ML17139C690

From kanterella
Jump to navigation Jump to search
Amend 3 to License NPF-22,changing Tech Specs by Modifying Temp Limit for Determining Spray Pond Operability
ML17139C690
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 11/14/1984
From: Schwencer A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17139C691 List:
References
NUDOCS 8411210330
Download: ML17139C690 (7)


Text

gAg REGS

+4 PO Cy

~

Q I

V

+**++

~

~

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 PENNSYLVANIA POWER 8

LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATIVE INC.

DOCKET NO. 50-388 SUS UEHANNA STEAM ELECTRIC STATION UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 3 License No. NPF-22 1.

The Nuclear Regulatory Commission (the Commission or the NRC) having found that:

A.

The application for an amendment filed by the Pennsylvania Power 8 Light Company dated April 10, 1984 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's'egulations and all applicable requirements have been satisfied.

2.

Accordingly, the licensee is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-22 is hereby amended to read as follows:

(2)

Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 3

, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

PPSL shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

841/21 g 05Ooog88

<>ggo:8+111'4'DR ADO pDR '"

p

I

(

e 3.

, This amendment is effective as of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

go/ ] < ]9@

~ic81 BX80GQ by,:

A. Schwencer, Chief Licensing Branch No.

2 Division of Licensing LBP2/

LB82/g, RPrech:dh EH/ Eq'd 10/>/84 10 /

/84 1

L hwencer 10f3)/84 TRTFra k

$6/ 2 /84 15// f/84 I/

P" Q gP y

h 1

M II',r

II, I fl

/

N

'I happ n

II I

r

~ ly e~

II I',,H lt II g

8 I gtlt

~ )

S II/ )(

ih 1

k 4

I <

ATTACHMENT TO LICENSE AMENDMENT NO.

3 F

L G

S NPF-2 D

C N

-388 Replace the following pages of the Appendix "A" Technical Specifications with enclosed pages.

The revised pages are identified by Amendment number and contain vertical lines indicating the area of changes.

REMOVE 3/4 7-3 3/4 7-4 INSERT 3/4 7-3 3/4 7-4

PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM SURVEILLANCE RE UIREMENTS (Continued)

At least once per 18 months by verifying that each pump starts auto-matically when its associated diesel generator starts.

At least once per 18 months by verifying that each automatic valve properly cycles to its proper position in its required time following receipt of an automatic pump start signal.

'SUS(UEHANNA - UNIT 2 3/4 7-3

PLANT SYSTEMS ULTIMATE HEAT SINK LIMITING CONDITION FOR OPERATION 3.7. 1.3 The spray pond shall be OPERABLE.

APPLICABILITY:

OPERATIONAL CONDITIONS 1, 2, 3, 4, 5, and

"~

ACTION:

a

~

With the groundwater level at any spray pond area observation 'well greater than or equal to 663'ean Sea Level (MSL), prepare and submit a Special Report to the Commission pursuant to Specifica-tion 6.9.2 within the next 10 days outlining the cause of the high groundwater level and the plans for restoring the level to within the limit.

b.

With the spray pond otherwise inoperable:

1.

In OPERATIONAL CONDITION 1, 2, or 3, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

2.

In OPERATIONAL CONDITION 4 or 5, declare the RHRSW system and the emergency service water system inoperable and take the ACTION required by Specifications 3.7. 1. 1 and 3.7. 1.2.

3.

In Operational Condition ", declare the emergency service water system inoperable and take the ACTION required by Specification 3.7.1.2.

The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE RE UIREMENTS 4.7.1.3 The spray pond shall be determined OPERABLE by verifying:

a 0 C.

The average water temperature, which shall be the arithmetical average of the spray pond water temperature at the surface, mid and bottom

levels, to be less than or equal to 88'F at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

The water level is greater than or equal to 678'"

MSL USGS, at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

The groundwater level at observation wells 1, 3, 4, 5, 6, and 1113 to be less than 663'SL at least once per 31 days.

SUS(UEHANNA - UNIT 2 3/4 7-4 Amendment No. 3