Docket No. 50-387 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 MAR 28 1985 Mr. Norman W. Curtis Vice President - Engineering and Construction - Nuclear Pennsylvania Power 8 Light Company Two North Ninth Street Allentown, PA 18101
Dear Mr. Curti s:
SUBJECT:
ENVIRONMENTAL QUALIFICATION OF ELECTRICAL EQUIPMENT AT SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 - EXTENSION TO SCHEDULAR REQUIREMENTS OF SECTION 50.49(g)
OF 10 CFR PART 50 By a letter dated January 30, 1985, Pennsylvania Power 8 Light Company (PP8L) requested an extension of the deadline for final qualification of electric equipment within the scope of 10 CFR 50.49 and License Condition 2.C.(18)(c) for Susquehanna Steam Electric Stat'ion, Unit 1.
The licensee requests an
,extension pursuant to 50.49(g) from March 31, 1985 to November 30, 1985.
Section 50.49(g) of 10 CFR Part 50 requires that each holder of an operating license issued prior to February 22, 1983, shall by May 20, 1983, identify the elec-trical equipment important to safety within the scope of this section already qualified and submit a schedule for either the qualification to the provisions of'his section or for the replacement of the remaining electrical equipment important to safety within the scope of this section.
This schedule must establish a goal of final environmental qualification of the electrical equip-ment within the scope of this section by the end of the second refueling outage after March 31, 1982, or by March 31, 1985, whichever is earlier.
The rule
.---.-.also provides that the Director of the Office of Nuclear...Reactor Regulation may grant requests for extensions of this deadline 'to a date no later than November 30, 1985, for specific pieces of equipment if these requests are filed on a timely basis and demonstrate good cause for such an extension, such as procurement lead time, task complications and installation problems.
In
- addition, 10 CFR 50.49(h) provides that each licensee shall notify the Commission of any significant equipment problem that may require extension of the completion date provided in paragraph (g) of this section within sixty days of its dis-covery.
Also,, in paragraph (g) of this section, it is stated that the schedule in this paragraph supersedes the June 30, 1982 deadline, or any other previously imposed date, for environmental qualification of electric equipment contained in certain nuclear power operating licenses.
Pennsylvania Power 5 Light Company has indicated that for Susquehanna, Unit 1, technical problems with respect to testing and installation scheduling have delayed completion of the qualification program of certain equipment per requirements of 10 CFR 50.49.
PP8L has further indicated that the equipment for which qualification will not be completed by March 31, 1985 can be divided into two categories:
- 1) equipment for which testing will not be completed, and 2) equipment for which modification is required in order to satisfy quali-fication requirements.
I.
Equipment, for which testing has not been completed:
A.
Conduit Seals During the qualification process PP8L recognized the need'for conduit seals for certain devices, particularly inside containment.
Since there is no existing sealing material or methodology that had been qualified which would envelop the Susquehanna SES in-containment requirements, testing of any new seals is required.
Testing is now un'derway and is expected to be completed after March 31, 1985.
- B.
Silicon Rubber Insulated Cable Silicon rubber insulated cable is used inside the containment for limit"switch and solenoid valve circuits.
This cable (rated at 200'C) was selected based upon vendor qualification test reports.
There is a test in progress to qualify this cable for Susquehanna environmental parameters.
C.
NSIS Cable H
Anaconda NSIS FR-EP cable is used inside the containment for connecting electrical devices.
This cable has been tested by Anaconda to environ-
---mental conditions which envelop the SSES conditions, for all-parameters
- except, beta radiation.
The cable is being tested in conjunction with the test for conduit seals.
II. E ui ment for which modifications are re uired There are a number of equipment items that are having modifications implemented in order to achieve qualification.
These modifications are, currently scheduled for completion during the refueling outage which began in February, 1985 and will end in May; 1985.
The following is a brief description of the modifications.
A
'Replace HVAC Motors (14)
'Replace Namco Limit Switches on Standby Liquid Control
'Add Conduit Seals to Rosemount Transmitters
'Replace Core Spray Pressure Transmitters
'Replace Travis Transmitters.
'Upgrade HPCI Turbine Controls
'Relocate SGTS Radiation Monitors
'Replace PDSL Switches in Common Plenum
'Miscellan'eous Conduit, Sealing We have reviewed the submittal of January 30, 1985, and conclude that the request for extension is timely and within the scope of 10 CFR 50.49(g) and that PPSL has shown good cause for the extension.
The staff has reviewed the Justifications for Continued Operation and finds them acceptable.
Compliance for Category -II components,is-required prior to restart from the current refueling outage.
Compliance for Category I components should be achieved at the earliest practicable time, but in no'event later than November 30, 1985.
We find that Susquehanna, Unit 1's continued operation during the extension period will not adversely affect the public health and safety.
The request for extension of deadline is hereby granted as stated.
Sincerely, cc:
See next page Harold R. Denton, Director Office of Nuclear Reactor Regulation
'Relocate SGTS Radiation t1onitors
'Replace PDSL Switches in Common Plenum
'Miscellaneous Conduit Seali'ng We have reviewed the submittal of January 30, 1985, and conclude that the request for extension is timely and within the scope of 10 CFR 50.49(g) and that PPSL has shown good cause for the extension.
