, Revision 6,
Pages
2, 3,
4 & 5
Diesel Generator Building (A, B,
C,
D) Miscellaneous
Steel
Sections
and
Details,
C917,
Sh.
1, Revision
6
OFFICIAL RECORD
COPY CIR SUS 85-34/30 - 0014.0.0
12/02/85
Appendix A
Diesel Generator Building (A, B,
C,
D) Miscellaneous
Steel
Sections
and
Details,
C917, Interim Drawing Change,
pages
2,
3 & 4, Revision
0
Mounting of Switchgear
& Transfer Panel,
Interim Drawing Change Notice,
CIP 0094,
pages
5, 6, 7,
20 & 21, Revision
0
Drawing X-43-3, X-44-3, Interim Drawing Change Notice,
PMR No. 83-812A,
Drawing No. X-101, Sh.
4, Revision
9
Technical
S ecification
Transmittal
Proposed
Amendment
Nos.
58 to NPF-14
and No.
13 to NPF-22,
ER 100450, File 841-8
Transmittal
Proposed
Amendment
Nos.
58 to NPF-14
and
No.
13 to NPF-22,
ER 100450/100508,
File 841-8
Transmittal
PP&L to
Amendment
Nos.
58 to NPF-14
and
No.
13 to NPF-22,
ER 100450/100508,
File 841-8
Transmittal
PP&L to
Proposed
Amendment
Nos.
58 to
and
No.
13 to NPF-22,
ER 100450,
File 841-8
OFFICIAL RECORD
COPY CIR
SUS 85-34/30 - 0015.0.0
12/02/85
'
PURPOSE
APPENDIX 8
EDG 'E'ENERATOR
LEADS ADEQUACY VERIFICATION
The following calculations
are to verify the adequacy
of the generator
power
and voltage drop.
INPUTS
generator
load 4,556
3 phase
60 Hertz
0.8 Power Factor
2 cables
per phase
1000
MCM cable size
cable
raceway,
conduit and reinforced concrete
duct bank
4 feet earth cover over duct bank
d-c ohmic resistance
at 25 degree'C
per
1000 feet of 100
MCM cable is
R=O. 01079
ohms
inductive impedance
at 60 Hertz per
1000 feet length of 1000
MCM cable is
X=0.0326
ohms
Conductor temperature
90 degree
C
3 circuits per duct
circuit length
700 feet
ASSUMPTIONS
earth resistivity factor is 90 with 20 degree
C earth temperature
and load
factor of 100
REFERENCE
Insulated
Power Cables
Engineers Association Publication
No. P-46-426,
Page
238
SSES Specification for Diesel
Generator
M-1082, Appendix A, Sheet
5 of 6
General Electric Technical
Data Manual
EB3 Page
51
DESCRIPTION
Calculate
phase current:
4556
KM divided by (1.73
x 4, 160 volts x 0.8 power factor) = 790 ampere
OFFICIAL RECORD
COPY CIR SUS 85-34/30
0016.0.0
12/10/85
Appendix
B
The ampacity from IPCEA P-46-426,
Page
238 for 1000
MCM triplex rubber
8
KV cable,
three circuits per duct with the assumptions
noted
above
= 479 ampere'ince
there
are
two conductors
per phase,
this is 958 amperes.
The cables
wi 1 1
be
loaded for the worst case to 82% of the derated
design
Calculate
voltage drop
The correction factor for conductor temperature
of 90 degree
C to be applied
to the
25 degree
C d-c ohmic resistance
is 1.256
0.01079R
x 1.256
= 0.01355
ohms per
1000 feet corrected
to 90 degree
C
The total
Impedance
Z = Square
root of (R squared
+ x squared)
= 0.03530
ohms
per
1000 feet
Since the circuit length is 700 feet, this is further corrected to (0.03530
x
700 divided by 1000)
= 0.02471
ohms
Since there are
two circuits per phase,
this is further reduced to (0.02471
divided by 2) = 0.01235 total
ohms
The voltage drop is equal
to I x Z = 0.01235
ohms
x 790 amperes
= 9.76 volts
This represents
6% of the
maximum voltage drop between
the 4, 160 volt bus
and
the
4000 volt nominal
equipment rating
CONCLUSION
The inspector did not identify any deficiencies with respect
to the cable size
selected
by the licensee
considering
the cable ampacity
and voltage drop
OFFICIAL RECORD
COPY CIR SUS 85-34/30
0017.0.0
12/10/8'5