The staff has reviewed the Justifications for Continued Operation and finds them acceptable.
Compliance for Category II components is required prior to restart from the current refueling outage.
Compliance for Category I components should be achieved at the earliest practicable time, but in no event later than November 30, 1985.
We find that Susquehanna, Unit I s continued operation during the extension period will not adversely affect the public health and safety.
The request for extension of deadline is hereby granted as stated.
Sincerely, Origami SR~< bf IL 8, Dsnton Harold R. Denton, Director Office of Nucl ear Reactor Regul ati on cc:
See next page Distribution:
NRC PDR Local PDR PRC System NSIC LB¹2 Reading EHylton RAuluck MCampagnone
- Goldberg, OELD CHiles HDenton WMiller, LFHB EJordan LHarmon TBarnhart (4)
- Previous concurrences concurred on by:
as marked DL:LB¹2 OELD DL:LB 2 DL:LB¹2
- EHylton 03/13/85 RGc DE:E(B$~
VNoonan 03/Zo/85 NRR IR HDe on 03/
/85
- RAuluck:lb
- WShields ASchwencer T
v k 03/13/85, 03/18/85 035i3-/85 03/
85
~ rVYW DE.AQt'ing DIR NRR:DEP DIR JKnight DGEisenhut 03/gi /85 03/
/85
~ D HThompson G3+/85
44 II r
't
)
I p
"VI f
,(J" d I
I 5
P nrh n f (14 t
I'
~,1
'(I
~
hI<<4 I
I
'4 n
t rh I ~
'I' fP KI
"'hrlh-'
~
4 I" II >> r
~ II v
~ h rrh
<<p'
~
I '
r I'<t I l >t tl'Vtct(h p
I
'~
3 I
r
<<t
) )($ Lv (4
<<rl g
9 h
MP I'h, h<< ',"I r)t.;a h
I, V
n h>>
h
',4 I
I hr'.
I I
II
<<tn V
I' Mn V
4 41
~
I r'4 I
h.
~ I <<>>t
),Mr I
I,(
M I
V<< I I
I <<(lt t,
I lt r
'r 4
nt I
I g<< I 1 4 4 I'I
~ Irl g I
M I
h
~ "$
~ <<
'Relocate SGTS Radiation Monitors
'Replace PDSL Switches in Common Plenum
'Miscellaneous Conduit Sealing We have reviewed the submittal of January 30,
- 1985, and conclude that the request for extension is timely and within the scope of 10 CFR 50.49(g) and that PP8L has shown, good cause for the extension.
The staff has reviewed the Justifications for Continued Operation and finds them acceptable.
Compliance for'ategory II components is required prior to restart from the 'current refueling outage.,
Compliance for Category I components should be achieved at the earliest practicable time, but in no event later than November 30, 1985.
We find that Susquehanna, Unit 1's continued operation during the extension period will not adversely affect the public health and safety.
The request for extension of deadline is hereby granted as stated.
Sincerely, cc:
See next page Distribution:
NRC PDR Local PDR PRC System "NSIC LB¹2 Reading EHylton RAuluck MCampagnone Goldberg',
OELD CMiles HDenton WMiller, LFMB EJordan LHarmon TBarnhart (4)
Original Qgiie4 >f Q. R, Osnten Harold R. Denton', Director Office of Nuclear Reactor Regulation
- Previous concurrences concurred on by:
as marked DL'LB¹2 DL:LB¹2 OELD DL:LB NRR)QIR HDe+on 03/0 /85 v
- EHylton
~RAuluck:lb
- WShields ASchwencer v k 03/13/85, 03/13/85, 03/18/85 035'-/85 03/
85 DE:EQBg~
DP'Ahfing DIR NRR:DEP DIR VNoonan J Knight DGEisenhut 03+o/85 03/g.( /85 03/
/85
- D HThompson 03+/85
Sus uehanna Mr. Norman W. Curtis Vice President Engineering and Construction Pennsylvania Power 5 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Jay Silberg, Esq.
Shaw, Pittman, Potts, 5 Trowbridge 1800 M Street, N.
W.
Washington, D.C.=
20036 Edward M. Nagel, Esq.
General Counsel and Secretary Pennsylvania Power 5 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. William E. Barberich Manager-Nuclear Licensing Pennsylvania Power 5 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. R. Jacobs Resident Inspector P.O.
Box 52 Shickshinny, Pennsylvania 18655 Mr. E. B. Poser Project Engineer Bechtel Power Corporation P. 0.
Box 3965 San Francisco, California 94119 Mr. Thomas M. Gerusky, Director Bureau of Radiation Protection Resources Commonwealth of Pennsylvania P. 0.
BOx 2063 Harrisburg, Pennsyl vania 17120 Mr. N. D. Weiss Project Man'ager, Ma'il Code 391
" General Electric Company 175 Curtner.'Avenue San Joke; California 95125 Robert W. Alder, Esquire Office of Attorney General P. 0.